Loading...
HomeMy WebLinkAboutES1.2 Electrical Site Plan - North 05-05-2020 COORDINATION NOTE: IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT SUPPLIERS TO COORDINATE WITH EACH OTHER AND TO VERIFY THAT THERE ARE NO G GiG G G GIG G CONFLICTS IN LOCATIONS OF DUCTS, CONDUITS, SPRINKLER HEADS, SPRINKLER FIRE RIS PIPING, DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF GENERAL NOTES MATERIALS. HE ) 1 INSTALL P L NEW WORK TO MEET CURRENT CODES AND INSTALLATION STANDARDS. --- Z WIRING SCHEDULE R401TPVCI CONDUT AND#GHTS SHALL BE 0 CU.CON�OCTORS ASS NOTEDDROUND AND IN A UON OT E PLA .ALL•D G GG / WIRING HALL BE INSTALLED TO MEET THE ATI NAL ELECTRIC CODE,PULL BOXESSHALL C O� G G BE REINFORCED CONCRETE AND SHALL BE LOCATED AS SHOWN ON THE PLANS \ 3.THE CIRCUITRYECONDUIT SHOWN IN A DASHED IN OF SHALL O NORMAL POWER, �.\\�\�J \�(� INSTALLED UNDERGROUND PER THE LATEST EDITION OF THE NATION ELECTRIC CODE. \v v G 1 CONDUIT SHALL BE INSTALLED WITH A MINIMUM COVER REQUIREMENT OF 16 INCHES BELOW 1 17"14 7W FINISHED GRADE G 4.COORDINATE FINAL LOCATIONS OF THE LIGHT POLES,MO JUNCTION BOXES WITH FINAL / /"'��.Y � / ROAD AND SIDEWALKS. r� 53 G I FIRE RISER, s.PROVIDE LIGHT POLE BASES PER LIGHT POLE MANUFACTURERS REQUIREMENTS AND C PARKING LOT LIGHT POLE BASE DUAL. 6.CENTER LIGHT POLES WITHIN THEIR RESPECTIVE BOULEVARDS AND COORDINATE LOCATIONS G WITH OTHER OTHER UTILITIES AND/OR LANDSCAPING. G SU ���� G 'D DETENTION PON.D'`�,'. 36 \��� � G D QAe COPROVIDE LIGHT FIXTURE WITH A HOUSENSDE SHIELD. A \ 0 5 a pV O Ct 8ID, 0 a ESE CDs O F F MAILBOX --- - - o ENGINEERING 2 - YECNIN 2 ICAL/ELECTMICAL CONNlf G 7540 C fULT1 NURCNILL RD. B — .1 sa RISEf MAN 1061A282M70821/1 WWW.CDSIENGINEERING.COM T e 2F OF A 5 -- _ -- A E A O J --- 1 Q 54 A 43 Z Z Z LNLJ Q LT 0 .;1;1I,II,,,. A A 2 of W A ui O N N r `I `, m �TLL Ic pA � B4 E _ IQ o L OB s -ED - � EluHED LBY=J.L 7T,\ -ff n-1 Y MAILBOX 5 PLAYGROUND AT R O B E Of 1,125 SF Q 36 S A �N 2 pp w PATIO z w a. D D f n SO F lil li 0 S E 1 17 uo cl SO 5 y BL G. RE O REVISIONS $4 0 NO. DESCRIPTION DATE c 5 4 - I D 4 F P S B) PROJECT: 3 ?� CDSI#2017 DRAWN BY STE,CVD APPROVED STE DATE:MAY 052020 REVISED: . ELECTRICAL SITE PLAN - NORTH ®SITE PLAN-NORTH SHEET NUMBER: !/� SCALER"=25'-0" E S 1 .L