HomeMy WebLinkAboutES1.2 Electrical Site Plan - North 05-05-2020 COORDINATION NOTE:
IT IS ABSOLUTELY NECESSARY FOR ALL
TRADES INCLUDING EQUIPMENT SUPPLIERS
TO COORDINATE WITH EACH OTHER AND
TO VERIFY THAT THERE ARE NO
G GiG
G G GIG
G CONFLICTS IN LOCATIONS OF DUCTS,
CONDUITS, SPRINKLER HEADS, SPRINKLER
FIRE RIS PIPING, DIFFUSERS, ELECTRICAL BOXES
AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF
GENERAL NOTES MATERIALS.
HE ) 1 INSTALL P L NEW WORK TO MEET CURRENT CODES AND INSTALLATION STANDARDS.
--- Z WIRING SCHEDULE R401TPVCI CONDUT AND#GHTS SHALL BE 0 CU.CON�OCTORS ASS NOTEDDROUND AND IN A UON OT E PLA .ALL•D G GG / WIRING HALL BE INSTALLED TO MEET THE ATI NAL ELECTRIC CODE,PULL BOXESSHALL
C O�
G G BE REINFORCED CONCRETE AND SHALL BE LOCATED AS SHOWN ON THE PLANS \
3.THE CIRCUITRYECONDUIT SHOWN IN A DASHED IN OF SHALL O NORMAL POWER, �.\\�\�J \�(�
INSTALLED UNDERGROUND PER THE LATEST EDITION OF THE NATION ELECTRIC CODE. \v v
G 1 CONDUIT SHALL BE INSTALLED WITH A MINIMUM COVER REQUIREMENT OF 16 INCHES BELOW
1 17"14 7W FINISHED GRADE
G 4.COORDINATE FINAL LOCATIONS OF THE LIGHT POLES,MO JUNCTION BOXES WITH FINAL
/ /"'��.Y � / ROAD AND SIDEWALKS. r�
53 G I FIRE RISER, s.PROVIDE LIGHT POLE BASES PER LIGHT POLE MANUFACTURERS REQUIREMENTS AND
C PARKING LOT LIGHT POLE BASE DUAL.
6.CENTER LIGHT POLES WITHIN THEIR RESPECTIVE BOULEVARDS AND COORDINATE LOCATIONS
G WITH OTHER OTHER UTILITIES AND/OR LANDSCAPING.
G
SU ���� G 'D DETENTION PON.D'`�,'.
36 \��� � G
D QAe COPROVIDE LIGHT FIXTURE WITH A HOUSENSDE SHIELD.
A \
0 5
a pV O Ct 8ID, 0
a
ESE
CDs
O F F MAILBOX --- - -
o ENGINEERING
2 - YECNIN 2 ICAL/ELECTMICAL CONNlf
G 7540 C fULT1
NURCNILL RD.
B — .1 sa RISEf MAN 1061A282M70821/1
WWW.CDSIENGINEERING.COM
T e
2F
OF
A 5 -- _ --
A
E
A O J
--- 1 Q
54 A 43 Z
Z Z
LNLJ Q
LT 0
.;1;1I,II,,,. A A
2 of W
A ui O
N N r `I `,
m
�TLL
Ic
pA
� B4 E _ IQ o
L
OB
s -ED - � EluHED LBY=J.L
7T,\ -ff n-1
Y MAILBOX 5 PLAYGROUND AT R O B E
Of 1,125 SF Q
36 S A �N 2 pp
w PATIO z
w
a. D D f n
SO
F
lil li
0 S
E 1
17 uo
cl SO 5 y BL G.
RE O REVISIONS
$4
0 NO. DESCRIPTION DATE
c 5
4 -
I D
4 F P S
B) PROJECT:
3 ?� CDSI#2017
DRAWN BY STE,CVD
APPROVED STE
DATE:MAY 052020 REVISED: .
ELECTRICAL
SITE PLAN -
NORTH
®SITE PLAN-NORTH SHEET NUMBER: !/�
SCALER"=25'-0" E S 1 .L