Loading...
HomeMy WebLinkAboutES1.1 Electrical Site Plan - South 05-05-2020 COORDINATION NOTE: IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT SUPPLIERS TO COORDINATE WITH EACH OTHER AND TO VERIFY THAT THERE ARE NO CONFLICTS IN LOCATIONS OF DUCTS, \�\ \ \ CONDUITS, SPRINKLER HEADS, SPRINKLER ' PIPING, DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS p •D T 10 \ PROJECT BEFORE FINAL PLACEMENT OF p — RIF A \ GENERAL NOTES MATERIALS. D o O 1.INSTALL ALL NEW WORK TO MEET CURRENT CODES AND INSTALLATION STANDARDS. D D D® •D p m \ \ 2.WIRING FOR SITE LIGHTS SHALL BE UNDERGROUND AND IN A MINIMUM OF 1'DIAMETER \J 24 SCHEDULE 40 PVC CONDUIT AND#10 CU.CONDUCTORS AS NOTED ON THE PI-ANS.ALL O D • �Ij�U I D m O WIRING SHALL BE INSTALLED TO MEET THE NATIONAL ELECTRIC CODE.PULL BOXES SHALL D D BE REINFORCED CONCRETE AND SHALL BE LOCATED AS SHOWN ON THE PLANS. p® •D 5 PROP 1 D 1 L .THE CIRCUITRY/CONDUIT SHOWN IN A DASHED UNEPfPE SHALL BE NORMAL POWER, \�J INSTALLED UNDERGROUND PER THE LATEST EDITION OF THE NATION ELECTRIC CODE. \\ \ G • O CONDUIT SHALL BE INSTALLED WITH A MINIMUM COVER REQUIREMENT OF 18 INCHES BELOW \ \v SENI R FINISHED GRACE S4 4,COORDINATE FRAL LOCATIONS OF THE LIGHT POLES,AND JUNCTION BOXES WITH FINAL ROAD AND SIDEWALKS.O P P _ F \ 5.PROVIDE LIGHT POLE BASES PER LIGHT POLE MANUFACTURERS REQUIREMENTS AND 54 F LIT 1 PARKING LOT LIGHT POLE BASE DETAIL. C pr ® 6.CENTER LIGHT POLES WITHIN THEIR RESPECTIVE BOULEVARDS AND COORDINATE LOCATIONS WITH OTHER OTHER UTILITIES AND/OR LANDSCAPING. A A A RISELA \ CONSTRUCTION NOTES F O PROVIDE LIGHT FIXTURE WITH A HOUSE SIDE SHIELD. A 0 54 - B OA A F C3319 13 MAILBOXES ENGINEERING \ YEDNAMAN N ELECTRICAL 74ULTANIf 4FmIlml 5 7540 CHURCHILL RD. \ NANNATflGI MIT ING. 141 1061 282.7088 WWW.GOSIENGINEERING.LON FFJ _ O A POLE WTI LMMINARE TO WT-NO 100 MPH WIND. \ w CONCUR STUDDED: >DJA WPI To H NOHOLE. xuMNER AxD slzE as vDLE \ REOU IRED. F LEVEUNc N_ S OP \ o D�%T. o. . PoMT s --------- F ftEDD. EXERCISE AREA = \ \ M R RNAN- ED IREMEN S T. NO D <B YD \\ \ ...Foft sMDDTH muses r 5 4 B R GRE �C7 iN DI B WX 13 TES 12:D.C. J tLC' -I IT 91 ftouNo T MN.JO BUftv B' NPL GND GDNDUR F.NF.za. 7 S5 ---------- ER EQUIP GROUND COxOUCTER __---__-_-__---__.-„ COAn •, AOH TO TOEINTEft OR OF Po LE Z ol i --------------------- I "C" COxDUR TO xExT PoLE. �! LNLJ L` LL'I + \LL SOURCE DF N POE. .MM%JD50MM(3/4'xl0')GROUND ROD Lu O n m PARKING LOT LIGHT POLE BASE DETAIL E••` _ \ S1. rvo scuE L + L .. Q 0O > RETENTION \ E + D D m S _ POND + \ o ----------------------------------------- i ----------------------------------------------- - \ > � Q -7- m ® I PLAYGROUND z 9 9, 5,275 SF \ v 4 B PROPOSED TR INF./TODDLER PLAYGROUND REVISIONS 715 SF NO. DESCRIPTION DATE S2 B 0 FA L T B PRO D S Q D a D PAVILI N \ \\ PROJECT: D D D D D p \ CDSI#2017 \ DRAWN BY STE,CVD \ APPROVED STE DATE:MAY 062020 REVISED: . ELECTRICAL SITE PLAN - SOUTH N SITE PLAN-SOUT SHEET NUMBER: ES1 . 1