HomeMy WebLinkAboutES1.1 Electrical Site Plan - South 05-05-2020 COORDINATION NOTE:
IT IS ABSOLUTELY NECESSARY FOR ALL
TRADES INCLUDING EQUIPMENT SUPPLIERS
TO COORDINATE WITH EACH OTHER AND
TO VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATIONS OF DUCTS,
\�\ \ \ CONDUITS, SPRINKLER HEADS, SPRINKLER
' PIPING, DIFFUSERS, ELECTRICAL BOXES
AND OTHER ITEMS THROUGHOUT THIS
p •D T 10 \ PROJECT BEFORE FINAL PLACEMENT OF
p — RIF A \ GENERAL NOTES MATERIALS.
D o O 1.INSTALL ALL NEW WORK TO MEET CURRENT CODES AND INSTALLATION STANDARDS.
D D D® •D p m \ \ 2.WIRING FOR SITE LIGHTS SHALL BE UNDERGROUND AND IN A MINIMUM OF 1'DIAMETER \J
24 SCHEDULE 40 PVC CONDUIT AND#10 CU.CONDUCTORS AS NOTED ON THE PI-ANS.ALL O
D •
�Ij�U I D m O WIRING SHALL BE INSTALLED TO MEET THE NATIONAL ELECTRIC CODE.PULL BOXES SHALL
D D BE REINFORCED CONCRETE AND SHALL BE LOCATED AS SHOWN ON THE PLANS.
p® •D 5 PROP 1
D 1 L .THE CIRCUITRY/CONDUIT SHOWN IN A DASHED UNEPfPE SHALL BE NORMAL POWER, \�J
INSTALLED UNDERGROUND PER THE LATEST EDITION OF THE NATION ELECTRIC CODE. \\ \ G
• O CONDUIT SHALL BE INSTALLED WITH A MINIMUM COVER REQUIREMENT OF 18 INCHES BELOW \ \v
SENI R FINISHED GRACE
S4
4,COORDINATE FRAL LOCATIONS OF THE LIGHT POLES,AND JUNCTION BOXES WITH FINAL
ROAD AND SIDEWALKS.O P P
_ F \ 5.PROVIDE LIGHT POLE BASES PER LIGHT POLE MANUFACTURERS REQUIREMENTS AND
54 F LIT 1 PARKING LOT LIGHT POLE BASE DETAIL.
C pr
® 6.CENTER LIGHT POLES WITHIN THEIR RESPECTIVE BOULEVARDS AND COORDINATE LOCATIONS
WITH OTHER OTHER UTILITIES AND/OR LANDSCAPING.
A A A
RISELA \ CONSTRUCTION NOTES
F O PROVIDE LIGHT FIXTURE WITH A HOUSE SIDE SHIELD.
A 0
54 -
B
OA A
F
C3319
13
MAILBOXES ENGINEERING
\ YEDNAMAN N ELECTRICAL 74ULTANIf
4FmIlml 5 7540 CHURCHILL RD.
\ NANNATflGI MIT ING.
141
1061 282.7088
WWW.GOSIENGINEERING.LON
FFJ
_ O A POLE WTI LMMINARE TO WT-NO 100 MPH WIND.
\ w CONCUR STUDDED:
>DJA WPI To H NOHOLE.
xuMNER AxD slzE as vDLE
\ REOU IRED.
F LEVEUNc N_
S OP \ o D�%T.
o. . PoMT s
--------- F ftEDD.
EXERCISE AREA = \ \ M R RNAN-
ED IREMEN S T.
NO
D <B YD \\ \ ...Foft sMDDTH muses r
5 4 B R GRE
�C7 iN DI B WX 13 TES 12:D.C. J
tLC' -I IT 91 ftouNo T
MN.JO BUftv B' NPL GND GDNDUR F.NF.za. 7
S5
---------- ER EQUIP GROUND COxOUCTER
__---__-_-__---__.-„
COAn
•, AOH TO TOEINTEft OR OF Po LE Z
ol i --------------------- I "C" COxDUR TO xExT PoLE. �!
LNLJ
L` LL'I
+ \LL SOURCE DF N POE. .MM%JD50MM(3/4'xl0')GROUND ROD Lu O
n m
PARKING LOT LIGHT POLE BASE DETAIL E••` _
\ S1. rvo scuE L
+ L
.. Q 0O
> RETENTION \ E
+ D D m
S _ POND
+ \
o ----------------------------------------- i
-----------------------------------------------
- \
> � Q
-7- m
® I PLAYGROUND z
9 9, 5,275 SF \ v
4
B PROPOSED TR
INF./TODDLER
PLAYGROUND REVISIONS
715 SF NO. DESCRIPTION DATE
S2 B 0 FA L
T B PRO D
S Q D
a D PAVILI N \
\\ PROJECT:
D D D D D p \ CDSI#2017
\ DRAWN BY STE,CVD
\ APPROVED STE
DATE:MAY 062020 REVISED: .
ELECTRICAL
SITE PLAN -
SOUTH
N SITE PLAN-SOUT SHEET NUMBER:
ES1 . 1