Loading...
HomeMy WebLinkAboutSP135 F.P.E. PAVILION -EXTERIOR ELEVATIONS 05-05-202030' - 0"20' - 0" T.O. SLAB 100' -0" T.O. STEEL (1) 108' -0" T.O. STEEL (2) 112' -0" 312 4' - 0"8' - 0"13' - 6"3' - 8"9' - 10"STEEL POST TIMBER BEAM STEEL PURLIN CONCRETE SLAB 2' - 7"2' - 0 1/2"1' - 11"7' - 0"T.O. SLAB 100' -0" T.O. STEEL (1) 108' -0" T.O. STEEL (2) 112' -0" ABCD STEEL POST STEEL PURLINS 8' - 0"4' - 0"7' - 0"1' - 11"2' - 0 1/2"2' - 7"13' - 6"1 1 T.O. SLAB 100' -0" T.O. STEEL (1) 108' -0" T.O. STEEL (2) 112' -0" A B C D STEEL POST STEEL PURLINS 3' - 7 1/2"9' - 11"13' - 6"4' - 0"8' - 0"1 1 T.O. SLAB 100' -0" T.O. STEEL (1) 108' -0" T.O. STEEL (2) 112' -0" 3 12 STEEL POST TIMBER BEAM STEEL PURLIN CONCRETE SLAB2' - 7"2' - 0 1/2"1' - 11"7' - 0"1' - 6"4' - 0"8' - 0"13' - 6"3' - 8"5' - 10"4' - 0"1 RANDOM WIDTH STANDING SEAM METAL PANEL SIDING EXTERIOR FINISH LEGEND BUILDING LOCATION SITE PLAN KEY N sheet project code address© 2020 INTRINSIKrevisions111 North Tracy Bozeman, Montana 59715 Fax: 406.582.8911Ph: 406.582.8988DRAWINGS FOR PLANNING REVIEW ONLY C:\Users\mmasek\OneDrive - Intrinsik Architecture\_C46BACKUP\Documents\FPE-PAVILION_mmasek321.rvtSP135 FPE FAMILY PROMISE ELC AND DAY CENTER PAVILION F.P.E. PAVILION - EXTERIOR ELEVATIONS 1603 TSCHACHE LANE BOZEMAN, MT 59715 2020-05-05 1/4" = 1'-0"SP135 1 EAST ELEVATION 1/4" = 1'-0"SP135 2 NORTH ELEVATION 1/4" = 1'-0"SP135 3 SOUTH ELEVATION 1/4" = 1'-0"SP135 4 WEST ELEVATION No.DescriptionDate