Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SP126 SENIOR BUILDING -EXT. ELEVATIONS -AREA 'B' 05-05-2020
T.O. SLAB (L1) 100' -0" T.O. SUBFLOOR (L2) 110' -1 3/4" T.O. FOOTING 96' -2" T.O. PLATE (L1) 109' -1 1/8" T.O. PLATE (L2) 119' -2 7/8" T.O. SUBFLOOR (L3) 120' -3 1/2" T.O. PLATE (L3) 129' -4 5/8"+/- T.O. RIDGE41'3 1 1 1 1 3 2 2 21 1 1 1 1 1 1 1 1 3 SF-3 SF-3 SF-2 FIRE DEPT. KNOX BOX FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED T.O. SLAB (L1) 100' -0" T.O. SUBFLOOR (L2) 110' -1 3/4" T.O. FOOTING 96' -2" T.O. PLATE (L1) 109' -1 1/8" T.O. PLATE (L2) 119' -2 7/8" T.O. SUBFLOOR (L3) 120' -3 1/2" T.O. PLATE (L3) 129' -4 5/8"+/- T.O. RIDGE41'3 1 1 1 1 3 2 1 1 1 1 1 1 1 1 1 2 2 2 FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED PORTE COCHERE 111' -6" 2" 12" 4" 12" 4" 12" 2 1 2" 12" 1 2 T.O. SLAB (L1) 100' -0" T.O. SUBFLOOR (L2) 110' -1 3/4" T.O. FOOTING 96' -2" T.O. PLATE (L1) 109' -1 1/8" T.O. PLATE (L2) 119' -2 7/8" T.O. SUBFLOOR (L3) 120' -3 1/2" T.O. PLATE (L3) 129' -4 5/8" T.O. PLATE COMMON AREA 113' -0"+/- T.O RIDGE41'4" 12" 4" 12" 131 6' - 2 7/8"PORTE COCHERE 111' -6" A B C D 1 24 31 3/8" CORRUGATED METAL PANEL - PREFINISHED (COLOR 3) 1 7" EXPOSURE HARDIEPLANK LAP SIDING W/ METAL CORNER TRIM - PAINT FINISH (COLOR 1) EXTERIOR FINISH LEGEND 2 3 7" EXPOSURE HARDIEPLANK LAP SIDING W/ METAL CORNER TRIM - PAINT FINISH (COLOR 2)sheet project code address© 2020 INTRINSIKrevisions111 North Tracy Bozeman, Montana 59715 Fax: 406.582.8911Ph: 406.582.8988DRAWINGS FOR PLANNING REVIEW ONLY C:\Users\mmasek\OneDrive - Intrinsik Architecture\_C46 BACKUP\Documents\PPS - SENIORBUILDING_mmasek321.rvtSP126 PPS SENIOR BUILDING SENIOR BUILDING -EXT. ELEVATIONS -AREA 'B' 1683 TSCHACHE LANE BOZEMAN, MT. 59715 SITE PLAN 2020-05-05 1/8" = 1'-0"SP126 1 SP- EAST ELEVATION - AREA 'B' 1/8" = 1'-0"SP126 2 SP - WEST ELEVATION - AREA 'B' 1/8" = 1'-0"SP126 3 SP - NORTH ELEVATION - AREA 'B' 1/8" = 1'-0"SP126 4 SP - SOUTH ELEVATION - AREA 'B'No.DescriptionDate1