HomeMy WebLinkAboutI - Table of Contents 05-05-2020
May 2020
Arrowleaf Park & Perennial Park
PRELIMINARY PUD & SP-1 APPLICATION
May 2020
PRELIMINARY PUD: Arrowleaf Park & Perennial Park
Table of Contents - Pg. 2
TABLE OF CONTENTS
DOCUMENTS:
Section II: Project Summary & Schedule
Section III: PUD-P & SP-1 Plan Checklist
Section IV: Project Team, Applications, & Fees
Section V: Narrative Response to City Comments
Section VI: List of Relaxations & Justifications
Section VII: Statement of Planning Objectives
Section VIII: PUD Point Calculations
DRAWINGS:
Architecture
SP000 Site Plan Cover Sheet
SP001 Site Vicinity & Block Frontage Plan
SP002 Site Plan
SP003 Site Details
SP004 Site Details
SP101 Comm. Building - First Floor Plan
SP102 Comm. Building - Roof Plan
SP103 Comm. Building - Exterior Elevations
SP104 Comm. Building - Exterior Elevations
SP105 12 Unit - First Floor Plan
SP106 12 Unit - Second Floor Plan
SP107 12 Unit - Third Floor Plan
SP108 12 Unit - Roof Plan
SP109 12 Unit - Exterior Elevations
SP110 12 Unit - Exterior Elevations
SP111 24 Unit - First Floor Plan
SP112 24 Unit - Second Floor Plan
SP113 24 Unit - Third Floor Plan
SP114 24 Unit - Roof Plan
SP115 24 Unit - Exterior Elevations
May 2020
PRELIMINARY PUD: Arrowleaf Park & Perennial Park
Table of Contents - Pg. 3
SP116 24 Unit - Exterior Elevations
SP117 Rowhouse (E) - First & Second Floor Plan
SP118 Rowhouse (E) - Third Floor & Roof Plan
SP119 Rowhouse (E) - Exterior Elevations
SP120 Rowhouse (W) - First & Second Floor Plan
SP121 Rowhouse (W) - Third Floor & Roof Plan
SP122 Rowhouse (W) - Exterior Elevations
SP123 Senior Building - Overall Building Plans
SP124 Senior Building - Overall Exterior Elevations
SP125 Senior Building - Exterior Elevations - Area 'A'
SP126 Senior Building - Exterior Elevations - Area 'B'
SP127 Senior Building - Exterior Elevations - Area 'C'
SP128 Senior Building - Exterior Elevations - Area 'D'
SP129 Family Promise Center - Level One Floor Plan
SP130 Family Promise Center - Level Two Floor Plan
SP131 Family Promise Center - Roof Plan
SP132 Family Promise Center - Exterior Elevations
SP133 Family Promise Center - Exterior Elevations
SP134 F.P.E. Pavilion - Floor & Roof Plan
SP135 F.P.E. Pavilion - Exterior Elevations
SP136 Comm. Health Partners - First Floor Plan
SP137 Comm. Health Partners - Second Floor Plan
SP138 Comm. Health Partners - Roof Plan
SP139 Comm. Health Partners - Exterior Elevations
Civil
C0.0 Title Sheet
C0.1 Notes, Legend & Abbreviations
C1.0 Existing Conditions & Survey Data
C1.1 Topographic Survey
C2.0 Erosion Control and Construction Management Plan
C2.1 Erosion Control Details
C3.0 Overall Site Plan
C3.1 Site Plan - North
May 2020
PRELIMINARY PUD: Arrowleaf Park & Perennial Park
Table of Contents - Pg. 4
C3.3 Site Plan - South
C4.0 Overall Grading Plan
C4.1 Grading Plan - North
C4.2 Grading Plan - South
C4.3 Storm Drainage Plan & Profile
C4.4 Storm Drainage Plan & Profile
C4.5 Storm Drainage Plan & Profile
C4.6 Pond Details
C5.0 Overall Utility Plan
C5.1 Sewer Plan & Profile
C5.2 Sewer Plan & Profile
C5.3 Water Plan & Profile
C5.4 Water Plan & Profile
C6.0 Construction Details
Landscape
L000 Overall Site Plan
L001 Site Legends
L002 Site Legends
L003 Site Legends
L004 Site Legends
L300 Overall Landscape Site Plan
L301 Storm Water Ponds And Trial Planting Plan
L302 Watercourse Setback Planting Plan
L303 Parking Lot Planting Plan
L304 Parking Lot Planting Plan
L305 Boulevard Planting Plan
L306 Community Health Partners Planting Plan
L307 Family Promise Planting Plan
L308 Senior Center Planting Plan
L309 Senior Center Planting Plan
L310 Senior Center Planting Plan
L311 Multi-Family Units Planting Plan
L312 Multi-Family Units Planting Plan
May 2020
PRELIMINARY PUD: Arrowleaf Park & Perennial Park
Table of Contents - Pg. 5
L313 Multi-Family Units Planting Plan
L314 Rowhouses A Planting Plan
L315 Rowhouses B Planting Plan
L500 Landscape Details
L501 Landscape Details
L600 Irrigation Water Use Calculations And Methods
L601 Irrigation Designation Sheet
Electrical
ES1.1 Electrical Site Plan - South
ES1.2 Electrical Site Plan - North
ES1.3 Photometric Plan - South
ES1.4 Photometric Plan - North
ES1.5 Schedule & Legend
ES1.6 Cut Sheets
APPENDICES:
Appendix A: Title Report
Appendix B: PUD-P Exhibits
B.1 - Parcel and Site Context Map
B.2 - Site Conditions Within 1/2 Mile
B.3 - Existing Zoning Map
B.4 - Future Land Use Map
B.5 - Parks, Trails, and Wetlands Map
B.6 - PROST Trail Map
B.7 - Relaxation Graphic
B.8 - Open Space Map
B.9 - Land Use Ratios
B.10 - Site Circulation
Appendix C: Traffic Impact Study
Appendix D: Wetland and Weed Report
Appendix E: Affordable Housing Plan and Attachments
Appendix F: Design Manual Draft, Covenants (Master Declaration) & Bylaws
Appendix G: SID Waiver
May 2020
PRELIMINARY PUD: Arrowleaf Park & Perennial Park
Table of Contents - Pg. 6
Appendix H: Concurrent Construction Request Letter
Appendix I: Reference Documents
I.1 - Saccoccia PUD Design Guidelines
I.2 - Lowes Updated PUD Design Guidelines
I.3 - Lowes PUD MOD Approval
I.4 - Recorded ECCRs
I.5 - Amended ECCRS
I.6 - Final Plat 407
I.7 - Final Plat 407A
I.8 - Site Plan Reference Map
I.9 - Limited Agent Authorizations
I.10 - CUP Conditions of Approval
I.11 - Lowes CUP PUD Approval
I.12 - Saccoccia Subdivision Final Plat Approval
Appendix J: Project Schedule
Appendix K: Amended Plat
Appendix L: Stormwater Report
Appendix M: Water & Sewer Report
Appendix N: HRDC Streamline Letter
Appendix O: Parking Reference Letter
Appendix P: GWC Letter of Partnership