Loading...
HomeMy WebLinkAboutI - Table of Contents 05-05-2020 May 2020 Arrowleaf Park & Perennial Park PRELIMINARY PUD & SP-1 APPLICATION May 2020 PRELIMINARY PUD: Arrowleaf Park & Perennial Park Table of Contents - Pg. 2 TABLE OF CONTENTS DOCUMENTS: Section II: Project Summary & Schedule Section III: PUD-P & SP-1 Plan Checklist Section IV: Project Team, Applications, & Fees Section V: Narrative Response to City Comments Section VI: List of Relaxations & Justifications Section VII: Statement of Planning Objectives Section VIII: PUD Point Calculations DRAWINGS: Architecture SP000 Site Plan Cover Sheet SP001 Site Vicinity & Block Frontage Plan SP002 Site Plan SP003 Site Details SP004 Site Details SP101 Comm. Building - First Floor Plan SP102 Comm. Building - Roof Plan SP103 Comm. Building - Exterior Elevations SP104 Comm. Building - Exterior Elevations SP105 12 Unit - First Floor Plan SP106 12 Unit - Second Floor Plan SP107 12 Unit - Third Floor Plan SP108 12 Unit - Roof Plan SP109 12 Unit - Exterior Elevations SP110 12 Unit - Exterior Elevations SP111 24 Unit - First Floor Plan SP112 24 Unit - Second Floor Plan SP113 24 Unit - Third Floor Plan SP114 24 Unit - Roof Plan SP115 24 Unit - Exterior Elevations May 2020 PRELIMINARY PUD: Arrowleaf Park & Perennial Park Table of Contents - Pg. 3 SP116 24 Unit - Exterior Elevations SP117 Rowhouse (E) - First & Second Floor Plan SP118 Rowhouse (E) - Third Floor & Roof Plan SP119 Rowhouse (E) - Exterior Elevations SP120 Rowhouse (W) - First & Second Floor Plan SP121 Rowhouse (W) - Third Floor & Roof Plan SP122 Rowhouse (W) - Exterior Elevations SP123 Senior Building - Overall Building Plans SP124 Senior Building - Overall Exterior Elevations SP125 Senior Building - Exterior Elevations - Area 'A' SP126 Senior Building - Exterior Elevations - Area 'B' SP127 Senior Building - Exterior Elevations - Area 'C' SP128 Senior Building - Exterior Elevations - Area 'D' SP129 Family Promise Center - Level One Floor Plan SP130 Family Promise Center - Level Two Floor Plan SP131 Family Promise Center - Roof Plan SP132 Family Promise Center - Exterior Elevations SP133 Family Promise Center - Exterior Elevations SP134 F.P.E. Pavilion - Floor & Roof Plan SP135 F.P.E. Pavilion - Exterior Elevations SP136 Comm. Health Partners - First Floor Plan SP137 Comm. Health Partners - Second Floor Plan SP138 Comm. Health Partners - Roof Plan SP139 Comm. Health Partners - Exterior Elevations Civil C0.0 Title Sheet C0.1 Notes, Legend & Abbreviations C1.0 Existing Conditions & Survey Data C1.1 Topographic Survey C2.0 Erosion Control and Construction Management Plan C2.1 Erosion Control Details C3.0 Overall Site Plan C3.1 Site Plan - North May 2020 PRELIMINARY PUD: Arrowleaf Park & Perennial Park Table of Contents - Pg. 4 C3.3 Site Plan - South C4.0 Overall Grading Plan C4.1 Grading Plan - North C4.2 Grading Plan - South C4.3 Storm Drainage Plan & Profile C4.4 Storm Drainage Plan & Profile C4.5 Storm Drainage Plan & Profile C4.6 Pond Details C5.0 Overall Utility Plan C5.1 Sewer Plan & Profile C5.2 Sewer Plan & Profile C5.3 Water Plan & Profile C5.4 Water Plan & Profile C6.0 Construction Details Landscape L000 Overall Site Plan L001 Site Legends L002 Site Legends L003 Site Legends L004 Site Legends L300 Overall Landscape Site Plan L301 Storm Water Ponds And Trial Planting Plan L302 Watercourse Setback Planting Plan L303 Parking Lot Planting Plan L304 Parking Lot Planting Plan L305 Boulevard Planting Plan L306 Community Health Partners Planting Plan L307 Family Promise Planting Plan L308 Senior Center Planting Plan L309 Senior Center Planting Plan L310 Senior Center Planting Plan L311 Multi-Family Units Planting Plan L312 Multi-Family Units Planting Plan May 2020 PRELIMINARY PUD: Arrowleaf Park & Perennial Park Table of Contents - Pg. 5 L313 Multi-Family Units Planting Plan L314 Rowhouses A Planting Plan L315 Rowhouses B Planting Plan L500 Landscape Details L501 Landscape Details L600 Irrigation Water Use Calculations And Methods L601 Irrigation Designation Sheet Electrical ES1.1 Electrical Site Plan - South ES1.2 Electrical Site Plan - North ES1.3 Photometric Plan - South ES1.4 Photometric Plan - North ES1.5 Schedule & Legend ES1.6 Cut Sheets APPENDICES: Appendix A: Title Report Appendix B: PUD-P Exhibits B.1 - Parcel and Site Context Map B.2 - Site Conditions Within 1/2 Mile B.3 - Existing Zoning Map B.4 - Future Land Use Map B.5 - Parks, Trails, and Wetlands Map B.6 - PROST Trail Map B.7 - Relaxation Graphic B.8 - Open Space Map B.9 - Land Use Ratios B.10 - Site Circulation Appendix C: Traffic Impact Study Appendix D: Wetland and Weed Report Appendix E: Affordable Housing Plan and Attachments Appendix F: Design Manual Draft, Covenants (Master Declaration) & Bylaws Appendix G: SID Waiver May 2020 PRELIMINARY PUD: Arrowleaf Park & Perennial Park Table of Contents - Pg. 6 Appendix H: Concurrent Construction Request Letter Appendix I: Reference Documents I.1 - Saccoccia PUD Design Guidelines I.2 - Lowes Updated PUD Design Guidelines I.3 - Lowes PUD MOD Approval I.4 - Recorded ECCRs I.5 - Amended ECCRS I.6 - Final Plat 407 I.7 - Final Plat 407A I.8 - Site Plan Reference Map I.9 - Limited Agent Authorizations I.10 - CUP Conditions of Approval I.11 - Lowes CUP PUD Approval I.12 - Saccoccia Subdivision Final Plat Approval Appendix J: Project Schedule Appendix K: Amended Plat Appendix L: Stormwater Report Appendix M: Water & Sewer Report Appendix N: HRDC Streamline Letter Appendix O: Parking Reference Letter Appendix P: GWC Letter of Partnership