Loading...
HomeMy WebLinkAboutResponse to comments civil MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: SARAH ROSENBERG, PLANNER II FROM: ANNA RUSSELL, ENGINEER II RE: CAR WASH BURKE STREET SITE PLAN REVISION 1 REVIEW APPLICATION NO. 19318 DATE: DECEMBER 9, 2019 ----------------------------------------------------------------------------------------------------------- ENGINEERING COMMENTS: 1. Include the Public Utility easement for the proposed sewer main on the amended plat. The easement has been added to the amended plat 2. Include the proposed Road and Access easement on the amended plat. The easement has been added to the amended plat 3. Show the proposed Road and Access easement on the Overall Site Plan prior to Site Plan approval. This easement has been shown and labeled on the overall site plan 4. Label the line highlighted in the screenshot below on the Overall Site Plan prior to Site Plan approval. This utility easement has been labeled on the overall site plan Code Corrections 5. DSSP II.A.e – General Design Criteria. The stormwater design report must include stormwater chase (25 year conveyance) calculations. This has been included. 6. DSSP II.A.1. – General Design Criteria. The area behind the building in DA#4 will require a swale to contain runoff. As designed, the contours show the runoff being directed onto the adjacent property. A swale has been added to DA #4 7. DSSP II.C.4.a. Storm/Treatment Facilities Additional Requirements. To prevent short circuiting This comment was addressed with the previous site plan resubmittal 8. BMC 38.410.080.H - Grading and Drainage. Stormwater Retention Basin 1 will require more landscaping to meet the code requirements. Conditions of Approval 9. Provide easements for all public utilities with exhibits prior to Site Plan approval. Drafts of the easements have been included with this resubmittal for your review 10. The approved stormwater maintenance plan must be incorporated into the Owners Association Documents and a copy submitted prior to Site Plan approval. 11. The applicant must contact Brian Heaston with the City Engineering Department to obtain a determination of cash-in-lieu (CIL) of water rights. Payment will be required prior to Site Plan Approval. 12. The submitted Waiver of Right to Protest Creation of Special Improvement Districts (SID) needs to be notarized. Information about the site (legal description) and reference to Site Plan Approval must be filled in the blanks. The applicant must provide and file with the County Clerk and Recorder's office the executed SID waiver prior to Site Plan approval.