Loading...
HomeMy WebLinkAboutNarrative-Review responses 6-11-19 - CopyCity of Bozeman 11 June 2019 Planning Department RE: Gallatin Center PUD – Lots 5, 6 & 7 Concept Review Application 18493, narrative and applicant responses. Narrative Proposed is a full service car wash facility offering state of the art efficient wash tunnel, vacuum and detailing facilities. Initial Concept Review Application was prepared by Intrinsik Architecture in Novem- ber 2018. Through the Concept Review Application process, a Conceptual Site Plan was agreed upon with the City, owner and architects, Intrinsik Architecture. Stefan Associates was hired in April 2019 to complete the next application, a Site Plan Application for City approval. Stefan Associates requested further definition of review comments and conceptual site plan from City planning staff. It was explained to Stefan Associates that the Planning Department would not be able to assist the completion of a Site Plan Application. The enclosed Site Plan Application represents Stefan Associates and Owners response to the Concept Review Comments and meeting current planning guidelines and ordinances. We appreciate your feedback and comments. Concept Review Responses: Planning Division 1. See Application submittals, CCOA & NCOD not applicable. 2. See above and following. 3. a & b see enclosed drawings A1-A3 4. Enclosed 5. Enclosed see L1 Engineering Division 1. Site consists of lot 5&6. a. See C2.1 Utilities Plan b. See C2.1 Utilities Plan c. See Wetland Delineation Report 2. See Storm Water Report & Calculations 3. See C2.2 & Storm Water Report 4. See C2.2 and easement agreement 5. Maximum capacity of the Wash facility is 120 cars per hour occurring at off-peak hours (M-F after 5 and S/S). 6. See C1.0 & C2.0 Overall Site Plan 7. See C2.1 & C3/1, 2 separators provided. 8. See C1.0 Overall Site Plan 9. “ 10. “ 11. Documents enclosed.