HomeMy WebLinkAbout03 C1.1 - Dimension Plan - Lounge 04-20-2020 � I I � WIDE ENTRYWAY CORRIDOR
ACCESS EASEMENT FL OF EX.
O¢ DITCH m
5 II I n T z 3
WATER MAIN SCALE o
J \ I�i �I ` �I II J ►� 0 10' 20' 49
T FEN
EXT'G 10' WIDE
/ 14.5' lu
5.0'
G G G ASPHALT TRAIL Q
2.3' UP y CS � (S'
/ cR4.5• R4.5' 7 _ ..I 8 0 ti0 0
32.0' 9.8' R4.5' 99.0' 9.5 R4.5'0 18.0' a 3 M
I�
EX. LIGHT
9(TYP) 7 3 tvil•a POLE WITH
20.0 P M`ON TAN.9
' N 40 MPH SIGN
'dl crvais G.
Iws w 1 rv"eioers PE �
PROPOSED
TOWN PUMP 6
LOUNGE
\ c
20.0' 96.0' i 30' W DELI WTR
EA S MENT DRAWN BY: CGB
/ \/ 6, 1 1 REVIEWED BY: BLB
R4.5' n
\ R4.5' O -I
5.0' PROJECT ENGINEER:CGB
1 f
\\ = 24.0' o 1 1
DESIGNED BY:CGB
EX. CONC.
R4.5• 99.0, 9' R4.5' MEDIAN
7' PROPOSED
TOWN PUMP 6
18.0' Ras' LOUNGE 1 ,
32.0' I " 1 3 1
J223
26,0'R20.0' 15' FRONTYARD i- - - SETBACK _ _ _ _ _ f a ° 9 5y EX. TELEPHONE
____ _ -__ __��____ ____________24.5___ ___ __ - IBEROPTIC BOX
& F
G 10
10' RUE
P UP UP �® -UP UP UP -UP -UP UP UP UP UP UP UP IP UP UP -4-3'e' Nj1eA6S7'E 3
p R25.0' S89"56'29'E 433.57' I r�T�7y1
EXT'G CURB & ® (y
<�. R20'a4 EXT'G GUTTER E..I
SIDEWALK
w w w_w w w w ,w� w w w w wN w w w w w C.�
�� dll II $„ D.I.
WATER MAIN \� 8" D.I. 3
S s 6\ S 0 S S S S S S S-WATER MAIN_S S s�.'. S > BENCHMARK
III 1 i FH ARROW BOLT
BENCHMARK i i -,� <8-I•-I W N
FH ARROW BOLT IIIIII i 8" SWR PVC KIlIZBERWICKE 4705.66
IIIIII SAN SWR MAIN
-�-l8 i i SSMH RIM 4
4695.87
695
01.79 8" INV OUT 4695 Q ,{
.87 "1
IN 4693.22 ��
OUT 4693.01 a i 3 ^~ to
S 89.56'29 E 408.69'
- - - - -- - - - - - - - - - - - - - - - - - - - - - - � \ 5,1
4" SAN SWR
L� INV IN 669.6.72 �\\���T 8I
Q[-p' FUTURE BLDG
- IF _ � � _= II
II SITE
�� I 1 I
n I LEGEND
TOOLED JOINT(1" DEEP) 4771 MINOR CONTOUR (1") 0 FOUND MONUMENT AS NOTED 0-4 N
-4775 6 CONTROL POINT W
1/4' CONCRETE SIDEWALK AND MAJOR CONTOUR (5') oty �
4" THICK P.C.C. CURB BROOM FINISH ------- PROPERTY LINE/ROW BENCHMARK
METAL LANDSCAPE 6" TOPSOIL SIDEWALK h+{ cn ^'
4 GRASSED SEE SITE PLAN - EASEMENT LINE SEWER MANHOLE n
SLOPE EDGING (TYP) _ -
1 FINISH GRADE. � _ � - - FENCE 0 SEWER yyg7ER VALVE
� A
IIIIIII III II TOP OF ROCK ill III_ o SEWER MAIN �
10' DIA. II III=III III ILL- -® - FIRE HYDRANT ..10
IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII-IIIIII - 6' -III III III=III III III= 3" COMPACTED SEWER SERVICE
II = i b� _ _III III III CRUSHED "- �U
✓\/ WATER MAIN ® CURB STOP
fllI I�LIl LII III-��111=1T�111-ill l l �l -CRUSHED
BASE j/////////j///// 3" COMPACTED CRUSHED
III=111 III III J�-I-II III=1T - _ III-III 111=11 III -III-1-III- \��A��A����A��A��A�� -ws-ws- w WATER WELL o `�
- lii -III III III ROCK BASE WATER SERVICE
II_,III iiIIL11111111111111111111111111 Ilia II COMPACTED
IHiI Ili IIIIII-IIIIII Ilr ✓/�/j�%jam%�//� -�-�- STREET SIGN 3
-TLI11= fti I IIIf= III 1T�111 1T�111 TI- �/� SUBGRADE COMPACTED SUBGRADE FIRE SERVICE
ll- I-11=III /j�ji �. a BOLLARD Z
18 OZ. FILTER FABRIC. 11111ii=III III III=III III-III=1 STORM MAIN ii�� _
_ 2' OVERLAP IHIHIHIH LIIF,I� -�-°P � LIGHT POLE
=III- III=T�lll=11 OVERHEAD POWER C�
III II 111-111-III II? NATIVE MATERIAL W
�I II III II II III-II II TA
III=11I III III-I I11= TOOLED CONTROL,JOINT DETAIL, OVERHEAD TELEPHONE `� POWER POLE �I F
II-III IITi_ L-IIHIII -o -o - b v
- - - - UNDERGROUND GAS GUY ANCHOR
r, NOTES: -2.-2.- UNDERGROUND PHONE
pp ELECTRICAL PEDESTAL 0000
EXT'G NATIVE 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 4" MIN. -` UNDERGROUND ELECTRIC ® ELECTRICAL METER
12' MIN ,o `I, GRAVELS 2. SIDEWALKS SHALL SLOPE AWAY FROM STRUCTURES AND BUILDINGS AS - - ROAD CENTERLINE ® TELEPHONE PEDESTAL °
SHOWN ON GRADING PLAN. MAXIMUM CROSS SLOPE - 2% E
INSTALL 6" DIA. FREE DRAINING ROUND ROCK FROM 3. CONCRETE SHALL BE 4,000 PSI ®28 DAYS. CURB & GUTTER ® GAS METER SHEET
FINISH GRADE TO 12" BELOW EXT'G GRAVEL LAYER. 4. CONTRACTION JOINTS SHALL BE PLACED AT 5' INTERVALS EDGE OF PAVEMENT D4 GAS VALVE CJ 1
ENGINEER SHALL BE ON-SITE DURING EXCAVATION TO 5. EXPANSION JOINT MATERIAL SHALL BE PLACED AT 50' INTERVALS a TEST PIT
I DETAIL VERIFY FREE DRAINING GRAVEL MATERIAL DEPTH. 2 DETAIL EDGE OF GRAVEL
EDGE OF CONCRETE C PERC TEST � TOWN PTJMP 6I.OUNGE
EDGE OF BUILDING !- TREE CONIFER (SIZE AS NOTED) m DIMENSION PLAN
at STORM WATER RETENTION& INFILTRATION BASIN Cl t CONCRETE SIDEWALK TREE DECIDUOUS (SIZE AS NOTED) i PROJECT:18-1 17
N.T.S. N.T.S. UNDERGROUND GAS i
-°"-°`- UNDERGROUND ELECTRIC a DATE:XX/XX/XX