Loading...
HomeMy WebLinkAbout02 C1.0 - Site Plan - Lounge 04-20-2020 1 l 1 / I FUTURE BLDG SITEFL OF EX. I 3 I STREET 50' WIDE ENTRYWAY CORRIDOR DITCH STORMWAILK RETENTION SETBACK AND PUBLIC 3 - r \ AND INFILTRATION BASIN. END OF ROAD ACCESS EASEMENT 8 °� SEE CIVIL GRADING AND NAGE (TYP) T z / \ DRAINAGE PLAN. / PROPOSED TRASH ENCLOSURE 12" D. ( WITH CONCRETE SLAB. SEE 3 I. scnir.E o ARCHITECTURAL FOR DETAIL WATER MAIN O FUTURE 8" PVC SAN SWR PROPOSED EDGE 0 IW 2W 10' MAIN EXTENSION. NOT IN -- ---- - - I 1 - OF PAVEMENT - - - - L1 J THIS� I PROJECT I I I 10' PUBLIC UTILITY~ I 3 1" 20' I EASEMENT SNOW I n I I F+\\ STORAGE I I I I� PROPOSED ,w AREA/ GAS SERVICE( 3 IF1( z PROPOSED TEMPORARY p 1 PROPOSED 2 I I e BLOW OFF -- -�-- TRANSFORMER AND �'QQ-y FUTURE PARKING ELECTRICAL SERVICE 8 I TQ o �\ \ EXPANSION I I / I I I „J' EXT'G 10' WIDE __\ �� G G G ASPHALT TRAIL Q "NO PARKING FIRE LANE" UP ..I / ,/ •' DROP �' c 8 �. (VO O \ CURB PROPOSED CURB PROPOSED 1 1 z & GUTTER (TYP) SIDEWALKON(TYP) k 3 In ID EX. LIGHT pNTgN o'a E POLE WITH �. q 40 MPH SIGN CHRIS G. e / ws FIRE LANE NOTE: a oEs" PROPOSED 4" 1 w v+l 1 rvo.ioers ae PROPOSED 5' WIDE - STRIPING (TYP) I`-, HOT TAP AND INSTALL D.I. FIRE PAINT CURB RED WITH 2 COATS AND STENCILED WITH "FIRE `z\ CONCRETE SIDEWALK { z z F { I PROPOSED AND COPPER WATER SERVICE. J� INSTALL TRACER WIRE ON BOTH. LANE NO PARKING" AT EACH LOCATION SHOWN. THOROUGHLY A TOWNPUMP6 6.5' MIN COVER CLEAN CURB PRIOR TO PAINTING. INSTALL A "NO PARKING o LOUNGE 1 130' wDEI WTR FIRE LANE" SIGN AND POST AS SHOWN ON SITE PLAN. °� EAS MENT DRAWN BY: CGB / \/ TADAACTILE RAMP WITH TACTILE SURFACE. REVIEWED BY: BILE PROPOSED 8" D.I. SEE CIVIL DETAILS - PROJECT ENGINEER:CGB � WATER MAIN ADA PARKING STALL O I a I EXTENSION PROPOSED 4" AND SIGNAGE. SEE o PROPOSED BIKE RACK. DESIGNED BY:CGB STRIPING (TYP) CIVIL DETAILS ARCHITECTURAL 1 EX. CONC. FOR J —I MEDIAN PROPOSED 30 WIDE PROPOSED 4" I I I UTIL EASEMENT SAN SWR SERVICE. ea - c S=2% MIN. { z 4 F p . j 15' FRONTYARD x rc - a` { PROPOSED 4" THICK - - - - - - - - - - - -- - " - CONCRETE SIDEWALK --SETBACK- F. F "* EX TELEPHONE ` a o z z ° a I -J & FIBEROPTIC BOX - - -- -----= -- ---� H G G �� �� � I 10' PUE `a i� �� a PROPOSED 26' WIDE �a v 7g,19' IT, P UP UP �® UP / UP —UP UP UP —UP UP UP UP UP UP 9� UP -CONCRETE DRIVEWAY UP Nj7eg6'17'E 3 W •APPROACH PER S89°56'29'E 433.57' C.O.B. STD 02529-12 EXT'G CURB & EXT'G GUTTER (y SIDEWALK I• 8 (7� W w w W W ,N W W W W W W W W Aye W u" W W-PROPOSED OUTDOOR PATIO VISION CLEARANCE �i dll II I� W VISION CLEARANCE AREA. SEE LANDSCAPE - -�• � U-I TRIANAGLE (TYP) YII II 8 D.I. 8" D.I. TRIANAGLE (TYP) DESIGN FOR DETAIL `I° WATER MAIN It S S 6\ S � S S S a S S—WATER MAIN_S S S�s S > BENCHMARK III II I1 i i FH ARROW BOLT a�a BENCHMARK i PH ARROW BOLT III SAWCUT & REMOVE EXT'G 8" SDR35 PVC KIlIZBERWICKE 4705.66 3 •-I, "° = C IIIIII CURB AND SIDEWALK AND SAN SWR MAIN b -�-l8 i SSMH RIM 4703.74 CONSTRUCT CONCRETE 3 Q °{ 701.79 DRIVEWAY APPROACH PER 8" INV OUT 4695.87 'I IN 4693.22 ° °''C.O.B. STD 02529-13 OUT 4693.01 ° i ° SAWCUT EXT'G ASPHALT N �� • ° a � -AND HOT TAP EXT'G SAN ! 8 ,_ rl S 89.56'29 E 408.69' 4 SWR MAIN D INSTALL- - - - - - - �� - - - - - - - - - - - - - - - - - - -SWR SERVICE. c I ------------- I- ----- ---- - ------------------------------ ---"- --------PER C.O.B. STDS. 4" SAN SWR _ e S=2.9% < INV IN 669.6.72 �\\\��T 81 III A J l a I I I LEGEND 3" ASPHALT CONCRETE N 6" THICK, 1M" MINUS CRUSHED 4771 ( )MINOR CONTOUR 1 0 FOUND MONUMENT AS NOTED 0-4 AGGREGATE BASE LEVELING COURSE —4775 MAJOR CONTOUR (5') A CONTROL POINT y^y�yy H 15" THICK, 3"-0 UNCRUSHED ------- PROPERTY LINE/ROW BENCHMARK BASE COURSE 6" THICK, M-4,000 PSI REINFORCED EASEMENT LINE S SEWER MANHOLE ^ n O PORTLAND CEMENT CONCRETE. _ _ Z A =111i III=III=III=III=III=III=11'=III- o SEWER CLEANOUT h eV WOVEN GEOTEXTILE FABRIC #4 0 18" O.C. EACH WAY FENCE HO MIRAFI 60OX OR APPROVED EQUAL ®'-F- SEWER MAIN D4 WATER VALVE yb pq COMPACTED SUBGRADE ` FIRE HYDRANT N SEWER SERVICE 3" THICK, 1"-1/2" CRUSHED -" " ® CURB STOP C' ROCK BASE COURSE IN WATER MAIN yty O ACCORDANCE W/MPW 2235 -"�-"s WATER SERVICE OW WATER WELL I�1 1. CONTRACTOR TO REVIEW GEOTECHNICAL REPORT PREPARED BY ALLIED ra W I ENGINEERING AND COMPLY WITH ALL RECOMMENDATIONS. 2' FIRE SERVICE STREET SIGN z Q 2. SUBGRADE SHALL BE PREPARED AS REQUIRED IN THE GEOTECHNICAL REPORT STORM MAIN a BOLLARD ® =O 12" THICK, 6"-MINUS UNCRUSHED LIGHT POLE - V AND INSPECTED, TESTED AND APPROVED IN WRITING BY A GEOTECHNICAL _ _ _ _ SUB-BASE COURSE IN ACCORDANCE -OP-OP OVERHEAD POWER C� ENGINEER PRIOR TO PLACEMENT OF BASE COURSE MATERIAL W/Mpyy 2Y34 POWER POLE �I Lra OVERHEAD TELEPHONE [� 3. IF UNSTABLE SUBGRADE IS ENCOUNTERED REFER TO GEOTECHNICAL REPORT '� -° -° - UNDERGROUND GAS GUY ANCHOR = a FOR ALTERNATIVE PAVEMENT SECTION. WOVEN GEOTEXTILE FABRIC -2.-2L- UNDERGROUND PHONE OO ELECTRICAL PEDESTAL - 0!� 00 MIRAFI 60OX OR APPROVED EQUAL 4. PAVEMENT SECTIONS SHALL BE CONSTRUCTED PER MONTANA PUBLIC WORKS -` `- UNDERGROUND ELECTRIC ® ELECTRICAL METER i STANDARD SPECIFICATIONS (MPWSS) AND GEOTECHNICAL REPORT. OMPACTED SUBGRADE - - ROAD CENTERLINE goTELEPHONE PEDESTAL 5. ASPHALT CONCRETE SHALL BE COMPACTED TO A MINIMUM OF 97%OF �DETAII. ® GAS METER a SHEET CURB & GUTTER MARSHALL BULK DENSITY. C7A1 REINFORCED CONCRETE SLAB EDGE OF PAVEMENT D4 GAS VALVE C1 6. SUB-BASE, BASE COURSE &SUBGRADE SHALL BE COMPACTED TO 95%PER ------ EDGE OF GRAVEL 0 TEST PIT ASTM 1557 I DEZ+♦�� EDGE OF CONCRETE C PERC TEST TOWN PUMP 6I OUNCE p o TYPICAL PAVEMENT SECTION- EDGE OF BUILDING TREE CONIFER (SIZE AS NOTED) SITE PLAN COMMERCIAL PARKING LOT- STABLE SUBGRADE ` ` UNDERGROUND GAS t TREE DECIDUOUS (SIZE AS NOTED) i PROJECT:18-117 UNDERGROUND ELECTRIC a DATE:XX/XX/XX