FORM
NOI-SWC
Application:Notice of Intent
Storm Water Discharges Associated with Construction Activity
General Permit
MTR100000
The NOI form is to be completed by the owner or operator of construction activity eligible for coverage under
the Department’s General Permit for Storm Water Discharges Associated with Construction Activities.You must
print or type legibly;forms that are not legible or are not complete or are unsigned will be returned.You must
maintain a copy of the completed NOI form for your records.
Section A -NOI Status (Check one):
X New No prior NOI submitted for this site.
Renewal Permit Number:
Resubmittal/Administrative Processing
NOI Fee:$900.00
Section B -Facility or Site Information (See instruction sheet.):
Site Name:Gallatin Subaru
Site physical address:31910 Frontage Road
City,State,Zip:Bozeman,MT,59715
County:Gallatin
Township,Range,Section:2S 6E 08SN
Latitude:45.6728745 Longitude:-111.002110
Is this facility or site located on Indian Lands?No
Section C -Applicant (Owner/Operator)Information
Applicant (Operator)Name:Hyalite Engineers,PLLC
Mailing Address:2304 N 7th Ave,Suite L
City:Bozeman State:MT Zip:59715
Applicant Type:Operator
Organization Type:Corporation
Facility /Site Contact:
Facility Contact:BRETT MEGAARD Title:Project Manager
2/25/2020
Page 2 of 11
Mailing Address:2304 N 7th Ave,Suite L
City:Bozeman State:MT Zip:59715
Telephone:406-587-2781 Email:bmegaard@hyaliteeng.com
Section D -Existing or Pending Permits,Certifications,or Approvals
MPDES Permit:No 404 Permit (dredge &fill):No
UIC #:MGWPCS #:No
Plat Approval EQ #:Other:No
Local Sediment and Erosion Control Requirements:
1.Is the construction project located within a regulated Municipal Separate Storm Sewer System (MS4)?
Yes
2.The applicant must contact the MS4 to verify if additional local sediment and erosion controls are required:
Name of MS4:CITY OF BOZEMAN
MS4 Contact Name:Kyle Mehrens Contact Date:02-Mar-2020
Submit the SWPPP to the MS4 if required.Any additional MS4 requirements must be incorporated into the
SWPPP.
Sage Grouse Habitat:
Visit the Montana Sage Grouse Habitat Conservation Program (Program)website to determine if the
construction project is located in designated sage grouse habitat (core,general,and/or connectivity).No
Yes:Submit application to the Program and attach resulting consultation letter.
No:Project is not located in a designated habitat.
Section E –Nature of Business (provide a brief description)
Water and sewer services,site grading/drainage,vertical construction
SIC CODES (4-digit,in order of priority)
Code Description
1542 Nonresidential Construction
1623 Water,Sewer,And Utility Lines
Section F -SWPPP Preparer and Administrator(s)
SWPPP Preparer:
Name BRETT MEGAARD Title:Project Manager Position Title Project Manager
Mailing Address 2304 N 7th Ave,Suite L
City Bozeman State MT Zip 59715
Telephone 406-587-2781 Email bmegaard@hyaliteeng.com
Company
Training Course Altitude-BMP 201-SWPPP Administrator Certification Training (Includes Preparer training)
Date Completed 15-Feb-2017
SWPPP Administrator:
2/25/2020
Page 3 of 11
Name BRETT MEGAARD Title:Project Manager Position Title Project Manager
Mailing Address 2304 N 7th Ave,Suite L
City Bozeman State MT Zip 59715
Telephone 406-587-2781 Email bmegaard@hyaliteeng.com
Company
Training Course Altitude-BMP 201-SWPPP Administrator Certification Training (Includes Preparer training)
Date Completed 15-Feb-2017
Section G -Receiving Surface Water(s):
Storm Water Outfall/Discharge Locations:For each outfall,list latitude and longitude to the nearest 15
seconds and the name of the receiving waters
Outfall Latitude Longitude Receiving Surface Waters
001 45.6737879 -111.002791 ROCKY CREEK
MAP:Attach a USGS topographic quadrangle map extending one mile beyond the property boundaries of the
site or activity identified in Section B depicting the facility or activity boundaries,major drainage patterns,and
the receiving surface waters stated above.
Waterbodies with Impairments (see instructions):
Are any of the above waterbodies listed as impaired for potential pollutants from your construction activities.
(see instructions for accessing the Clean Water Act Information Center )
No
If yes,have you updated the SWPPP to include BMPs that target and reduce discharges of the identified
pollutants causing impairment of the waterbodies and any TMDL requirements?
Section H –Describe the Construction Activity or Project Please
Describe the Construction Activity or Project
New building construction,water,sewer,storm mains and communication lines for Bozeman Gallatin Subaru,a
new automotive sales/service facility located in Gallatin County,Montana.
Please provide a summary of Best Management Practices (BMPs)in the SWPPP
Ground disturbance will be minimized,existing vegetation will be preserved and surface roughening will be used
to control erosion.Silt fencing,straw wattles,and/or earthen berms shall be used to control sediment runoff.
Worker toilets and waste receptacles will be provided.
Total site area (acres)4.240
Area of Construction Related Disturbance (acres)4.240
Estimated Project Start Date 01-Jun-2020 Estimated Project Completion Date 02-Nov-2020
Estimated Project Final Stabilization Date 30-Nov-2020
Project Type:Commercial
History Property:No historic properties
Supplemental Information
CERTIFICATION
Applicant Information:This form must be completed,signed,and certified as follows:
For a corporation,
(i)a president,secretary,treasurer,or vice-president of the corporation.
(ii)the manager of one or more manufacturing,production,or operating facilities.
2/25/2020
Page 4 of 11
For a partnership or sole proprietorship,by a general partner or the proprietor,respectively;or
For a municipality,state,federal,or other public facility,by either a principal executive officer or ranking
elected official.
All Applicants Must Complete the Following Certification:
I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate
the information submitted.Based on my inquiry of the persons who manage the system,or those persons directly
responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,
true,accurate,and complete.I am aware that there are significant penalties for submitting false information;
including the possibility of fine and imprisonment for knowing violations.[75-5-633,MCA]
A.Name (Type or Print)
B.Title (Type or Print)C.Phone No.
D.Signature E.Date Signed
The Department will not process this form until all of the requested information is supplied,and the appropriate
fees are paid.Return this form and the applicable fee to:
Department of Environmental Quality
Water Protection Bureau
PO Box 200901
Helena,MT 59620-0901
(406)444-3080
2/25/2020Page5of11
Instructions for
Form NOI –Notice of Intent for Storm Water Discharges Associated with
Construction Activity (MTR100000)
Overview:An “owner or operator”of a “storm water discharge associated with construction activity”
is required to obtain authorization under an MPDES permit.“Owner or operator”means a person
who owns,leases,operates,controls,or supervises a point source.In this General Permit,the
“owner or operator”is also identified as the “permittee”.
A “storm water discharge associated with construction activity”regulated under this permit is
determined by meeting both of the following two criteria:
There are areas of ground disturbance or other potential pollutant sources due to the
construction activity where a storm water discharge to state surface waters can occur.
The construction activity has a total area of ground disturbance through clearing,excavating,
grading,or placement/removal of earth material which is equal to or greater than one acre.
The “total area”must include all areas which are part of a “larger common plan of
development or sale”.
Larger common plan of development or sale means a contiguous area where multiple separate
and distinct construction activities are planned to occur at different times on different schedules
under one plan.These separate and distinct construction activities which form a larger common
plan of development or sale may have areas of disturbance which are not physically connected.
The permittee must consider support activities for the construction project which may be on or off
the conventional construction project “site”.Support activities can include,but are not limited to,
areas used for access-related work,earth material borrow areas,equipment staging areas,materials
storage areas,temporary concrete or asphalt batch plants,and any areas used for fill placement.
For storm water discharges from support activities to be covered under this permit for a particular
construction activity permit authorization,such support activities must:
Not be part of a larger commercial operation serving multiple unrelated construction
activities,and not continue operation beyond the completion of the particular construction
activity;and
Have appropriate controls and measures identified for the particular support activity.All
construction activities that disturb and are part of a larger common plan of development or
sale are subject to permit coverage.
Please review Part I of the General Permit for all eligibility requirements for coverage.
A Notice of Intent (NOI)process is used for an owner or operator to obtain authorization to
discharge under this permit.Through the submittal of a NOI,the owner or operator acknowledges
eligibility for coverage under this permit and agrees to comply with the effluent limits and
conditions of this permit.
The complete NOI Package submitted to:
Montana Department of Environmental Quality
Water Protection Bureau
P.O.Box 200901
2/25/2020Page6of11
Helena,MT 59620-0901
The complete NOI Package consists of:
A completed NOI form and attached USGS map;
A separate SWPPP completed in accordance with the requirements this General Permit;
A copy of the consultation letter from the Montana Sage Grouse Habitat Conservation
Program (if applicable);and
The appropriate “application fee”for the NOI.
Upon receipt of the NOI Package by the Department,it is stamped with the date of receipt.The
Department then performs a check to ensure the NOI Form is complete,that a signed SWPPP is
attached,and that the required fee is submitted.If the NOI Package is determined to be complete,
authorization is effective upon the date it was stamped as received and the Department issues a
Confirmation of Receipt letter to the permittee.If the NOI Package is incomplete,the Department
provides notification as to what the deficiencies are,and permit authorization does not become
effective under this permit until the deficiencies are addressed and the Department subsequently
receives the complete NOI Package.
Coverage does not relieve the permittee from any other statute,regulation,permits,or other
regulatory requirements for activities occurring within their area and not associated with permitted
storm water discharges associated with construction activities.
Instructions for NOI Sections
Section A –NOI Status
Check the appropriate box.For resubmitted,renewal,and modification status provide the 9-digit
authorization number (beginning with MTR10)assigned to your construction activity.
New:Use only if no prior NOI submitted for this facility/site.
Resubmitted:Use only if requested by DEQ to resubmit NOI and/or SWPPP.
Renewal:Use only if renewing an authorization before the expiration date of December 31,2017.
Modification:Use only if this facility/site has General Permit coverage and the authorization needs
to be updated.A permittee may not modify an authorization to add additional construction-related
disturbance area(s)unless the new additional construction-related disturbance is directly contiguous
to and directly associated with the original site,except for support activities.
Section B –Facility or Site Information
Enter the legal or official name and complete street address.If the street address is not available,
include the nearest intersection or other identifying information.Provide the latitude and longitude
for the location of the approximate center point of the construction activity site.It is preferred the
latitude and longitude location be specified in decimal degrees,accurate to the fourth decimal
place.If the preferred decimal degrees are not used,then the latitude and longitude must be
provided in degrees,minutes,and seconds,accurate to the nearest second.
2/25/2020Page7of11
Indicate if any construction activity covered under this NOI will occur on Indian Reservations.This
Permit applies to all areas of the State of Montana,except for Indian Reservations.Please contact
EPA for construction activity within Indian Reservations.
Section C –Applicant (Owner/Operator)Information
An “owner or operator”is a person who owns,leases,operates,controls,or supervises the
construction activity.The owner or operator can be identified as an organization or business name.
The owner or operator acknowledges eligibility for coverage under this General Permit and agrees
to comply with the effluent limits and conditions of this permit.
Section D –Existing or Pending Permits,Certifications,or Approvals
Provide a list of permits,certifications,and/or approvals from state or federal regulatory agencies
regarding the construction activity or project.
Local Sediment and Erosion Control Requirements:Verify if the construction activity is proposed
within a regulated Municipal Separate Storm Sewer System (MS4)to include:
The Cities of Billings,Bozeman,Butte,Helena,Great Falls,Missoula,and Kalispell;
Yellowstone,Cascade,and Missoula Counties;and
Others -Malmstrom Air Force Base,University of Montana-Missoula,Montana State
University,and the Montana Department of Transportation (as applicable).
If the construction activity is located within a regulated MS4,verify contact and incorporate any
additional MS4 requirements into the Storm Water Pollution Prevention Plan (SWPPP).
Sage Grouse Habitat:Visit https://sagegrouse.mt.gov/and review the Sage Grouse Core Areas and
General Habitat Map to determine whether your project would occur in sage grouse habitats
designated as a core area,general habitat,or a connectivity area.Projects within sage grouse
habitat must be submitted to the Montana Sage Grouse Habitat Conservation Program (the
Program),through their website,for consultation.Any recommendations and mitigations
determined by the Program are provided in a consultation letter.If the project is outside of sage
grouse habitat,no consultation is required.
Section E –Standard Industrial Classification (SIC)Codes
Select at least one SIC code that best reflects the type of construction activities or description of the
nature of the business applicable to General Permit coverage.SIC codes can be obtained at
http://www.census.gov/epcd/www/naics.html or http://www.osha.gov/pls/imis/sicsearch.html.
Section F –SWPPP Preparer and Administrator
The permittee must identify a SWPPP Preparer and SWPPP Administrator and the requested contact
information.The name of the training course(s)and date of completion(s)must be provided within
the NOI form.
Valid certification documents or certificates of completion from the listed training courses must be
maintained with the SWPPP.Valid certification that demonstrates the following concepts:
MPDES permitting requirements to include,but not limited to,applicability,application
procedures,SWPPP elements,standard conditions,and termination conditions;
Local permitting requirements;
Sage Grouse requirements based on location of the project;
2/25/2020Page8of11
Knowledge of the principles and practices of erosion and sediment controls and pollution
prevention practices;
Construction site assessment and planning skills to include knowledge and identification of
major construction activities and the phases of construction activities and all support
activities,and the potential pollutants generated based on the scope of the project;
Development,selection,and implementation skills for all storm water controls and BMPs on
the site,including final stabilization measures,required by this permit based on appropriate
design,installation,function,and location;and how they are to be maintained and/or
repaired according to developed and/or manufacturers plans and specifications;
Development,selection,and implementation skills for pollution prevention controls and
BMPs required by this permit;
Development and implementation skills for procedures and associated documentation for all
inspections,maintenance,and required recordkeeping to include when and how to conduct;
inspections,record applicable findings,take corrective actions,and,when appropriate,
report violations and/or noncompliance;and
Ability to develop and update the site map(s)required by this permit.
SWPPP Preparer (Effective January 1,2019):A SWPPP Preparer must be identified.A SWPPP
Preparer is an individual or position title who is responsible for planning and development of the
SWPPP prior to submission of the NOI.The SWPPP Preparer must develop and document all
aspects of the SWPPP,initiating with the start of construction activities,and lasting until final
stabilization is achieved and the permit authorization is terminated.The SWPPP Preparer minimum
requirements and valid certification must be completed before the submittal of the NOI Package to
the Department.
*If the NOI is submitted prior to January 1,2019,a SWPPP Preparer is not required to be
identified and this section may be left blank.Effective January 1,2019,a SWPPP Preparer
must be identified in this section and obtain valid certification prior to SWPPP preparation
and NOI submittal.
SWPPP Administrator:The permittee must specify a primary SWPPP Administrator and a
secondary SWPPP Administrator as applicable.Additional SWPPP Administrators can be identified
in Attachment A.A SWPPP Administrator(s)is an individual or position title who is responsible for
developing,implementing,maintaining,revising,and updating the SWPPP.The SWPPP
Administrator(s)must address all aspects of the SWPPP,initiating with the start of construction
activities,and lasting until final stabilization is achieved and the permit authorization is terminated.
This SWPPP Administrator(s)minimum requirements and valid certification must be completed
before the start of earth-disturbing activities or potential pollutant-generating activities,whichever
occurs first.For new employees hired after this time,the minimum requirements and valid
certification must be completed before assuming SWPPP Administrator responsibilities.
Section G –Receiving Surface Water(s)
An outfall location is considered to be a discrete channel,conveyance,structure,or flow path from
which storm water discharge leaves the boundary of the facility or site.“Surface waters”is any
waters on the earth’s surface including,but not limited to,streams,lakes,ponds,reservoirs,or other
surface water including ephemeral and intermittent drainage ways and irrigation systems.Identify
2/25/2020Page9of11
the immediate receiving surface water and the latitude and longitude of the outfall using decimal
degrees.
Provide the following information in the table:
Outfall number assignment starts with 001.If the outfall is not discrete or well defined,the
relative outfall location may be assigned to the relative flow path or drainage area.
If the immediate receiving surface water is unnamed,provide the latitude and longitude of
the immediate receiving surface water and indicate the closest named surface water that the
unnamed receiving waterbody flows into (i.e.unnamed tributary to Rock Creek or unnamed
drainage to Clear Creek).This naming process will provides better clarification.
For existing permittees,ensure outfall numbers used are consistent with those identified in
the past for the same outfall.
Waterbodies with Impairments
Identify if storm water discharges from the construction activity will discharge to impaired
waterbodies.Determine if the immediate receiving surface waters identified in Section G and/or
other surface waters with connectivity and within one mile of the construction site boundaries
identified in the map required in Section K are listed as impaired.
Information on impaired waterbodies may be obtained from the Department or from the Montana
DEQ Clean Water Act Information Center website at http://svc.mt.gov/deq/dst/#/app/cwaic.An
interactive map is located at:http://deq.mt.gov/Water/WQPB/CWAIC.Compare pollutant(s)of
impairment to identified potential pollutant sources from your construction activities.Typical
pollutants from construction activities include sediment,suspended solids and turbidity,and any
secondary sources of pollutants based on materials and support activities.
Section H –Nature of the Construction Activity or Project
In your own words,briefly describe the overall construction activity that requires authorization
under this General Permit.Provide a summary of the phases and associated Best Management
Practices required to achieve final stabilization.Do not repeat the SIC Code description.Provide
information regarding the actual project.
Enter the total site area of the project in acres.Enter the number of acres of construction related
disturbance for the site.This calculation includes the common plan of development or sale and
support activities.Enter the estimated project start date,completion date,and final stabilization
date.These dates are recognized as estimated and provide a timeframe for the project.
Section I –Supplemental Information
*For Permit Modification Only.Leave this section blank except for modification.
Modification requests (including decreased or increased disturbance area)submitted by the
permittee within six months of the date of issuance of the authorization are processed as a minor
modifications.If the authorization requires modification after six months of the date of issuance
(other than an ownership/name change using the Permit Transfer Notification form),the
modification will be processed with a new project fee.
2/25/2020Page10of11
A permittee may not modify the NOI to add additional construction-related disturbance area(s)
unless the new additional construction-related disturbance is directly contiguous to and directly
associated with the original site,except for support activities.
Sage Grouse Consultation Requirements for Modifications:Any modification due to a change in
disturbed acreage requires verification of the construction project boundaries being in designated
sage grouse habitat that will result in a consultation letter and/or updates to a consultation letter.If
the modification request is outside of sage grouse habitat,no consultation is required.
Section J –Fee
New Projects:The fee for new projects is based on the number of disturbed acres from Section H
of this form.The fee for disturbing one to five acres (inclusive)is $900.00.The fee for over five
acres up to and including ten acres is $1,000.00.The fee for over ten acres up to and including
twenty-five acres is $1,200.00.The fee for over twenty-five acres up to and including one hundred
acres is $2,000.00.The fee for any number of acres over one hundred is $3,500.00.
Modification:The fee for a minor modification to the original permit authorization is $500.00.
Minor modifications must be made within six months of the original issue date.Examples of a
minor modification include changing the number of disturbed acres within one of the ranges above,
or changing or adding outfall locations.If the acreage increases to a new fee range,the permittee
must pay the difference from the original fee amount submitted.Updating administrative
information (examples:addresses,phone numbers and changing the SWPPP administrator)are
examples that do not require an NOI or fee.
If the modification is made after the first six months from the original issue date,the full fee applies.
See the correct amount under New Projects above.
Renewal:A renewal is only for permittees requiring continued authorization beyond the December
31,2017,expiration date.The fee is based on the number of disturbed acres under new projects.
Resubmittal:A resubmittal is only used if the entity was required to resubmit by request of DEQ.
The fee is $500.00.
Permit Transfer Fee:The permit transfer is to change ownership of the permit authorization to
another entity.The fee is $500.00.Do not use this form,use the PTN Form.
Section K –Attachments
Map:Attach a USGS topographic map extending one mile beyond the project boundaries of the
site or activity in Section B depicting the facility or activity boundaries,the receiving surface waters
in Section G,and other major drainage patterns to include connectivity from the receiving surface
waters.
SWPPP and Site Map:Indicate and attach these documents as outlined in the General Permit.
Section L –Certification
Authorized Signatories:This form must be completed,signed,and certified as follows:
For a corporation,by a principal officer of at least the level of vice president;
2/25/2020Page11of11
For a partnership or sole proprietorship,by a general partner or the proprietor,respectively;
or
For a municipality,state,federal,or other public facility,by either a principal executive officer
or ranking elected official.
Office Managers or bookkeepers are not authorized signatories unless they are also one of
the above persons.