Loading...
HomeMy WebLinkAbout3.10_Gallatin Subaru_ Development Review_Project Narrative & Concept Response_03.03.2020 Gallatin Subaru Darwin Lindahl Architects, PA 3/2/2020 Development Review: Gallatin Subaru – Development Review March 3, 2020 Page 1 of 26 Table of Contents: Table of Contents…………………………………….…………...………1 SP-1 (Site Plan Checklist)……………………….….……………………2 Concept Review Response………………………….…………..……….5 Project Narrative…………………………………….………….…….…...8 1 General Project Information……….…....……………..….……8 2 Project Team………………………………..…………….………8 3 General Site Information………….…….…………………...…..9 4 Site Access………………………………..…….……………….10 5 Site Design……………………………………….....……………11 6 Vehicular Circulation…………………………….………………12 7 Parking Requirements…………………..……………..………..13 8 Yard Setbacks…………………………….………...……………15 9 Site Utilities…………………………….………...……………….15 10 Landscaping……………………………...………………………17 11 Site Lighting………………………….………...…………………17 12 Trash Enclosure………………………………..………………..19 13 Building Design………………………………….………………19 14 Signage………………………………….…………………….…23 15 Departures…………………………….…………………………24 Gallatin Subaru – Development Review March 3, 2020 Page 2 of 26 Gallatin Subaru – SP1 (SITE PLAN CHECKLIST) GENERAL PROJECT INFORMATION: 1. Project narrative attached. 2. Gallatin Subaru 3. Provided on A000-Title Sheet and in project narrative 4. Provided on A000-Title Sheet and in project narrative 5. Provided on A000-Title Sheet and in project narrative 6. Provided on A000-Title Sheet 7. Provided on A003-Construction Route Map & Site Management Plan 8. Provided on A002-Project Matrix SITE PLAN GENERAL 9. Provided on A101-Site Plan 10. Provided on all plans 11. Provided on all plans 12. Provided on all plans, scale is 1”=20’. 13. Provided on A000-Title Sheet, and in project narrative 14. Provided on A000-Title Sheet, and in project narrative 15. N/A SITE PLAN DETAILS 16. See C4.0-Grading and Drainage Plan 17. City limit boundaries run along the projects south property line, and to the north across Frontage Road, see Vicinity Map on A000-Title Sheet 18. See Zoning Map (partial) on A000-Title Sheet 19. See A101-Site Plan and C1.0-Commerical Site Plan 20. Provided on A000-Title Sheet and in project narrative 21. N/A 22. Provided on all plan sheets 23. Provided on C1.2-Site Circulation Layout 24. Provided on C1.2-Site Circulation Layout 25. Provided on A000-Title Sheet, A101-Site Plan, and A131- Floor Area Determination Plans. See Civil Plans and Architectural Site Plan. 26. Provided on A101-Site Plan, A111-Main Floor Plan 27. Provided on A101-Site Plan and Civil Plans 28. Provided on Civil Plans 29. Provided on Civil Plans 30. Provided on Civil Plans 31. N/A 32. See Civil Plans and Architectural Site Plan. Gallatin Subaru – Development Review March 3, 2020 Page 3 of 26 33. See Civil Plans and Architectural Site Plan 34. Provided on A101-Site Plan 35. Provided on A101-Site Plan and A102-Site Details 36. Provided on A003- Construction Route Map and Site Management Plan. 37. Provided on C5.2-Civil Details 38. Provided on A101-Site Plan and C1.0-Commerical Site Plan 39. Provided on A101-Site Plan 40. N/A 41. N/A 42. N/A PARKLAND AND AFFORDABLE HOUSING 43. N/A 44. N/A 45. N/A 46. N/A 47. N/A 48. N/A LIGHTING DETAILS 49. Provided on E101-Photometric Site Plan 50. Provided on E101-Photometric Site Plan 51. Provided on E201-Site Lighting Details BUILDING DESIGN AND SIGNAGE 52. Architectural Building Elevations and Color/Material Palette provided on sheet A201. 53. Provided on A201-Exterior Elevations 54. Roof mounted equipment screening detail provided on A151- Roof Plan 55. See A101-Main Floor Plan, A111-Second Floor Plan, and A151-Roof Plans 56. Provided on A104-Signage LANDSCAPE PLAN 57. Provided on Landscape Plans 58. Provided on Landscape Plans 59. Provided on Landscape Plans 60. Provided on C4.0-Grading and Drainage Plan 61. Provided on Landscape Plans 62. Provided on Landscape Plans 63. Provided on Landscape Plans 64. Provided on Landscape Plans Gallatin Subaru – Development Review March 3, 2020 Page 4 of 26 65. Provided on Landscape Plans 66. Provided on Landscape Plans 67. Provided on Landscape Plans 68. Provided on Landscape Plans 69. Provided on Landscape Plans 70. N/A 71. N/A 72. N/A 73. Provided on Landscape Plans 74. Provided on Landscape Plans 75. Provided on Landscape Plans 76. Provided on Landscape Plans STREETS AND TRAFFIC 77. N/A WATER AND WATER RIGHTS 78. ----- 79. N/A DEVIATIONS 80. N/A 81. N/A 82. N/A DEPARTURES 83. Summary provided in Project Narrative Gallatin Subaru – Development Review March 3, 2020 Page 5 of 26 Gallatin Subaru Concept Review Comment Response The following are responses to City staff comments dated 01/13/2020 during the Concept Review phase of this project. Planning 1. Site Plan application along with required support documentation has been prepared and submitting to City for review and approval. a. Copy of the recorded 30-foot shared access easement is included with formal submittal. b. All existing and proposed utility easements are shown on the Development Review plans. c. The wetland delineation and all applicable environmental permitting issues are addressed in Civil Engineer’s proportion of Development Review submittal. d. Color exterior material palette keyed to the building elevations has been included in the Development Review submittal. e. The building elevations have been correctly labeled. f. Utility meters, electrical conduits, and other service utility apparatus are shown on building elevations, and appropriately screened with landscaping. 2. Use of the site has been identified as “Heavy Retail” in accordance with Ordinance 2029. 3. All outdoor sales, display, and inventory storage areas have been delineated in color on sheet A002_Project Matrix, and totals 19% of the area of the site. 4. Grading and drainage issues are addressed in Civil Engineer’s proportion of the Development Review submittal. The stormwater components of the site have been addressed and design in similar fashion to what was approved for the nearby Audi/VW site. 5. Block Frontage is Gateway, and the following requirements have been addressed in narrative and drawings: a. Building Placement: The building is located 159’ from Frontage Road right-of-way. Gallatin Subaru – Development Review March 3, 2020 Page 6 of 26 b. Building Entrances: There is one main building public entrance located at the showroom, and three minor public building entrances, one at the west side of the showroom, one at the front of the service reception, and one at the side of the “express” service. c. Customer Parking: Located at the east side and the front of the building. One of the customer parking spaces in the front will be equipped with an EV charging station. Based on the alignment of the entrance drive these parking spaces have a minimal impact to the overall building façade, and make it easy for EV owner to locate charging stations. Based on these reasons a departure is warranted. d. Service/Employee Parking: All service and employee parking are located on the sides (east and west) and rear of the building. e. Façade Transparency: The percentage of front façade transparency is 45%. f. Weather Protection: All public entrances have been recessed from the façade a minimum of 3’, thus meeting this requirement. g. Landscaping: Required landscaping has been addressed on the landscape plans, including new landscaping standards to parking locations. 6. Non-motorized circulation a. Crosswalks have been provided at locations where pedestrian traffic cross vehicular traffic. These crosswalks are identified with inlaid thermoplastic markings. b. Connections to adjacent properties: Pedestrian walkways are provided from proposed building to edge of property, both east and west. Pathways consist of concrete sidewalks and inlaid thermoplastic markings. c. The width of all pathways adjacent to perpendicular parking or display spaces have been increase to 7’, providing for parked vehicles to overhang the pathway, and still providing a clear 5’ wide walkway. Gallatin Subaru – Development Review March 3, 2020 Page 7 of 26 d. All pathways are separated from the building by 3’ of landscaping, except at building entrances, both pedestrians and vehicle entrances, and under deep overhang at service reception entrance. e. Crosswalk has been provided from sidewalk at building to trash enclosure. 7. Trash Enclosure and utility meter screening: Trash enclosure walls are 8’ high screen content inside of enclosure from surrounding streets, pathways, and buildings. Landscape material will be used to achieve required screening. 8. Building design : a. Massing and Articulation: The front façade design utilizes the following articulation features with distance between features less than 60 feet: i. Windows ii. Entries iii. Weather protection features iv. Change in building material v. Vertical building modulation of at least 12” in depth 9. Building materials: Color/Material Palette has been created and located on building elevation sheet. 10. Blank Wall Treatments: Wall openings (transparent doors and windows) have been strategically incorporated into the building exterior eliminating all blank walls of greater than 10’ high x 15’ long. 11. Parking: Floor area determination plan has been prepared to illustrate areas exempt from parking requirements. 12. Parking: Parking is outside all storm water facilities, pedestrian circulation and landscaping requirements. The bike rack has been relocated so not to impede pedestrian circulation. Gallatin Subaru – Development Review March 3, 2020 Page 8 of 26 13. Landscaping performance standards: a. Parking lot: Landscaping within required parking lot as required. b. Street frontage: Landscaping along Frontage Road has been designed to meet Gateway street frontage. c. Cross-sections for storm water detention: Civil drawings include storm water detention pond cross-sections. 14. Signage: The pylon sign has been changed to a pole sign and is and located outside the 15’ setback requirement. The pole sign is illustrated on the Signage Plan, showing the maximum height of 13’, and less than 32 sf. 15. Photometric plan and lighting cut sheets: Photometric site plan along with lighting fixture cut sheets are included in Development Review submittal. 16. Potential wetlands: A complete Wetland Delineation study was completed with the next-door Bozeman Audi/VW development application, showing the only wetlands present on the Subaru site were near the I-90 ditch line, which will not be disturbed. Engineering Easements 1. Existing Utilities: Existing utilities and applicable easements are shown on Development Review submittal. 2. Access Easements: The original existing access easements are being removed, and replaced with a new joint access easement centered on common property line with adjacent property (set in place with the Audi/VW Project). 3. Sand/Oil Separator: A sand/oil separator is located inside building just before the sanitary sewer exits building. General 1. Plan review: See the included plans, showing future connection to all utilities. Gallatin Subaru – Development Review March 3, 2020 Page 9 of 26 Stormwater 1. Water Quality: See the included stormwater plans & details as well as the Stormwater Engineering Report for the layout and design. This alternate design was utilized for the next-door Bozeman Audi/VW location and the process was a combined approach between Hyalite Engineers and the City of Bozeman. 2. Water Quantity: See the included Stormwater Engineering Report for the calculations on the pond sizing. 3. Storm water Best Management Practices (BMP). Civil engineer has designed BMPs for site. Water Rights 1. Water Rights: Mr. Heaston will be contacted to obtain a determination prior to site plan approval. Water 1. Water Main size: Preliminary flows have been estimated and incorporated into Site Plan application/Engineering Report. 2. The existing fire hydrant was not moved; however, a new hydrant was installed just east of the new east approach. 3. Noted, and agreed. Wastewater 1. Sewer flow: Preliminary peak-hour and average daily sewer flows have been estimated and incorporated into Site Plan application/Engineering Report. Transportation 1. Snow Storage: See the Civil and Architectural site plans for the noted snow storage areas. 2. Traffic: See the included email from Anna Russell noting that no TIS is necessary for this project. Gallatin Subaru – Development Review March 3, 2020 Page 10 of 26 Conditions of Approval 1. Noted, a Waiver of Right to Protest will be recorded prior to Site Plan Approval. Northwestern Energy: 1. A dry utility plan is in coordination with Cammy at NWE. See the included correspondence thus far. Solid Waste Division: 1. The 50 feet of straight approach to refuse enclosure has been illustrated on the Site Plan A-101. 2. Plans, elevations and details of refuse enclosure are included in Development Review submittal. Building Division: 1. Fire Sprinklers and alarms: a. The building is fully sprinklered, with a fire department connection along with horn/strobe is located on the northwest corner of the building. b. Sand oil separators in garage: The floor drains and trench drains servicing the repair areas of the building will be connect to a sand oil separator, which is located on the east side of the service reception area. c. No fuel will be housed in the building. Oil, waste oil storage is located on the main level next to detail area. d. No designated welding work area in the building. Gallatin Subaru – Development Review March 3, 2020 Page 11 of 26 Project Narrative 1 General Information 1.1 Project Owner/Developer The existing property is owned by D&G Investments LLLP, and the Subaru franchise is owned and operated by Gallatin Motor Company. Owner Contact information: D&G Investments LLLP 31910 E. Frontage Road Bozeman, MT 59715 1.2 Project Location This new facility will be located at 31910 East Frontage Road, which is current location of Gallatin Subaru. The existing auto dealership building currently on the property will be removed. A vicinity map of the project site is included on the cover sheet of the Development Review drawings. 1.3 Project Schedule The construction of this new facility is anticipated to commence in summer 2020, with completion slated for late summer of 2021. 1.4 Zoning: M-1 (Manufacturing), Heavy Retail 2 Project Team 2.1 Architect Darwin Lindahl Architects, P.A. 4124 Quebec Avenue N., Suite 106 Minneapolis, MN 55427 2.2 Civil Hyalite Engineers 2304 N. 7 th Avenue, Suite L Bozeman, MT, 59715 2.3 Landscape Architect Red Barn Montana Gallatin Subaru – Development Review March 3, 2020 Page 12 of 26 3084 Thorpe Road Belgrade, MT 59714 3 General Site Information 3.1 Legal Description: A parcel of land located in the SE ¼ of Section 8 and the SW ¼ of Section 9, Township 2 South, Range 6 East, P.M.M., City of Bozeman, Gallatin county, Montana, more particularly described as follows: Lot 1 of the Plat Huemphner Minor Subdivision No. 450 3.2 Site acreage is 4.24 acres (184,694 square feet). 3.3 The site along with adjoining properties to the east and west are zoned M-1, Light Manufacturing, and Heavy Retail (automotive sales/service) is a permitted use. 3.4 The site fronts East Frontage Road which has a “Gateway” frontage designation, and is located between Sunrise Campground to its west, and Bozeman Audi/VW (under construction) to its east. The back of the site faces Interstate 90. 3.5 Current zoning for site and adjacent properties is zoned M-1, Light Manufacturing. Heavy Retail (Automotive Sales and Service) is a permitted use per City of Bozeman Unified Development Code, Table 38.310.040.A. 3.6 Existing structures on the project site is a combination of metal buildings totaling approximately 27,363 sq. ft. with asphalt paving around all four sides. This existing building and paving will be removed from site. Gallatin Subaru – Development Review March 3, 2020 Page 13 of 26 4 Site Access 4.1 Existing Site Access: Currently there are two accesses points to the site. 4.2 Proposed Site Access: 4.2.1 The existing westerly entrance to the site will remain. 4.2.2 The existing easterly entrance will be removed when the new approach/driveway will be centered on the property line shared with Bozeman Audi/VW is completed as part of the Audi/VW project. The owner and Bozeman Audi/VW have executed a joint access easement, and are recorded with Gallatin County. All Gallatin Subaru – Development Review March 3, 2020 Page 14 of 26 existing access agreement between these two properties has been removed. 4.2.3 The shared approach/driveway has been designed per MDT specifications, and permitted. 4.2.5 Locations and extent of street vision triangles for both proposed approaches/driveways are shown on Sheet A101-Site Plan. 5 Site Design 5.1 Site Zones: The site is divided into three zones: 5.1.1 Open Sales Lot Zone (vehicle display): Is located at the front of the site, facing East Frontage Road. The open sales lot occupies approximately 0.8 acre or 24% of the site area. 5.1.2 Customer Zone: Consists of the showroom and service drive, both face Frontage Road. Customer parking is located at the sides of the building with a small portion (14 spaces) at the front of the showroom. 5.1.3 Service/Parts Zone: Located in the rear of the building and site. Employee parking, delivery and unloading of vehicles and parts, and inventory (vehicle) storage where vehicles are stored awaiting prepping for sale are included in this zone. 5.2 Floor Area Ratio (FAR) 5.2.1 The estimated ratio of floor area to lot size (floor area ratio, FAR) is 0.219. 5.3 Project Matrix 5.3.1 Refer to Sheet A002- Project Matrix which illustrates locations of areas, size (sq. ft.), and relationships. The following is a summary of the various areas. 5.3.2 There is an existing metal building of approximately 27,363 sf is being removed for new development. 5.3.3 Proposed building or structures consist of a new automotive dealership facility with a footprint of Gallatin Subaru – Development Review March 3, 2020 Page 15 of 26 approximately 28,954 sf and a trash enclosure of 270 sf. Total proposed buildings/structures will occupies 15.8% of the site. 5.3.4 Driveway, circulation, parking areas, open sales lot including inventory storage occupies 62.6% of the site. Refer to Project Matrix Plan, Sheet A002 for locations and areas of driveways, circulation, parking, open sales lots, and inventory storage. 5.3.5 Landscaped areas consist of both soft-scape, and hardscape occupying the remainder of the site, or 21.6%. Soft-scape includes landscaped buffers on the south, east, and north edges of the site, parking lot landscaping, and foundation plantings along the building’s front elevation. Hardscape includes all sidewalks around the building, sidewalk/feature vehicle display on both sides of the center approach/driveway leading to the building from East Frontage Road. 5.3.6 No private residential, city parks, or other public lands are located or proposed on the site. 5.3.7 This is a single commercial building development, and residential densities do not apply. 5.4 Snow Storage: Snow storage will be at storm water detention areas, and portions of inventory storage as shown on Sheet A101-Site Plan, and C1.0-Site Plan. 6 Vehicular Circulation 6.1 The site will be accessed from two approaches/driveways from East Frontage Road as described under Site Access. 6.2 Delivery vehicles (transports and parts trucks) will enter the site using the existing westerly approach/driveway, circulating to the rear of the site. Deliveries of vehicles and parts will occur at the loading berth (12’ x 70’) located at in the southwest corner of building. After delivery the transport or parts truck will exit the site via the shared approach/driveway with Audi/Volkswagen. This circulation path as shown on Sheet C1.2-Site Circulation Layout. Gallatin Subaru – Development Review March 3, 2020 Page 16 of 26 6.3 The majority of sales customers will use the westerly approach/driveway which leads them to the customer parking next to the showrooms. 6.4 The Service Drive entrance is located on the east side of the building, so the service customers will typically enter the site using the shared approach/driveway, and exiting the Service Drive to the east, and exiting the site using the shared approach/driveway. 6.5 All parking, and open sales lots (vehicle display), have two way drive aisles, with a minimum of 24’ wide, and with no “dead end” aisles. 6.6 Vehicle circulation within site will accommodate fire department equipment. Proposed fire lane is proposed at the delivery circulation path as previously described, and drive aisle in front of showrooms. See A101-Site for location of fire lanes. Curbs at fire lanes will be painted “red”, a “red” painted stripe with “fire lane” stenciled on along on side of the fire lane. Pole mounted “No Parking – Fire Lane” signs will be located along curb at a spacing not exceeding 100 feet. Fire lanes up to 65 feet in length will be identified with one double faced sign and the curb painted red and stenciled “FIRE LANE NO PARKING” 15 feet from each end of the road. 6.7 Pedestrian Crosswalks are provided at locations where pedestrian traffic crosses with vehicle traffic will be marked with an inlaid thermoplastic pattern. Gallatin Subaru – Development Review March 3, 2020 Page 17 of 26 7 Parking Requirements 7.1 Since a large portion of the building is dedicated for parts storage, and vehicle repair the property owner will be making a request in writing to the Community Development Director for approval to reduce the floor area by subtracting the areas as listed under paragraph 38.540.010.1.a from the gross floor area. See Sheet A131-Floor Area Determination Plan for determination of floor area. 7.2 Based on the Floor Area Determination Plan, Sheet A131 the total floor area used to determine the number of parking spaces is 8,355 sf, requiring 42 parking spaces (8,355 sf / 200 sf per parking space = 41.77 or 42 spaces). 7.3 Total number of vehicles displayed in the open sales lots is 201 requiring 10 parking spaces (201 spaces / 1 parking spaces of each 20 displayed = 10.05 or 10 spaces). 7.4 The service department has a total of 21 service stalls requiring 42 parking spaces (21 stalls x 2 parking spaces per stall = 42 spaces). 7.5 The total required parking spaces is 94, and the number of parking spaces provided is 117. 7.5 Customer parking will be provided at the north, and east side of the building dealership, and will be marked with “customer” painted at each space. 7.6 Employee parking will be located on the southwest corner of the site, with inventory storage behind the building. 7.7 All parking spaces are standard size, 9’-0” wide x 20’-0” long, except at curbs with overhang projections which are 18’-0” long. All parking lot drive aisles are 24’-0” wide or wider. All parking spaces will be defined by a 4” wide paint stripe between each space. 7.8 Open sales lot (vehicle display) and inventory storage will be defined with a single 4” paint stripe defining the limits where vehicles can be placed, and the drive lanes. 7.9 Per ADA a parking lot with 117 spaces requires 5 accessible parking spaces. These 5 accessible spaces are located at showroom entrances, and at the service drive entrance. Gallatin Subaru – Development Review March 3, 2020 Page 18 of 26 Accessible parking spaces will be marked and signage per ADA requirements. 7.10 All parking, open sales lots, and inventory storage are located inside of the required yard setbacks. Perimeters of parking, open sales lot, and inventory storage including landscaped areas inside parking lot will be curbed. 7.11 One parking space in front will be equipped with electric vehicle (EV) charging stations. 7.12 Based on the number of required parking spaces (92), ten bicycle parking spaces are required. It’s proposed to provide one bicycle rack at the northeast corner of building. 8 Yard Setbacks 8.1 Front yard setback is 20’-0”, and all site light poles including concrete bases are behind yard setback. The pole sign is located within the front yard setback, which is permitted under the signage code. 8.2 East Frontage Road is designated as a “Gateway” frontage requiring the building to be setback a minimum of 25’ from right-of-way. Proposed building location from right-of-way exceeds minimum. 8.3 The building and paving area outside the required yard setbacks, except along the west property line where a joint access easement for the proposed shared approach/driveway between Bozeman Audi/Volkswagen and Gallatin Subaru. Gallatin Subaru – Development Review March 3, 2020 Page 19 of 26 9 Site Utilities 9.1 Easements exists on property as follows: 9.1.1 20’ utility easement along north, west, and south property lines. 9.1.2 10’ utility easement along the east property line. 9.2 Electrical Utility: The proposed building will require an 800 amp, 277/480v, 3 phase electric service. The power will be taken from an overhead electric line located in the west utility easement, and run underground to the CT cabinet located at the southeast corner of the building. See Landscape Plan for screening of transformer. A ground mounted electrical transformer is located in a landscaped island next to the building electrical service. See Landscape Plan for screening of transformer. The proposed locations of CT cabinet, transformer and the routing of the underground service have been reviewed with Cammy Dooley at Northwestern Energy, which she has given preliminary approval. An easement from existing west easement to building transformer will be provided per Northwestern Energy requirements. 9.3 Gas Utility: Natural gas service to the building is proposed to run from Frontage Road right-of-way to the southwest corner of the building were the gas regulator/meter is located. Proposed locations have been reviewed with Cammy Dooley at Northwestern Energy, which she has given preliminary approval. See Landscape Plan for screening of transformer. 9.4 Telephone, cable, and Fiber Optics: Cabling will extend from the East Frontage Road right-of- way to the I.T. room located on second level. All cabling will be buried underground. Gallatin Subaru – Development Review March 3, 2020 Page 20 of 26 9.5 Sanitary Sewer: Refer to Engineering Report prepared by Hyalite Engineers for sanitary sewer design. A sand/oil separator is located in the building just before the sanitary sewer line exits the building. 9.6 Water Service: Refer to Engineering Report prepared by Hyalite Engineers for water design. The building will be equipped with a fire sprinkler system, so both domestic and fire lines are required. 9.7 Storm Sewer: Currently there is no storm sewer main available to this property, and all storm water will be surfaced drained to storm water detention areas on the site. Refer to Engineering Report prepared by Hyalite Engineers for the storm sewer design. 10 Landscaping 10.1 Screening of parking lots in M-1 District, and vehicle display (open sales lots) are not required proposed per paragraph 38.550.050.C.2.a (2) of the City of Bozeman Unified Development Code. However, all other landscaping requirements have been met. 10.2 Screening of off-street loading spaces (berths) is not required per paragraph 38.550.050.C.2 of City of Bozeman Unified Development Code. 10.3 Refer to Landscape Plans prepared by Red Barn Montana for landscape design. 11 Site Lighting 11.1 The site lighting located at the perimeter and the interior of the open sales lot, and parking lots will be pole mounted LED fixtures. Gallatin Subaru – Development Review March 3, 2020 Page 21 of 26 Light source (LED) are set up inside the fixture cabinet, allowing a flat bottom lenses. Proposed light fixtures have a color temperature of 5000K, with a CRI rating of +83. Color of pole mounted site lighting fixtures will be a light gray. 11.2 Pole Mounted Light Fixture Heights: All pole mounted light fixtures except those located within utility easement along the west edge of site are 18 feet above ground surface. Fixtures within the westerly utility easement are mounted at 12 feet above ground surface. Proposed pole locations and heights have been reviewed with Cammy Dooley at Northwestern Energy, receiving she preliminary approval. 11.3 Light Poles & Bases: All light poles will be square aluminum powder coated finish. The color of the poles will be a light gray. All light poles will be mounted on a 24 inch diameter concrete base, 3 feet high. 11.4 Foot-candle levels meet the intent of City of Bozeman Unified Development Code for main business districts per Table 38.570.040-2. Gallatin Subaru – Development Review March 3, 2020 Page 22 of 26 11.5 Photometric Site Plan was prepared by site lighting manufacturer Energy Bank. Refer to E101-Photometric Site Plan showing light levels at ground level not exceeding foot candle maximums. 11.6 Wall mounted light fixtures are located over all building entrances, except for the main showroom entrances, providing a 5.0 foot-candle light level. Entrances to showroom will have recessed lighting in the overhang (>3’), providing a light level of 5.0 foot-candles. Color of wall mounted site lighting fixtures will be a light gray. 12 Trash Enclosure 12.1 Trash enclosure is located out of the public view, and will be constructed of concrete masonry and steel frame/cedar clad gates. Height of the trash enclosure (walls and gate) is 8 feet. If it is determined the trash dumpsters in side trash enclosure from Interstate 90, the walls and gates will be raised to a height adequate to block view of trash dumpsters. The width of the gates provides a clear 10’ opening, and designed to accommodate a full 180 degree swing. The trash enclosure will be screened on its sides and back with landscaping material (trees and shrubs). Refer to Landscape Plans. Location of trash enclosure provides the garbage truck straight and easy access to and from enclosure. Trash enclosure design has been reviewed by the City of Bozeman’s Solid Waste Division. 13 Building Design 13.1 Design Standards The building and site are designed in accordance with automotive manufacturer’s standards and requirements. Building is designed in accordance with all applicable building codes. Building construction type is 2B – fully sprinklered. Gallatin Subaru – Development Review March 3, 2020 Page 23 of 26 13.2 This new automotive dealership facility with consist of approximately 32,054 sf (subject to adjustments). Main floor has approximately 28,954 sq. ft. Second floor (partial) has 3,100 sq. ft. 13.3 The building is divided into three distinct zones, sales, service reception, and service/parts. Sales/Offices: This portion (zone) faces the front of the property, looking onto the open sales lots. The total length of the front façade is 171’-8”, and requires vertical articulations. Subaru’s iconic gray slate tower which projects proud of the showroom curtain wall provides the required vertical articulation treatment of the front façade. 13.4.1 Showroom façade consists of floor to ceiling curtain wall with a silver ACM horizontal band above the curtain wall. The showroom entrance door has an overhang greater 3’-0” providing the required weather protection, and will contain recessed light, thus providing the required light level at building entrances of 5 foot-candles. 13.4.2 The wall height of the sales/offices portion will be 25’-10”, except at the slate veneer tower which will have a wall height of 27’-2”, satisfying the requirement for roofline modulation. 13.4.3 Roof mounted screen walls are provided around all roof mounted mechanical equipment. These screen Gallatin Subaru – Development Review March 3, 2020 Page 24 of 26 walls will be constructed of horizontal ribbed metal panels. 13.5 Service Reception: This zone is located on the east side of the facade, and where customers will bring the vehicles for servicing. This zone will be shared with both franchises, with customers entering from the west, and exiting to the east. The curved ACM overhang will extend from the showroom to the east edge of the façade. The exterior wall at the service entrance doors will be painted precast concrete wall panels. 13.6 Service Parts: This zone of the building contains employee break room, and toilet/locker room, parts storage, vehicle repair, and vehicle detailing. 13.7 Roof mounted screen walls are provided around all roof mounted mechanical equipment. These screen walls will be constructed of horizontal ribbed metal panels. 13.8 Building materials and colors are in accordance with the manufacturer’s design image requirements, and a material/color palette is included on building elevations, see Sheets A201 and A202-Exterior Elevations and Material Legend. 13.9 Transparent doors and windows have been incorporated into the design of the building in a way to eliminate any blank wall larger than 15’ wide x 10’ high. 14 Signage 14.1 All current signage on the existing building with be removed. The existing pole sign at the southwest corner of the site will Gallatin Subaru – Development Review March 3, 2020 Page 25 of 26 be relocated to Frontage Road, next to westerly access entrance. 14.2 The sign company involved on this project is Philadelphia Sign Company. 14.3 The existing double sided pole sign with signage for Subaru is proposed to be relocated in the front yard (Frontage Road). Pole sign will be located no closer than 15 feet back from front property line. Pole sign will have two legs, with a maximum height of 13 feet, and a minimum clearance of 8 feet. 14.4 Wall mounted signage is proposed as follows including estimated area: Front Elevation: 36” high Subaru “Star Cluster” (15.63 sq ft) 24” high “Subaru” illuminated channel letterset (36.5 sq ft) 18” high “Service” illuminated channel letterset (6.67 sq ft) 12” high “Express” Illuminated channel letterset (6.42 sq ft) West Elevation No signage East Elevation No signage South Elevation 53” high Subaru “Star Cluster” (33.86 sq ft) 36” high “Subaru” illuminated channel letterset (76.94 sq ft) 14.5 The estimated total area of signage for this project, including pole sign is 221.77 sq ft. Final signage area will be determined by sign companies at the time they submit application for sign permit. Gallatin Subaru – Development Review March 3, 2020 Page 26 of 26 15 Departures 15.1 The following is a summary of the departures: 15.1.1 Section 38.510.030.E.c - Parking Location: All required parking spaces are either on the side or rear of the building except for 14 parking spaces in front of the showroom. Two of these are accessible parking spaces, and another is equipped with EV charging station. Based on the alignment of the entrance drive these parking spaces have a minimal impact to the overall building façade, and makes it easy for EV owners to locate charging station, therefore meets the criteria for a departure from this requirement.