HomeMy WebLinkAbout20- Amendment 11 to PSA - Morrison-Maierle, Inc. - North 7th Ave. Lighting Design and Construction AdministrationAMENDMENT NO. 11 TO PROFESSIONAL SERVICES AGREEMENT FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION MMI. No. 0417.063 THIS IS AN AGREEMENT made as of J Va I ,between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and Morrison- Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-1113 (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated July 11, 2011, herein referred to as the Original Agreement, for professional engineering services for the North 7" Lighting Design and Construction Administration project; and WHEREAS, the scope of the Original Agreement included preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment No.l to the Original Agreement included additional miscellaneous services; and WHEREAS, the scope of Amendment No.2 to the Original Agreement included a pre -design investigation services phase; and WHEREAS, the scope ofAinendment No.3 to the Original Agreement included additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment No.4 to the Original Agreement included additional pre -design investigation services; and WHEREAS, the scope of Amendment No.5 to the Original Agreement included additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services for the project.; and WHEREAS, the scope of Amendment No.6 to the Original Agreement to transfer budget from construction engineering services to preliminary and final design level engineering services. This transferred budget previously allocated for construction services between West Villard Street and West Main Street to preliminary and final design services between Durston Road and West Villard Street. This amendment did not change the total contract amount; and WHEREAS, the scope of Amendment No.7 to the Original Agreement included additional pre -design investigation services, final design engineering services, construction services and miscellaneous services for the project.; and WHEREAS, the scope of Amendment No.8 to the Original Agreement included additional final design engineering services, construction services and miscellaneous services for the project.; and WHEREAS, the scope of Amendment No.9 to the Original Agreement included additional final design engineering services, construction services and miscellaneous services for the project.; and WHEREAS, the scope of Amendment No. 10 to the Original Agreement included additional final design engineering services, construction services and miscellaneous services for the project.; and WHEREAS, the parties desire to amend provisions of the Original Agreement to included additional final design engineering services, additional construction services and miscellaneous services for the project. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C -I 1 — SCOPE OF SERVICES FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION and EXHIBIT D-1 I — ENGINEERING FEE ESTIMATE are hereby incorporated in and made part of this agreement. The Scope of Services and Engineering Fees are increased per these exhibits. ARTICLE 1 - ENGINEERING SERVICES Article 1.1 of the original agreement is modified to include the following: 1.1. The detailed description of the specific project components is described as follows: Perform final design engineering services for improvements to North 7"' Avenue, along the frontage of parcel HH. Perform construction administration services for improvements to North 711' Avenue, between West Mendenhall Street and Durston Road. Includes streetscape work associated with the RUH Building. Perform miscellaneous engineering services as requested by the Owner. ARTICLE 6 - COMPENSATION FOR ENGINEERING SERVICE Article 6.1 of the original agreement is modified as follows: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $455,556.59 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: $62,280.56 (-14% of design fee) until the Pre -Design Investigation Phase report and exhibits have been submitted to the OWNER. $144,184.03 (-31% of design fee) until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $249,092.00 (^-55% of design fee) until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic 2 services (4.1 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Article 6.2 of the original agreement is modified as follows: Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Constriction Testing shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $ 285.395.00 except as provided under 6.2.1.2 and 6.2.4. 6.2.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.44 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terns as provided under 6.2.1.1. The amount and terns of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $ 8,360.00 which includes $ 0.00 for consultants employed by the Engineer and $ 8.360.00 for all other reimbursable expenses. expenses are identified in Exhib _" 6.2.3. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.44, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 6.3 DIRECT LABOR COST PAYMENT FOR MISCELLANEOUS SERVICES AND EXPENSES OF ENGINEER. Article 6.3 of the original agreement is modified as follows: 3 Task 701, 702 and 703 shall be compensated in accordance with the following: 6.3.1 The OWNER shall pay for Miscellaneous Services an amount not to exceed $113.879.80 except as provided under 6.3.1.2 and 6.3.3. 6.3.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.44 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.3.1.2 Notification. At any time during the project that it becomes apparent that the Miscellaneous Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to perfonning services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.3.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.3.1.1. The amount and terms of any additional compensation under 6.3.1.1 or 6.3.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.3.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.3.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $ 9.144.80 which includes $ 0.00 for consultants employed by the Engineer and $ 9.144.80 for all other reimbursable expenses. The es fi.,"..,.a ` enso are ident re'"" E—Aibit " 6.3.3 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.44, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 4 7.3 DIRECT LABOR COSTS Article 7.3 of the original agreement is modified as follows: Direct Labor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEEWs personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, drafters, specification writers, estimators, other technical and business personnel; but does not include indirect payroll related costs or fringe benefits. For the purposes of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principal $70.00/hour Supervising Engineer III $65.00/hour Supervising Engineer II $58.00/hour Senior Engineer II $50.00/hour Senior Engineer I $47.00/hour Design Engineer II $43.00/hour Design Engineer I $39.00/hour Engineer Intern II $34.00/hour Engineer Intern I $30.00/hour Environmental Scientist II $35.00/hour CAD Designer $38.00/hour CAD Tech II $27.00/hour CAD Tech I $22.00/hour Administrative Coordinator $22.00/hour Land Surveyor IV $42.00/hour Land Surveyor II $35.00/hour Survey Technician III $27.00/hour Technical Intern $20.00/hour *Non professional classified employees subject to time and one-half over time rates. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. 5 In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA &..4hqq6� %� m/A DATE: (0 - l '%'-�o ATTEST: qE��i'03 r' BY: (City Clerk) yy vim �r EJ A MORRISON-MAIERLE, INC. BY: (Vice -President) DATE: N:\0417\063\Contracts-Client\Contract Amend #11\PSA Amendment #1 Ldoc Morrison so � Maierle engineers • surveyors - planners • scientists Exhibit C-11 - Scope of Services for N. 7111 Lighting Design and Construction Administration Mendenhall Street to Durston Road CA, RUH Building CA, Parcel HH Final Design and Miscellaneous Engineering Services as requested by the City of Bozeman. May, 2020 Final Design Phase Includes finalizing construction plans for regulatory review and bidding. Specifically for this amendment it includes the following. # Description Budget Parcel HH (formerly NIJ21J) 1 Complete final design documents for parcel HH (civil, electrical, landscape) to match $15,832 streetscape sections to the north and south. Negotiate change order with the contractor for inclusion of this work under the current construction contract. Coordinate long lead time material ordering with contractor. Provide construction administration / management for the installation. The following sections describe each task as well as identifying the deliverable for each task. Task 201 Final Plan Set Preparation Task Description — A review set of construction plans based on comments and changes requested from the governing reviews and comments, as noted above. Task deliverable — Plan set for review. Task 202 Final Specifications Task Description — A review set of construction specifications. Specifications and contract documents will be a mix of City of Bozeman standards and MDT standards, as noted above. Process change order for this additional construction work. Task deliverable — Specifications and bidding documents for review. sI Morrison � Maierle engineers • surveyors • planners • scientists Task 203 Final Review/Permitting Coordination /Meetings Task Description — Final coordination for review and permitting items associated with the project, as noted above. Task deliverable — As necessary. Task 204 Quality Assurance / Quality Control Task Description — This task includes effort associated with project quality control and quality assurance review, and adds a level of QA/QC not originally scoped for the project based on requirements of MDT. Task deliverable — N/A Construction Administration Phases Includes administration of the construction contract. Specifically, for this amendment it includes the following. # Description Budget Mendenhall to Durston 1 Construction administration / management of the construction contract including bidding, $154,526 addendums and award that are currently in progress or previously completed. Upcoming work to include notice to proceed, shop submittal review, RFI responses, surveying, inspection, testing, pay requests and closeout documentation. Includes landscape construction management for landscape specific construction items like the pavers, soil cells, trees, irrigation and the Parcel S landscape improvements. # Description Budget RUH Building 1 Partial construction administration / management of the public improvements associated with $5,750 the RUH Building Streetscape project. Includes coordination with architect, shop submittal review, RFI responses, surveying, inspection, testing, and preparation of final record drawings that will be submitted to the City, likely through the architect as part of the overall project closeout documentation. 2 N� Morrison � Maierle engineers • surveyors - planners • scientists Bidding or Negotiating Phase The bidding or negotiating phase will proceed following written authorization to proceed from the owner. The following sections describe each task as well as identifying the deliverable for each task. Task 301 Prepare Advertisement, Bid Document Reproduction, Bidders List, Process Deposits Task Description — Prepare project advertisement and complete all coordination required to distribute construction documents to bidders. Task deliverable — Bidders List. Task 302 Conduct Pre -Bid Conference and Respond to Contractor Requests Task Description — Conduct pre-bid conference and respond to all Contractor BFI's prior to bidding. Task deliverable — N/A Task 303 Prepare and Issue Addendums Task Description — This task provides allowance for issuance of three (3) addendum to the plans and specifications. Task deliverable — Addendums, as necessary. Task 304 Attend Bid Opening, Prepare/Evaluate Bid Tab, Award Recommendation Task Description — Attend bid opening and subsequently process bid tab and make award recommendation. Task deliverable — Bid tab and award recommendation. 3 Morrison Maierle engineers • surveyors - planners - scientists Task 305 Award Contract and Contract Documents Task Description — Facilitate contract award and execute contract documents. Task deliverable — Two (2) signed originals of all contract documents to City of Bozeman and one (1) signed original of all contract documents to Contractor. Construction Phase The construction phase includes the general administration of the construction contract. The following sections describe each task as well as identifying the deliverable for each task. Task 401 Conduct Pre -Construction Conference and Notice to Proceed Task Description — Coordinate pre -construction conference and prepare Notice to Proceed. Task deliverable — Notice to Proceed. Task 402 Shop Drawing/Traffic Control/Permit Review and Approval Task Description — Review and approval of applicable Contractor submittals. Task deliverable — Approved Contractor submittals. Task 403 Construction Layout/Control Task Description — Provide construction staking services and control points as requested by Contractor and per project specifications. Task deliverable — N/A 0 Morrison Maierle engineers • surveyors � planners - scientists Task 404 Resident Project Representative (3/4 Time, 6.0 Months) Task Description — Complete duties and responsibilities of the Resident Project Representative (RPR). Estimate effort is based on a six-month (6.0) month construction window with an RPR on-site approximately 75% of the time. Task deliverable — N/A Task 405 Construction Management - Coordination, Schedule Progress, Pay Requests Task Description — Provide construction management services, schedule review and updates, and preparation/review of Contractor pay requests. Task deliverable — Weekly progress reports and pay requests. Task 406 Final and Two Year Warranty Inspection Task Description — Coordinate final and two-year warranty walk through. Prepare punch list items and notify City of Bozeman when items are complete. Task deliverable — Punch lists and completion notifications. Project Documentation Project documentation includes preparation of a construction notebook documenting the construction events that occurred throughout the project. The following sections describe each task as well as identifying the deliverable for each task. Task 501 Progress Reports (Monthly) Task Description — Preparation and assembly of monthly progress reports based on weekly progress reports throughout the project. Task deliverable — Monthly progress reports. E NI Morrison � Maierle engineers • surveyors • planners , scientists Task 502 Record Drawings and Project Notebook Task Description — Preparation and assembly of record drawings and project construction notebook. Task deliverable — Project construction notebook and Mylar record drawings. Construction Testing Construction testing shall include material testing and verification of contract compliance. The following sections describe each task as well as identifying the deliverable for each task. Task 601 Concrete Strength, Air, Temp, Slump (Flatwork) Task Description — Completion of concrete testing of pole bases and flatwork per City of Bozeman standards Task deliverable — Testing reports. Task 602 Subgrade and Base Densities Task Description — Testing of subgrade and base material densities for impervious surface improvements. Task includes four (4) soil proctors to determine maximum densities for on-site backfill material. Task deliverable — Testing reports. rol N1 Morrison � Maierle engineers • surveyors • planners • scientists Miscellaneous Services Miscellaneous services as described below. The following sections describe each task as well as identifying the deliverable for each task. Task 701 Miscellaneous Services — Additional Requested Task Description — Task 701 provides for additional effort as directed by Owner. Specifically, for this amendment it includes the following. # Description Budget Miscellaneous Requested Services 1 Provides for additional effort as directed by the owner for Midtown. Effort to date includes $14,000 preparation of the traffic control plan required by MDT, updates to encroachment permits per MDT, coordination and driveway removal for parcel Il, coordination and easement/exhibit updates for parcel HH, as well as future requested effort as necessary to assist the board in its vision for Midtown. Task deliverable — As requested. Street Tree / Stormwater Analysis, Design and Construction Professional services as described below. The following sections describe each task as well as identifying the deliverable for each task. Task 801 Pre -Design Analysis and Report Task Description — Includes effort to prepare a pre -design report detailing pre-existing conditions, recommended trees and appropriate spacing, case studies of similar projects, storniwater treatment possibilities, cost considerations and anticipate maintenance. Task deliverable —Not included in PSA Amendment #11. Task 802 Preliminary / Final Design Task Description — Will include both preliminary and final design of the tree types, locations, planting bed details including species, water main survey for irrigation, water tapping design, meter design, irrigation performance specification, paver design and installation details. N� Morrison � Maierle engineers • surveyors • planners • scientists Task deliverable — Not included in PSA Amendment #11. Task 803 Construction Services - Landscaping Task Description — Construction oversight of boulevard planting installation and landscape amenities to ensure compliance with design intent. Includes Parcel S landscape oversight as well. Task deliverable — N/A Exhibit D-11 - Engineering Fee Estimate N0 Morrison City of Bozeman, MT - North 7th Lighting Design and Construction Administration Maierle Mendenhall St. to Durston Road CA + RUH Building CA + Parcel HH Final Design + Misc. Services> Prepared For: David Fine, City of Bozeman Economic Development Engineering Services Quantity or Duration 1730 Laborstaff ,. Soil Proctor (up to 4 Task or Division 200 - Final Design Phase Assigned Hours Rate Labor $35.00 Design Engineer I 24.00 $134.00 $3,216.00 201. Final Plan Set Preparation Senior Engineer I 8.00 $162.00 $1,296.00 202. Final Specifications / Bidding Bees (Change Order Design Engineer I 16.00 $134.00 $2,144.00 Docs) Senior Engineer 1 4.00 162.00 $648.00 203. Final Review/Permitting Coordination Senior Engineer I3.00 162.00 486.00 204. uali Assurance uall Control Su ervisin En ineer III 1.00 224.00 224.00 Subtotal Design Phase 56.00 $8,014.00 300 - Bidding or Negotiating Phase 301. Prepare Advertisement, Bid Document Administrative Coordinator 20.00 $76.00 1520.00 Bidders List Process Deposits Senior Engineer I 6.00 $162.00 $972.00 -Reproduction, 302. Conduct Pre -Bid Conference and Respond to Design Engineer I 4.00 $134.00 $536.00 Contractor Requests Senior Engineer I 2.00 $162.00 $324.00 Design Engineer I 12.00 $134.00 $1,608.00 303. Prepare and Issue Addendum Senior Engineer I 8.00 $162.00 $1,296.00 304. Attend Bid Opening, Prepare/Evaluate Bid Tab, Design Engineer I 2.00 $134.00 $268.00 Award Recommendation Senior Engineer I 4.00 $162.00 $648.00 Senior Engineer I 5.00 162.00 810.00 305. Award Contract and Contract Documents Su ervisin En ineer III 2.00 t224.00 $448.00 SubtotalBidding o .. . r• $8,430.00 400 - Construction Phase 401. Conduct Pre -Construction Conference and Notice Design Engineer I 12.00 $134.00 $1,608.00 to Proceed Senior Engineer I 6.00 $162.00 $972.00 402. Shop Drawing/Traffic Control/Permit Review and Design Engineer I 48.00 $134.00 6 432.00 Senior Engineer I 20.00 $162.00 $3,240.00 -Approval 403. Construction Layout/Control Land Surveyor II 96.00 $120.00 $11,520.00 404. Resident Project Representative (-1/2 Time, 6.0 Technical Intem 424.00 $69.00 $29,256.00 Months) Engineer Intern II 210.00 $117.00 24 570.00 405. Construction Management - Coordination, Design Engineer I 20.00 $134.00 $2,680.00 Schedule Progress, Pay Requests Senior Engineer I 24.00 $162.00 $3,888.00 Desi n Engineer I 8.00 134.00 $1,072.00 406. Final and Two Year Warranty Inspection Senior En ineer I 8.00 $162.00 1 296.00 SubtotalConstruction rr $86,534.00 500 - Project Documentation Design Engineer I 12.00 134.00 $1,608.00 501. Progress Reports Senior Engineer I 24.00 $162.00 $3,888.00 Engineer Intern II 30.00 117.00 $3,510.00 502. Record Drawings and Project Notebook Senior En ineer I 1 24.00 $162.00 $3,888.00 SubtotalDocumentation 90.00 $12,894.00 600 - Construction Testing Technical Intern 64.00 69.00 $4,416.00 601. Concrete Strength, Air, Temp, Slump (Flatwork) Engineer Intern II 32.00 $117.00 $3,744.00 Technical Intern 72.00 69.00 $4,968.00 602. Subgrade and Base Densities En ineer Intern II 36.00 1117.00 $4.212.00 Subtotal. r• r0 $17,340.00 700 - Miscellaneous Services 701. Miscellaneous Services - Additional I nested Not to Exceed Rate Schedule 0.00 14 000.00 Subtotal. 0.00 $14,000.00 800 - Street Tree / Stormwater Analysis, Design and Landscape Arch. 801. Pre -Desi n Anal sis and Report 0.00 0.00 0.00 802. Preli.ina Final Design DHM Desi n I Sub. Consult. $2,400.00 $2,400.00 803. Construction Services I DHM Desinn I Sub. Consult. I 25 415.00 25 415.00 Subtotal - Street Tree / Stormwater Analysis, Design 0.00 $27,815.00 Direct • mi Quantity or Duration 1730 Charge Rate $0.68 Total Expense 1176.40 Soil Proctor (up to 4 4 $400.00 $1,600.00 Nuclear Density Meter (days) 35 $35.00 $1,225.00 Concrete Strength Testing 22 sets 24 $200.00 $4,800.00 Record Drawings sets 1.00 $450.00 450.00 -Mylar Miscellaneous Expense 1.0% $175,027.00 1.0% $1,750.27 Survey Equipment (day) Subtotal. 17 Direct Expensesr: $240.00 $4,080.00 Project Total - Engineering Services $190,108.67 Rounded to an even N:\0417\063\Contracts-client\Contract Amend #11\Exhibit D-11 - Eng Fee_Men to Durston.As 5/8/2020 HHM HISIGH LANDSCAPE ARCHITECTURE I LAND PLANNING I ECOLOGICAL PLANNING I URBAN DESIGN February 20, 2020 Morrison-Maierle Kevin D. Jacobsen, PE LEEP AP 2880 Technology Blvd. Bozeman, Montana 59718 Re: North 7th Ave. Streetscape Improvements- Construction Administration Services Dear Kevin, We have enjoyed working with you on the North 7th Avenue project and are excited to start the construction phase of the project this summer. We look forward to continuing our collaboration with Morrison-Maierle and DHM Design prides ourselves in working in collaborative efforts alongside our consultants sharing our depth of experience and energy to realize our client's goals. The following scope is based on our discussion with you in February for the Construction Administration phase of the streetscape project. Project Understanding: We understand that this phase of the project will include site meetings, submittal reviews, addressing RFI's, and determining and reviewing punch list items. It is our understanding from the bid documents that our effort in the construction administration process will be related to the permeable pavers, Strata -cells, irrigation, and vegetation. DHM has prepared the scope based on the current construction schedule of 210 days. Scope of Work• The following scope is based is based on our understanding of the project scope, process and desired deliverables. Task 1: Construction Administration Services Based on a construction schedule of 210 days, submittals related to the landscape architecture scope, and typical weekly construction team meetings, DHM will provide the following construction administration services with approximate hours associated to each task. (See CA Scope spreadsheet attached for detailed information). 1. Pre -Construction meeting with selected contractor- assumes a 3 -hour meeting 2. Submittal review and revisions 3. Addressing and responding to RFI's 4. Attend weekly construction meetings- assumes 24 on-site meetings at 2 hours each, 6 -month duration 5. Payment application review 6. Preliminary Punch -Walk with punch list 7. Final Punch -Walk with punch list 8. Assist with project closeout DENVER CARBONDALE DURANGO BOZEMAN WWW.DHMDESIGN.COM 27 East Main Street, Suite D Bozeman, MT 59715 P: 406.219.2012 HHM DESIGN 9. Coordination of as -built drawings with Contractor (contractor to supply) Professional Fees: Task 1: Construction Administration Services $25,415 Project Total: $25,415 Standard Hourly Rates for DHM Design: Principal $195 Ecologist / Arborist $160 Associate Principal $125 Senior Associate $120 Associate $115 Senior Designer $110 Designer / Graphic Artist $85 Natural Resources Technician $90 Clerical/Word Processing $65 Schedule and Staff: DHM is available to begin this project immediately to meet your schedule. DHM Design Staff: Robin Spear—Associate Principal -in -Charge Eric Meadows —Senior Associate, Project Manager Henry Herman — Designer Time and Materials: The billing for the work outlined above will be done on an hourly basis, not to exceed fees as identified above. The top -set number as provided is sufficient for the tasks as we know them at this time. An itemized statement shall be sent monthly, and payment is due within 45 days of receipt. In addition to the fee amounts, the following will be billed as reimbursable expenses at our direct costs: Xerox copies, computer plotting, long distance calls, deliveries, mileage and postage. Additional Services: Should additional services such as additional site plan/perspective renderings, or additional meetings beyond what is noted above etc. become necessary this work will be done on an hourly basis at our standard hourly rates. DHM will notify you prior to completing any additional services for approval. If this work becomes significant, we may, at your request, submit a proposal at that time which will identify the extent of any additional work prior to commencement of the work. Reimbursable Expenses: Reimbursable expenses are not included in the fees provided above. Meeting time above and beyond what is listed above will be billed at our standard hourly rates as an additional service. FHM DESIGN Information to be provided by others: For DHM to begin work, the following is to be provided by others: 100% signed and stamped drawing set, including addendums and revisions, in PDF and hard copy format Assumptions: The following is a list of assumptions: . Weekly construction meetings will be on-site. Exclusions: The following is a list of exclusions from this scope: ASI and design revisions. Additional meetings / submittals beyond what is noted above. Ecological studies to determine nesting seasons. Thank you again for the opportunity to continue working with Morrison-Maierle, if you have any questions about the scope or the fees please feel free to call me. Respectfully, DHM Design Robin Spear Associate Principal — DHM DESIGN Landscape Architecture I Land Planning I Ecological Planning I Urban Design Direct: 406.219.2012 ext. 401 1 Cell: 415.272.0914 If you find the general scope and costs presented acceptable, please sign and return as our authorization to proceed. Approved by: Signature: Name: Date: \VR I n / 0 n /iYGI\VG a7 I RGG I �7V/irG CONSTRUCTION ADMIN SERVICES Bozeman School District #7 - Bozeman, MT Work Plan and Professional Fees DESCRIPTION OF SERVICES Prepared By: DHM Design Date: 4/20/2020 Landscape Architect DHM Design c d L 40.00 v a rn 2.00 C CL ° C 0 0 2.00 M N c O) Q 8.00 tC U ONE U .O N _O C Q a Ln N o N ul 00 to erg ess TASK 1: CONSTRUCTION ADMIN SERVICES ■ Construction Services - Billed on a Time/Expense Basis - Estimated Hours Only - Kickoff Meeting with Selected Contractor - Submittal Review - Address incoming RFI's - Attend Weekly Site Meetings - 24 meetings Total (6 month duration) - Payment Application Review - Preliminary Punch -Walk with Punch List - Final Punch -Walk with Punch -List - Assist with Project Closeout - Coordinate As -Built Drawings with Contractor (Contractor to supply) Meetings: - As Requested PROPOSAL NOTES & OMISSIONS Subtotals (TASK 1): $ 2,375.00 $ 21,480.00 $ 1,360.00 Estimated Expenses (travel, mileage, printing, etc.): $ 200.00 Estimated Total: $ 25,415.00 Notes: 1. Time & Materials: All billing for work outlined above is billed at an hourly, not to exceed basis. Any time not used will not be billed to the project. 2. Reimbursable Expenses: Reimbursable expenses are in addition to the design fees and include reproduction costs postage, and shall be billed at their actual cost in addition to the hourly rate. Our travel expenses will also be billed at our direct expense. 3. Additional Services: Should additional services become necessary; this work will be done on an as -needed hourly basis at our standard hourly rates. If this work becomes significant, we may, at your request, submit a proposal at that time which will identify the extent of any additional work prior to commencement of the work. 4. DHM Design Staff is available to begin work immediately as a commitment to expediting the process 5. Construction Admin Services will be billed on a time & expense basis, as needed 3.00 3.00 2.00 40.00 2.00 40.00 2.00 48.00 2.00 8.00 2.00 12.00 8.00 2.00 12.00 8.00 2.00 8.00 2.00 8.00 Subtotals (TASK 1): $ 2,375.00 $ 21,480.00 $ 1,360.00 Estimated Expenses (travel, mileage, printing, etc.): $ 200.00 Estimated Total: $ 25,415.00 Notes: 1. Time & Materials: All billing for work outlined above is billed at an hourly, not to exceed basis. Any time not used will not be billed to the project. 2. Reimbursable Expenses: Reimbursable expenses are in addition to the design fees and include reproduction costs postage, and shall be billed at their actual cost in addition to the hourly rate. Our travel expenses will also be billed at our direct expense. 3. Additional Services: Should additional services become necessary; this work will be done on an as -needed hourly basis at our standard hourly rates. If this work becomes significant, we may, at your request, submit a proposal at that time which will identify the extent of any additional work prior to commencement of the work. 4. DHM Design Staff is available to begin work immediately as a commitment to expediting the process 5. Construction Admin Services will be billed on a time & expense basis, as needed Kevin D. Jacobsen From: Eric Meadows <emeadows@dhmdesign.com> Sent: Friday, May 8, 2020 1:21 PM To: Kevin D. Jacobsen Cc: Robin Spear Subject: north 7th ave added project area - fees ***This message originated from an External Source.' Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hi Kevin, Thanks for the update on the North 7`h Ave project — added project area in front of old pawn shop — this morning. The addition will certainly help strengthen the connectivity of the corridor and added street trees is always a good thing. I have given some thought to fees for completing this work. Please see below, and let me know if you have any questions. DHM Design - $1,600.00 Hydrosystems KDI (irrigation consultant) -$800.00 Total = $2,400.00 The above assumes M&M will provide updated CAD base plans of this change / project addition. DHM will then update our landscape CAD base and necessary planting, paver, and soil cell sheets. DHM will provide material quantities + take -offs for added area, as well as general project coordination with civil and irrigation teams. Thanks. -Eric Eric Meadows Senior Associate I PLA DENVER I CARBONDALE I DURANGO I BOZEMAN 0:406.219.2012 1 C:949.315.0624 GwUHM HESIGN e>- LANDSCAPL ARCHIItC IURL 1� URBAN DESIGN + LAND PLANNING u *d ECOLOGICAL PLANNING