Loading...
HomeMy WebLinkAbout20077 - Engineering Comment Response 04.23.2020 MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: Sarah Rosenberg, Planner II FROM: Anna Russell, Engineer II RE: Bozeman Gateway Site V SP Application No. 20077 DATE: March 25, 2020 ----------------------------------------------------------------------------------------------------------- Engineering Comments Wastewater 1. The applicant must provide sewer demand flow data to the City (Anna Russell) prior to Site Plan approval to verify capacity in the system. The City is aware of constriction in the downstream sewer system along Hunters Way. Flow monitoring was conducted for the AED Building to the east. The City will input the flow monitoring data from the AED site, any additional known projects adding flow into the downstream system, and the flows from this project into the City sewer model to verify capacity. Acknowledged. Sewer demand flow data has been included with the Site Plan Application in Appendix 3. Water 2. The applicant is advised to review the attached water line lay lengths exhibits to ensure the mechanical rooms are large enough to install the water service per the City standard. Understood the water line lay lengths have been incorporated into the utility drawings and the mechanical room has been sized accordingly.