Loading...
HomeMy WebLinkAbout20077 - DRC memo Response 04.23.2020Page 1 of 1 FROM: DEVELOPMENT REVIEW COMMITTEE RE: Site V Bozeman Gateway, Concept Review, Application 20077 DATE: MARCH 31, 2020 Planning Division, Sarah Rosenberg, srosenberg@bozeman.net , 406-582-2297 1. BMC 38.510.030. Ensure elevations meet façade transparency requirements and are labeled on elevation sheets. Acknowledged 2. BMC 38.520.040.D. Pathways must be separated from structures by at least three feet of landscaping Acknowledged 3. BMC 38.530.050.B. Ensure widows are not mirrored. Acknowledged 4. BMC 38.530.060.C.2 Ensure that the metal siding is 24 gauge thickness. Acknowledged Engineering Division, Anna Russell, arussell@bozeman.net 406-582-2281 1. Please see attached memo These Divisions did not provide comment. Contact reviewers directly with individual questions. 1. Fire Department; Scott Mueller, smueller@bozeman.net, 406-582-2353 2. Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235 3. Building Division; Bob Risk brisk@bozeman.net, 406-582-2377 4. NorthWestern Energy; Cammy Dooley, cammy.dooley@northwestern.com 5. Parks and Recreation; Addi Jadin, ajadin@bozeman.net, 406-582-2908 6. Sustainability Division; Natalie Meyer, nmeyer@bozeman.net, 406-582-2317 7. Water Conservation; Jessica Ahlstrom, jahlstrom@bozeman.net, 406-582-2265 8. Stormwater Division; Kyle Mehrens, jkmehrens@bozeman.net, 406-582-2270 9. Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-3200 10. Forestry Division; Alex Nordquest, anordquest@bozeman.net, 406-582-3205