Loading...
HomeMy WebLinkAboutWastewater Flow Analysis 01-29-20 Wastewater Calculations Included in this section are the Wastewater Daily Flow Analysis and the Baxter Meadows Lift Station (BMLS) Analysis. The BMLS Analysis shows that the Flanders Mill Subdivision Phase 7 apartment development was originally designed for 200 dwelling units. The Flanders Mill Apartments development proposes 200 dwelling units and therefore meets the requirements for wastewater flow capacity set forth by the remaining capacity of the lift station. Wastewater Daily Flow Analysis Flanders Mill Apartments Phase I - III Average Daily Flow No of Units 200 Residents/unit 2.17 Gallons per Capita/day 65 Average Daily Flow 28,210 gpd Peaking Factor Calculations Zoning Acres Units/Acre Density Total (residents/unit) Population R4 9.14 21.88 2.17 434 Peaking _ Q(max) = 18 +P 0.50 P =Population/thousands =47\3/1000 = 0.434 Factor Q(ave) 4 +P 0.50 Peaking Factor = 4.01 Peak Hour Sewer Demand Average Daily Flow 28,210 gpd 1175.4 gph 19.6 gpm Peaking Factor 4.01 Peak Hour Sewer Demand 4707.6 gph 78.5 gpm 629.36 cfh 10.49 cfm 0.175 cfs