Loading...
HomeMy WebLinkAboutSht C1.2 - Civil Grading Plan PH I Rev 1 05-20-20 o FLANDERS MILT. r o o P "P-b -P H-1 "P�"P-"�„P�"P � "a Pia"P� P SCALE P �l 0 211 40 80END CRIB w / O TBC 30.9/- 44229.. \ 1"-10 J _ 0.0_SLOPE 9.0 p ��� )I- 1% 0 4530� END CRB/ •°' TBC 309 ro °' GRADING PAVING & DRAINAGE: / TBC 31.1 I/ w INSTAL L C ONCRETE STEPS `n / TBC 31.1 - 2 SETS 2 - 6.5"f STEPS w 4� / 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MANAGING CONSTRUCTION ACTIVITIES TO - �I I-' 1 SET 3 - 6.5"t STEPS INSURE THAT PUBLIC AND PRIVATE STREETS AND PARKING LOTS ARE KEPT CLEAN OF MUD, � L 5' LANDING BETWEEN STEPS. DUST OR DEBRIS. DUST ABATEMENT SHALL BE MAINTAINED BY ADEQUATE WATERING OF MAX SLOPE OF LANDING 2% THE SITE BY THE CONTRACTOR TO SUBSTANTIALLY LIMIT DUST FROM THE CONSTRUCTION O ��O Q SITE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR ALLOW CONSTRUCTION DEBRIS, Z I MUD OR GRAVELS TO BE LEFT ON THE STREETS OVER NIGHT. FF ELEV 4731.r15 I 2. SITE CONTRACTOR SHALL SUBMIT AN APPLICATION AND PROCURE A STORM WATER oq/ I C DISCHARGE PERMIT PRIOR TO DISTURBANCE OF SITE. �p NTq Nq 3. ALL GRADING, ROCKING AND PAVING SHALL CONFORM TO MONTANA PUBLIC WORKS cxais c. STANDARD SPECIFICATIONS, MOST CURRENT ADOPTED EDITION. euoEsa 1 TBC 29.97 rv".,oazs ac ,I"N `� p,. "" 4. CLEAR AND GRUB WITHIN WORK LIMITS SHOWN ON THE DRAWINGS ALL SURFACE TBC 29.14 END CURB VEGETATION, TREES, STUMPS, BRUSH, ROOTS, ETC. STRIP WORK LIMITS, REMOVING ALL S "E" TBC 28.96 TBC 28.17 ORGANIC MATTER WHICH CANNOT BE COMPACTED INTO A STABLE MASS. ALL BRUSH AND N45EO \ \ FF EL+FV -TBC.28.88 DEBRIS ASSOCIATED WITH CLEARING, STRIPPING OR GRADING SHALL BE REMOVED AND ` TBC 29.96 G °� M 8 DISPOSED OF OFF-SITE. 4731.2 ,o, G o DRAWN BY: CGB A6l� A1. C, 'G 5. FOLLOWING STRIPPING OPERATIONS, SUBGRADE SHALL BE COMPACTED TO 95%OF THE udp ,y�C, TBC 29.85 �29 , \ M / 8"55 8 ss MAXIMUM DRY DENSITY AT +/- 2 PERCENTAGE POINTS OF OPTIMUM MOISTURE CONTENT REVIEWED BY: XXX _ 0 •p �\ M �� / RYANSUN PER ASTM D-698 TEST METHOD (STANDARD PROCTOR). PROJECT ENGINEER:CGB �0 ^i 4732 ` \ / I -q,`� Q 5� - 6. SUBGRADE SHALL BE PROOF ROLLED AND SOFT AREAS SHALL BE OVER-EXCAVATED DESIGNED BY:CGB M 0 S ` END CURB AND REPLACED WITH STRUCTURAL FILL. SUBGRADE MUST BE INSPECTED AND APPROVED FF ELEV .yA _ / TBC 29.0 0 TBC .4 BY THE OWNER'S REPRESENTATIVE PRIOR TO PLACING EMBANKMENTS, ENGINEERED FILLS 4732.2 °�/ TB 8. S TBC 28.86 TBC 28.4 Q C OR FINE GRADING FOR BASE ROCK. _ 1.5 O \ TBC 28.4 TBC 28.2 7. ALL FILLS SHALL BE ENGINEERED EXCEPT FOR FILLS LESS THAN 18-INCHES IN DEPTH i \> 9.0 WHICH ARE LOCATED OUTSIDE THE PUBLIC RIGHT-OF-WAY, BUILDING PADS, PARKING LOTS :. S TBC 28.54 T N• I OR OTHER AREAS TO BE IMPROVED. ENGINEERED FILLS SHALL BE CONSTRUCTED IN LIFTS (� TBC 30.5 \�// �,,/ I n I I NO GREATER THAN 8-INCHES OVER APPROVED SUBGRADE. EACH LIFT SHALL BE - X\ a )� 7 11 a COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY AT +/- 2 PERCENTAGE POINTS OF r b FF ELEV TBC 30.4 4 it TBC 28.77 OPTIMUM MOISTURE CONTENT PER ASTM D-698 TEST METHOD (STANDARD PROCTOR). a o I - S /I FF 8. SUB BASE AND CRUSHED BASE ROCK SHALL CONFORM TO THE REQUIREMENTS OF 4733.1 dl \ fig. ELEV Ilp. � SECTION 02234 (SUB BASE COURSE) AND SECTION 02235 (CRUSHED BASE COURSE) b � ^M I '� TBC 1 TBC 2995 h I n INSTA CONCRETE STEPS MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS). COMPACT TO 95%OF THE W `�' ` -TBC 32.95- 31.9 kk1 h t TBC ._ 4730.6 �_ 1 SET - 6.5"t STEPS MAXIMUM DRY DENSITY AT +/- 2 PERCENTAGE POINTS OF OPTIMUM MOISTURE CONTENT CfJ � Lam"'' T„Q• 4728. 28'66 1 SET - 6.5"t STEPS PER ASTM D-698 TEST METHOD (STANDARD PROCTOR). a TBC 32.30 \ 1�- TBC 30.2 *END CURB � �. �. � o - 5' LA ING BETWEEN STEPS. N TBC 33.07 ��/ T TBC 30K5\ TBC 8.8 ry MAX PE OF LANDING 2% 9. A.C. PAVEMENT SHALL CONFORM TO SECTION 02510 (ASPHALT CONCRETE PAVEMENT) / I TBC 32.25 TBC 31.72 TBC 30.42 \ \ 47 85 � Z- - - JOo'I Iv MPWSS FOR TYPE B MIX. A.C. PAVEMENT SHALL BE COMPACTED TO A MINIMUM OF 92% 17� 7 Z 0 - ---- a b �(� OF THE THEORETICAL MAXIMUM RICE SPECIFIC GRAVITY. COD W // TBC 29.95 J END CURB A' \ \ 47 9 Q lal 10. PIPE BEDDING AND BACKFILL ALL PIPES SHALL BE BEDDED WITH MINIMUM 4-INCHES A TBC 32.75 ,TBC 31.82 "` """". TBC 32.98 4729 °�S o r OF TYPE 1 PIPE BEDDING AND BACKFILLED WITH THE SAME MATERIAL A MINIMUM OF "'1� TBC 32.75 1S TBC 32.1 R^,yp. D "i- 6-INCHES OVER THE TOP OF THE PIPE PER CITY OF BOZEMAN STANDARD DETAIL 02221-1. PIPE EDDING \ a m C6" INOMPACTED TOTO AT TRENCH BACKFILL SHALL BE LEASTEAST095%RELATIVE COMPACTION PROPER DMOISTURE LCONTENTOAND XCEEDING 31.9 \ TBC ,.. - I Im '� 30.4 4729. 0 Ei LEV TBC 32.57 FF TBC 30.2 �-yN ' �`� ial INSTALL CONCRETE STEPS 11. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, STRAIGHT GRADES SHALL BE RUN c' 4730.9 I BETWEEN ALL FINISH GRADE ELEVATIONS AND/OR FINISH CONTOUR LINES SHOWN.TBC 31.94 1 SET 2 - 6.5"f STEPS TBC 32 46 1 SET 3 - 6.5"t STEPS p4Q� I f o 0 TBC 30.46 \ I 5' LANDING BETWEEN STEPS. 12. ALL EXISTING OR CONSTRUCTED MANHOLES, CLEANOUTS, MONUMENTS, GAS VALVES, W O MAX SLOPE OF LANDING 2% WATER VALVES AND SIMILAR STRUCTURES SHALL BE ADJUSTED TO MATCH FINISH GRADE OF / �� G O J�� \ THE PAVEMENT, SIDEWALK, OR LANDSCAPED AREA WHEREIN THEY LIE. 1�1 �. Ja o ? <' (/((�rj�/ 13. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, NO CUT OR FILL SLOPES SHALL BE .5 o 4730 b\\ FF ELEV \ p O\ I CONSTRUCTED STEEPER THAN 2H:iV. MAXIMUM SLOPE IN DETENTION BASIN 4:1 O o 732.0.1 II I-a TBC 32.9 G 4732.8 � 14. ALL PLANTER AREAS SHALL BE BACKFILLED WITH APPROVED TOP SOIL MINIMUM 6" THICK. STRIPPING MATERIALS SHALL NOT BE USED FOR PLANTER BACKFILL. ry TBC 32.27 O Z \ � TBC 32.6 4731. .,�ry .,� `,1 CURBS & SIDEWALKS TBC ".57 1. UNLESS OTHERWISE SHOWN OR INDICATED ON THE DRAWINGS, 6-INCHES NOMINAL CURB PHASE G EXPOSURE USED FOR DESIGN OF ALL PARKING LOT GRADES. LINE C ! FFELEV \ 2. CONTRACTOR SHALL CONSTRUCT HANDICAP ACCESS RAMPS IN ACCORDANCE WITH CITY G 4731.5 y ka i INSTALL CONCRETE STEPS OF BOZEMAN CURRENT ADA REQUIREMENTS. �d T TBC 33.5 \ 4733.2 / \1 SET 2 - 6"t STEPS sS.a 9 ^/ 1 SET 3 - 6"t STEPS - 3. SIDEWALKS SHALL BE A MINIMUM OF 4-INCHES THICK OVER COMPACTED SUBGRADE AND 4 TBC 32.25 � O 7 C .4 / N 5' LANDING BETWEEN STEPS. - \ BASE ROCK. ALL SIDEWALKS SHALL BE CONSTRUCTED USING 4,000 PSI CONCRETE. � MAX SLOPE OF LANDING 2% TBC 33.3 4� \ TB � n 33.6 47 4>33 0 S A h 00 \ STALL CONCRETE STEPS Ra 1 SET 2 - 6"t STEPS 1� ��. 1 SET 3 - 6"t STEPS CS ELEV TBC 33.75 I .FF ELEV I NI �F / m 5' LANDING BETWEEN STEPS. 35.85 s �; 4734.3 FF ELEV g MAX SLOPE OF LANDING 2% N GRID BRK II I 1I _ GRD BRK ]_/_TBC 33.83 _ I AlI 4734.0 I \�\\ ® . 00 TBC 34.14 41 40 RAMP 4733.0 --- - 4732.0 °0 9 o m i s -�SS 8 M„8 - yy. ss.8 Ss e_ �TE STEPS M„a-INSTALL CONCRETE STEPS SHEET 2 SE STEPS 2 SETS 2 - 6"f STEPS / _ C1,2 5' LANDING BETWEEN STEPS. SS„e_5' LANDING BETWEEN STEPS. MAX SLOPE OF LANDING 2% MAX SLOPE OF _LANDING 2% FLAMERS MML APT GRADING PLAN PROJECT:17-128 DATE:01/28/20