Loading...
HomeMy WebLinkAboutStormwater Report and Calculations 05-20-20 STORMWATER MANAGEMENT DESIGN REPORT FOR: FLANDERS MILL APARTMENTS LOT 1, BLOCK 25 FLANDERS MILL SUBDIVISION BOZEMAN, MT Prepared By: M MADISON ENGINEERING Madison Engineering 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 JANUARY 2020 REVISED MAY 2020 STORMWATER MANAGEMENT DESIGN REPORT FOR: FLANDERS MILL APARTMENTS LOT 1 , BLOCK 25 FLANDERS MILL SUBDIVISION BOZEMAN, MT uj Q Uiv'N-���� Madison Engineering 895 Technology Blvd Ste 203 Bozeman, MT 59718 (406) 586-0262 JANUARY 2020 REVISED MAY 2020 FLANDERS MILL APARTMENTS MASTER SITE PLAN LOT 1, BLOCK 25, FLANDERS MILL SUBDIVISION STORMWATER DESIGN REPORT This design report will give an overview of the proposed stormwater system for the Flanders Mil] Apartments Master Site Plan located in Lot 1, Block 25 of Flanders Mill Subdivision, Bozeman, Montana. The project site is broken into three phases of development. The water, storm and sanitary infrastructure will be installed entirely during Phase 1 along with associated parking lot improvements and buildings in Phase 1. Phases 2 and 3 will consist of associated parking lot improvements and buildings in those areas. The first phase is located at the north end of the site, which is the lowest in elevation. The stormwater collection system for the entire project consists of two inlets that surface drain all three development phases to an underground ADS retention system. The two inlets and retention system are located in Phase 1. This simplifies the stormwater design considerations for the phased development because new pavement and buildings constructed during later phases will simply contribute to the existing system installed during Phase 1 which has been sized for the entire three phases of development. Two post development drainage areas were created within the project. Runoff from Drainage Areas 1 and 2 will be contained on site in Retention Facility 1. This retention facility will be comprised of an ADS SC-740m Stormtech system located under a portion of the parking lot in the northwest corner of the site. The system will be equipped with an overflow manhole that drains into an existing curb inlet in Harvest Parkway. In the event that the system is full it will backflow the incoming drainage pipe and fill the overflow manhole and be released into the existing subdivision infrastructure. A copy of the C&H Stormwater Report for Phase & of Flanders Mill is include din this submittal. The following references were used in the preparation of this report: a. COB Design Standards and Specifications Policy, 2004. Addendum #6 b. COB Modifications to Montana Public Works Standard Specifications (MPWSS) A. Stormwater Infrastructure Calculations The project area was divided into drainage areas as shown on Sheet SD 1.0 in Appendix A. These drainage areas were used to determine the stormwater runoff flows, which in turn were used to determine the required underground retention volume and storm drain pipe sizes. Calculations are found in Appendix B. The underground system was designed to detain the stormwater runoff from the 10-year storm event or the first 0.5 inch of rainfall over parking impervious surfaces, whichever is greater. It was determined that the first half inch of runoff was greater than the required detention volume, so the half inch runoff volume governed the design. Flanders Mill Apartments Master Site Plan Stormwater Design Report Page 1 of 2 B. Storm Drain Piping The proposed storm drains that carry runoff into the underground retention system were sized to carry the 25-year storm event peak runoff flow. It was determined that an arch reinforced concrete pipe (RCP) 22 inches wide x 13 inches tall would suffice for Drainage Area 1 and a 15- inch diameter PVC storm drain pipe is sufficient to carry the flows from Drainage Area 2. Calculations are found in Appendix B. C. Area Drain Grate Sizing The area drain that receives runoff from the majority of the site was checked for capacity. Assuming a water depth above the grate of 0.6 feet, the capacity of the selected 33-inch diameter grate is 10.4 cfs, which exceeds the 25-year storm runoff tributary to that point of 9.3 cfs. With a depth of 0.6 feet above the grate, the water surface elevation at the adjacent curb is kept below 0.15 feet below top back of curb. See Appendix C for more information. D. Groundwater Groundwater is an issue in this area of the City. We have bene monitoring the groundwater in 3 recently placed monitoring wells to determine the depth. Monitoring well #1 is located where the proposed underground stormwater basin will be located. Between 4/30 and 5/20 4 measurement shave been taken and the results are shown in Appendix E. To date, the measured groundwater depth in the monitoring well located in the proposed basin is 4723.8f. The bottom of the proposed basin is retention 4724.25. Once the water and mains are installed adjacent to the stormtech system the ground water will drop which is historical observed. • Finish Grade Asphalt 4729.25 • Bottom of 18" pavement section 4727.75 • Top of infiltrators(6" gravel layer) 4727.25 • Bottom of infiltrator(30") 4724.75 • Bottom of porous stone (6") 4724.25 Appendices A. Sheet SDI.0 (Drainage Area map) B. Stormwater calculations C. Area Drain grate sizing D. Stormwater Maintenance Plan E. Groundwater Monitoring Results Flanders Mill Apartments Master Site Plan Stormwater Design Report Page 2 of 2 Appendices Appendix A — Sheet SD 1.0 SUMMARY TABLE COLOR DRAINAGE CURB INLET OR 25-YR PEAK AREA AREA DRAIN FLOW (CF) _ 1 CURB INLET 1.0 2 AREA DRAIN 9.3 OVERFLOW \ MANHOLE R A av CURB INLET AND 15" PVC AREA DRAIN AND 22"X13"ARCH RCP / UNDERGROUND R TANK SYSTEM -� t �o t f JI L _ I, ' - w SHEET SD1.0 FLANDERS MILL APARTMENTS MADISON ENGINEERING STORM WATER DRAINAGE EXHIBIT 995 TECHNOLOGY BLVDSUITE203 DRAINAGE AREA DELINEATION BO(406)N&.0252 16 (1061586-0262 w¢1r rx 01•rY Yr qt BOZENIAN,NIT no�:r ao®e ®aim ae w Appendix B — Stormwater Calculations Flanders MITI Apartments Lot 1 Block 25 Phase 7 Flanders Mill Sub. Stormwater Detention/Retention Calculations Calculation of Required Volume for Storm Detention Pond (Reference: Bozeman Stormwater Master Plan-1982) Design Rainfall Freq. 10 year(see page III-5 of master plan) IDF coefficient a 0.64 IDF coefficient b IDF coefficient n 0.65 Pre-development Calculations Post-development Calculations C C Areas(ft): open space 397,970 0.20 Areas(ft): Landscaped 133.627 0.20 med.res. 0.35 Impervious 163.804 0.90 dense res. 0.50 Building 100.539 0.90 Total: 357 9 00 Total: 397,970 total area: 9.14 acres total area: 9.14 acres composite C: 0.20 composite C: 0.66 Overland tc Overland t. average slope: 1 25 percent average slope: 125 percent travel distance: 950 feet travel distance: 900 feet tc: 48 minutes tc: 23 minutes Total tc: 48 minutes Total k: 23 minutes intensity at tc(fig 23): 0.74 in/hr intensity at t�(fig 23): 1.21 in/hr pre-devel peak runoff. 1.35 cfs post-devel peak runoff: 7.32 cfs Storm Duration Intensity Future Runoff Runoff Release Required (minutes) (in/hr) Rate(cfs) Volume(cf) Volume(cf) Storage(cf) 23 1.21 7.32 9954 1834 8120 25 1.14 6.93 10253 1996 8257 27 1.08 6.59 10537 2158 8379 29 1.03 6.29 10807 2320 8488 31 0.99 6.02 11065 2482 8584 33 0.95 5.77 11313 2643 8670 35 0.91 5.55 11551 2805 8745 37 0.88 5.36 11780 2967 8813 39 0.85 5.17 12001 3129 8872 41 0.82 5.01 12215 3291 8924 43 0.80 4.85 12422 3453 8969 45 0.78 4.71 12623 3615 9008 47 0.75 4.58 12818 3777 9041 49 0.73 4.46 13007 3939 9069 51 0.71 4.34 13192 4101 9091 53 0.70 4.23 13372 4262 9110 55 0.68 4.13 13548 4424 9123 57 0.66 4.04 13719 4586 9133 59 0.65 3.95 13887 4748 9139 61 0.64 3.86 14051 4910 9141 63 0.62 3.78 14211 5072 9139 65 0.61 3.70 14368 5234 9134 required detention storage(ft') 0.5"Rainfall Required Retention Calculations Impervious Area Pavement&Sidewalks 163.804 sf Buildings 100.539 sf Total Impervious 264,343 sf Rainfall 0.5 inches 0.042 ft Volume to be Retained 11,014 cf Detention pond-ADS System.xls Project: Flanders Mill Apartments ` Chamber Model- SC-740 StormTecfl Units- Imperial I Chck Here ror Metric A division of IIItr1(f►/' �� tunvrl.Jtt7. Number of chambers- 126 Voids in the stone (porosity)- 40 % Base of Stone Elevation- 10&00 ft Amount of Stone Above Chambers- 6 in O Include Perhnetet Stone in Calculations Amount of Stone Below Chambers- 6 in Area of system- 4716 sf Min.Area- 4259 sf min. area StormTech SC-740 Cumulative Storage Volumes Height of Incremental Single Incremental Incremental Incremental Ch Cumulative System Chamber Total Chamber Stone & St Chamber Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (feet) 42 0.00 0.00 157.20 157.20 10076 28 103.50 41 0.00 0.00 157.20 157.20 9919.08 103.42 40 0.00 0.00 157.20 157.20 9761.88 103.33 39 0.00 0.00 157.20 157.20 9604.68 103.25 38 0.00 0.00 157.20 157.20 9447.48 103.17 37 0.00 0.00 157.20 157.20 9290.28 103.08 36 0.05 6.93 154.43 161.36 9133.08 103.00 35 0.16 20.53 148.99 169.52 8971.73 102.92 34 0.28 35.52 142.99 178.51 8802.21 102.83 33 0.60 76.10 126.76 202.86 8623.69 102.75 32 0.80 101.02 116.79 217.81 8420.83 102.67 31 0.95 119.78 109.29 229.07 8203.03 102.58 30 1.07 135.39 103.04 238.43 7973.95 102.50 29 1.18 148.74 97.70 246.45 7735.52 102.42 28 1.27 159.47 93.41 252.88 7489.08 102.33 27 1.36 170.73 88.91 259.64 7236.19 102.25 26 1.45 183.22 83.91 267.13 6976.55 102.17 25 1.52 192.12 80.35 272.47 6709.42 102.08 24 1.58 199.37 77.45 276.82 6436.95 102.00 23 1.64 206.93 74.43 281.36 6160.13 101.92 22 1.70 214.14 71.54 285.68 5878.77 101.83 21 1.75 220.87 68.85 289.72 5593.09 101.75 20 1.80 227.15 66.34 293.49 5303.37 101.67 19 1.85 233.73 63.71 297.44 5009.88 101.58 18 1.89 238.53 61.79 300.32 4712.44 101.50 17 1.93 243.68 59.73 303.41 4412.12 101.42 16 1.97 248.85 57.66 306.51 4108.71 101.33 15 2.01 253.25 55.90 309.15 3802.20 101.25 14 2.04 257.67 54.13 311.80 3493.05 101.17 13 2.07 261.45 52.62 314.07 3181.25 101.08 12 2.10 265.22 51.11 316.33 2867.18 101.00 11 2.13 268.61 49.76 318.36 2550.85 100.92 10 2.15 271.39 48.65 320.03 2232.49 100.83 9 2.18 274.31 47.48 321.79 1912.46 100.75 8 2.20 276.99 46.40 323.40 1590.67 100.67 7 2.21 278.12 45.95 324.07 1267.27 100.58 6 0.00 0.00 157.20 157.20 943.20 100.50 5 0.00 0.00 157.20 157.20 786.00 100.42 4 0.00 0.00 157.20 157.20 628.80 100.33 Flanders Mill Apartments,Lot 1,Block 25 Appendix B Peak flow calculations Curb inlet Drainage Areas-Post Development See SD1.0 for visual reference Peak Flow Summary(cfs) Drainage Area No. Area(Ac.) Weighted C 100 Yr 25 Yr 10 Yr 1 8.657 0.66 15.4 9.3 6.9 2 0.479 0.66 1.8 1.0 0.8 OF Equations from Bozeman Stormwater Master Plan for City of Bozeman,March 1982 General Equation: i=a/(b+D)"where D is duration in hours,i=intensity in inches/hour Storm Information Design Rainfall Freq. 100 25 10 OF coefficient a 1.01 0.78 0.64 OF coefficient b 0 0 0 OF coefficient n 0.67 0.64 0.65 Adjustment Factor Cf: 1.25 1.1 1 Weighted C Value-Entire site Landscaped 133.627 0.20 Impervious 163.804 0.90 Building 100.539 0.90 397,970 Composite C 0.66 Peak Q values Drainage Area 1 Area 8.66 acres Weighted C 0.66 Average slope 1.25 percent Travel Distance 900 feet Design Rainfall Freq. 100 25 10 years C*Cf 0.83 0.73 0.66 (Shall not exceed 1.00) Total t�: 14.00 19.19 22.66 minutes intensity at tc 2.68 1.62 1.21 in/hr peak runoff: 15.4 9.3 6.9 cfs Drainage Area 2 Total 0.479 acres Weighted C 0.66 Average slope 1.00 percent Travel Distance 89 feet Design Rainfall Freq. 100 25 10 years C*Cf 0.83 0.73 0.66 (Shall not exceed 1.00) Total t�: 4.74 6.50 7.67 minutes intensity at t. 5.53 3.23 2.44 in/hr peak runoff: 1.8 1.0 0.8 cfs Page 1 of 7 151.PVC Appendix B Checked at slope=0.36% CIRCULAR CHANNEL T Manning's Eqn. Q=1.486 A RzJ S'n n Diameter,do(in)= 15 4-Enter Value Diameter,do(ft)= 1.25 THETA Units= 1.486 n= 0.013 Slope,S(ft/ft) 0.0036 Wetted Hydraulic Hydraulic Sertion tnergy, Area,A Perimeter,P Radius,R Top Width,T Depth,D Factor,Z Q(gpd.8 =V2/2g Depth,y(ft) Theta(red) (ft) (ft) (ft) 00 (ft) (it') Q(cis) Q(gpm) hour day) V(ft/s) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.06 0.90 0.02 0.56 0.04 0.54 0.04 0.00 0.0 8.4 4009.5 0.8 0.01 0.13 1.29 0.06 0.80 0.08 0.75 0.09 0.02 0.1 36.3 17432.1 1.3 0.02 0.19 1.59 0.12 0.99 0.12 0.89 0.13 0.04 0.2 84.6 40586.7 1.6 0.04 0.25 1.85 0.17 1.16 0.15 1.00 0.17 0.07 0.3 152.3 73118.3 1.9 0.06 0.31 2.09 0.24 1.31 0.18 1.08 0.22 0.11 0.5 238,3 114373.9 2.2 0.08 0.38 2.32 0.31 1.45 0.21 1.15 0.27 0.16 0.6 340.6 163510.6 2.5 0.09 0." 2.53 0.38 1.58 0.24 1.19 0.32 0.22 1.0 457.4 219543.4 2.7 0.11 0.60 2.74 0.46 1.71 0.27 1.22 0.37 0.28 1.3 586.2 281370.3 2.8 0.13 0.56 2.94 0.54 1.84 0.29 1.24 0.43 0.35 1.6 724.6 347784.3 3.0 0.14 0.63 3.14 0.61 1.96 0.31 1.25 0.49 0.43 1.9 869.7 417478.4 3.2 0.15 0.69 3.34 0.69 2.09 0.33 1.24 0.56 0.52 2.3 1018.8 489043.4 3.3 0.17 0.75 3.54 0.77 2.22 0.36 1.22 0.63 0.61 2.6 1168.7 560957.6 3.4 0.18 0.81 3.75 0.84 2.34 0.36 1.19 0.71 0.71 2.9 1315.8 631568.4 3.5 0.19 0.88 3.96 0.92 2.48 0.37 1.15 0.80 0.82 3.2 1456.4 699057.3 3.5 0.19 0.94 4.19 0.99 2.62 0.38 1.08 0.91 0.94 3.5 1586.2 761378.5 3.6 0.20 1.00 4.43 1.05 2.77 0.36 1.00 1.05 1.08 3.8 1700.3 816142.7 3.6 0.20 1.06 4.69 1.11 2.93 0.38 0.89 1.25 1.24 4.0 1792.4 860373.3 3.6 0.20 1.13 5.00 1.16 3.12 0.37 0.75 1.55 1.45 4.1 1853.9 889894.8 3.6 0.20 1.19 5.38 1.20 3.36 0.36 0.64 2.21 1.79 4.2 1869.1 897173.3 3.5 0.19 1.25 6.28 1.23 3.93 0.31 O,On 3,9 1740.1 835239.2 3.2 0.16 4.5 4.0 3.5 30 0(CFS) 2.5 / I ♦ -E(ft) 2.0 / ♦ 1.5 ♦ 05 - 00 0.00 020 0.40 060 080 1.00 1 20 1.40 Depth(ft) 18"PVC/concrete Appendix B Checked at slope 0.7% CIRCULAR CHANNEL T Manning's Eqn. Q= 1.486 A Rw S112 n Diameter,do(in)= 18 44-Enter Value Diameter,do(ft)= 1.5 THETA Units= 1.486 n= 0.013 Slope,S(ft/ft) 0.007 Wetted Hydraulic 'Section triergy, Area,A Perimeter,P Radius,R Top Width,T Hydraulic Factor,Z Q(gpd-8 =V2/2g Depth,y(ft) Theta(red) (ft') (ft) (ft) (ft) Depth,D(ft) (ft 512) Q(cfs) Q(gpm) hour day) V(ft/s) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.08 0.90 0.03 0.66 0.05 0.65 0.05 0.01 0.0 16.9 9091.7 1.3 0.03 0.15 1.29 0.09 0.97 0.10 0.90 0.10 0.03 0.2 82.3 39527.3 2.0 0.06 0.23 1.59 0.17 1.19 0.14 1.07 0.16 0.07 0.4 191.7 92030.5 2.6 0.10 0.30 1.85 0.25 1.39 0.18 1.20 0.21 0.12 0.8 345.4 165795.9 3.1 0.15 0.38 2.09 0.35 1.57 0.22 1.30 0.27 0.18 1.2 540.3 259343.1 3.5 0.19 0.45 2.32 0.45 1.74 0.26 1.37 0.32 0.25 1.7 772.4 370760.7 3.9 0.23 0.53 2.53 0.55 1.90 0.29 1.43 0.39 0.34 2.3 1037.1 4978115.3 4.2 0.27 0.60 2.74 0.66 2.05 0.32 1.47 0.45 0.44 3.0 1329.2 6360077 4.5 0.31 0.68 2.94 0.77 2.21 0.35 1.49 0.52 0.55 3.7 1642.9 788601.6 4.7 0.35 0.75 3.14 0.88 2.36 0.38 1.50 0.59 0.66 4.4 1972.2 946633.4 5.0 0.38 0.83 3.34 1.00 2.51 0.40 1.49 0.67 0.81 5.1 2310.2 1108907.0 5.2 0.41 0.90 3.64 1.11 2.66 0.42 1.47 0.75 0.96 5.9 2649.9 1271972.7 5.3 0.44 0.98 3.75 1.22 2.81 0.43 1.43 0.85 1.12 6.6 2983.5 1432082.9 5.5 0.46 1.05 3.96 1.32 2.97 0.44 1.37 0.96 1.30 7.4 3302.3 1585114.2 5.6 0.48 1.13 4.19 1.42 3.14 0.45 1.30 1.09 1.49 8.0 3596.7 1726427.7 5.6 0.49 1.20 4.43 1.52 3.32 0.46 1.20 1.26 1.70 8.6 3855.4 1850605.5 5.7 0.50 1.28 4.69 1.60 3.52 0.45 1.07 1.49 1.96 r!9A 4064.4 1950898.6 5.7 0.50 1.35 5.00 1.68 3.75 0.45 0.90 1.86 2.29 4203.8 2017838.7 5.6 0.49 1.43 5.38 1.73 4.04 0.43 0.65 2.65 2.82 4238.2 20343427 5.4 0.46 1.50 6.28 1.77 4.71 0.38 0.00 3945.6 1893906.91 5.0 1 0.38 10.0 9.0 8.0 7.0 �- i lCFS) 6.0 I � V(Ms) 5.0 � -E(ft) 4.0 I 3.0 000, ' i 2.0 1000, 1.0 0.0 0.00 0.20 0.40 0.60 080 1.00 1.20 1.40 1.60 Depth(ft) 1/27/2020 concretesipe_sizes I SD&W ARCH PIPES: Pipc Size (in.) Round Equiv. Metric Equivalent(mm) Area(I'tQ) Weight(lbs/t't) Wall Thickness 18x11 15 460x280 1.1 188 IF 3 22x 13 18 560x245 1.6 233 3 1/8 29x18 24 725x460 2.9 325 j 3'/2 36x23 30 920x570 4.4 392 j 3'/z 44x27 36 1110x675 6.5 537 4 51x31 42 1300x795 8.7 696 4%Z 58x36 48 1485x915 11.4 885 5 65x40 54 1650x1015 14.3 1,079 5'/Z 73x45 60 1855x1145 17.7 1,333 6 88x54 72 2235xl370 25.6j 1,856 j 7 www.sd-w.com/channel—fiDw/concrete_pipe—sizes/ 1/1 Appendix C — Area Drain Grate Sizing ■ Note:Whan specifying/ordering grates,refer to"Choosing the Proper Inlot Grate"on pages 125-126. For a complete listing of FREE OPEN AREAS and WEIR PERIMETERS of all NEENAH grates,referto pages 327-332. R•4370 Series Round Drainage Grate Heavy Duty A WEIR SO. PERIMETER �� m CATALOG ORATE FT. LINEAL NUMBER TYPE OPEN FEET R4T101 C D.1 1.7 R431(1-2 G U 25 Ri910.3 _ E CA 99 RAI3744 G CA 39 PAR 011MV.1 na370-5 G u 4.7 R-4310.8 G 01B 5.1 R471&7 G 1)1 52 g7ustrating R-4370.12 R—M&B 12 55 R4310-9 13 5B 11431610 A 1.1 52 R-r310-12 r 09 sB 11-M13 G J3— 5B R-4310,15 D ID 53 R-1370.17 D ID BD R-4370.18 E IS 8D R431a21 D 1)9 An R471D92 D 1.1 BD R4910.23 H 0.9 63 R-4310.25 6 112 73 R437&28 G 23 as R-WQ-27A G 24 as MDst grates listed can be furnished with cast iron angleframe when specked. Frame is of 112"metal Dimensions in inches Catalog No. A a G H Type R-4370.1 G 3/8 1 1/4 1 x 1 1/2 C R-4370-2 9 1/2 2 112 1 112 x 3112 5/8 G R-4370-3 15 1 1/4 1 x 121/4 1 E R-4370.4 15 1 1/4 3/4 x 21/4 3/4 G R-4370.5 18 1 112 4 x Fj 11 1 114 G 1 FOo4wva _ R-4370•6' 19 111 1 1/'J 3/4 x 5 1/4 319 G R-4370.7 20 1 3/3 2 x 2 1 G R-4370-8 21 1 1/4 3/4 x 19 112 3/4 E aQ. R-4370-9 22 11/2 11/4 1 C R-4370-10 22 1 1/2 1 1/4 I §A R-4370.12 22 1 1/2 1 3/8 x 5 1 F R-4370.13` 22 1 112 2 x 6 1 114 G R-4370-15" 22 1/2 1 3/4 1 1/11 1 D R-4370-17 22 3/4 1 3/4 1 112 1 D R-4370.18 22 3/4 1 3/4 1 1/2 718 E R-4370.21 23 1 1/2 1 1/4 1 D R-4370-22"" 23 1 3/4 1 1 116 D R-4370-23 24 1 112 2 1/4 x 2 114 1 112 H R-4370.25 29 3 3/4 1 G R-4370-26 33 2 1 112 1 G R-4370-27A 38 1112 1 1 G Light Duty. ••Frame not available. §Alternate Type 6 or Type C grates available. Alternate Type G grate available. 1 NEENAH FOUNDRY CLICK HERE to return to the Table of Contents 0 r ,10 I I °o cC it - _ 41 ! a° IL 'C - o � a177 - -- - - -- -— —j - - - — - 0r I 4—F aCL S p JL co - --- - -- — - ( s • —! -- i g�'16 8n 3 —{— — - - - - - - Z 8 cc O W� ;-- o Z LL 0 0 0 0 0 0 0 0 T O 0 N N 0 O O � O f F E src`N� (SIO) o4ou mou lolul GIRJE) Appendix D — Stormwater Maintenance Plan STORMWATER MAINTENANCE PLAN Flanders Mill Apartments Owner's responsibility for routine inspection and maintenance 1. Keep the inlets of the facilities free of leaves, rocks, and other debris. 2. Re-sod damaged or maintained areas immediately, or use grass plugs from the adjacent up-slope area. 3. See that litter and other debris are removed from inlets, swales, and vegetated and paved areas. 4. Maintenance of the underground systems are as follows: • Minimum required maintenance includes a quarterly inspection during the first year of operation and a yearly inspection thereafter. Utilize inspection ports for inspections. • The inspection ports can be used to pump water into the system and re- suspend accumulated sediment so that is may be pumped out. Flush and pump as inspections deem necessary. • Utilize the adjacent upstream storm sewer manhole for removal (vacuuming) of debris from the end of the storm drain at the connection point with the underground chamber. 5. Owner to maintain and fund Operation and Maintenance of stormwater facilities. Jesse Chase, Owner G:\MADISON ENGINEERING\PROJECTS\2017\17-128 Flanders Mill\Storm\STORMWATER MAINTENANCE PLAN.doc StormTeche Detention oRecharge Subsurface • .•- ��� `; yam,• 1'. i •, - r.. i Isolator"' Row k Y... y. ♦ M Manual •rmTech' Chamber System for • Management 1.0 The Is olatorT" Row 1.1 INTRODUCTION The Isolator Row is typically designed to capture the An important component of any Stormwater Pollution "first flush" and offers the versatility to be sized on a vol- Prevention Plan is inspection and maintenance.The ume basis or flow rate basis.An upstream manhole not StormTech Isolator Row is a patent pending technique only provides access to the Isolator Row but typically to inexpensively enhance Total Suspended Solids (TSS) includes a high flow weir such that storm water flowrates removal and provide easy access for inspection and or volumes that exceed the capacity of the Isolator Row maintenance. overtop the over flow weir and discharge through a manifold to the other chambers. The Isolator Row may also be part of a treatment train. By treating storm water prior to entry into the chamber system, the service life can be extended and pollutants such as hydrocarbons can be captured. Pre-treatment best management practices can be as simple as deep sump catch basins,oil-water separators or can be inno- vative storm water treatment devices.The design of the treatment train and selection of pretreatment devices by the design engineer is often driven by regulatory requirements.Whether pretreatment is used or not,the Isolator Row is recommended by StormTech as an effective means to minimize maintenance requirements and maintenance costs. Note:See the StormTech Design Manual for detailed Looking down the Isolator Row from the manhole opening,woven information on designing inlets for a StormTech system, geotextile is shown between the chamber and stone base. including the Isolator Row. 1.2 THE ISOLATOR'ROW StormTech Isolator Row with Overflow Spillway The Isolator Row is a row of StormTech chambers,either (not to scale) SC-740 or SC-310 models,that is surrounded with filter OPTIONAL fabric and connected to a closely located manhole for PRE-TREATMENT easy access.The fabric-wrapped chambers provide for settling and filtration of sediment as storm water rises in STORMTECH the Isolator Row and ultimately passes through the filter ISOLATOR ROW fabric.The open bottom chambers and perforated side- walls allow storm water to flow both vertically and horizon- tally out of the chambers. Sediments are captured in the Isolator Row protecting the storage areas of the adja- MANHOLE cent stone and chambers from sediment accumulation. OVERFLOW WEIR Two different fabrics are used for the Isolator Row.A woven geotextile fabric is placed between the stone and the Isolator Row chambers.The tough geotextile provides a media for storm water filtration and provides ECCENTRIC a durable surface for maintenance operations. It is also HEADER designed to prevent scour of the underlying stone and remain intact during high pressure jetting.A non-woven fabric is placed over the chambers to provide a filter media for flows passing through the perforations in the sidewall of the chamber. OPTIONAL ACCESS STORMTECH CHAMBERS 2 Call StormTech at 888.892.2694 or visit our website at www.stormtech.com for technical and product information. 2.0 Isolator Row Ins pection/Maintenance StormTech" 2.1 INSPECTION The frequency of Inspection and Maintenance varies - by location.A routine inspection schedule needs to be established for each individual location based upon site - f specific variables. The type of land use (i.e. industrial, commercial residential),anticipated pollutant load, per- cent imperviousness, climate,etc. all play a critical role in determining the actual frequency of inspection and maintenance practices. At a minimum, StormTech recommends annual inspec- tions. Initially, the Isolator Row should be inspected every 6 months for the first year of operation. For subsequent years,the inspection should be adjusted based upon previous observation of sediment deposition. The Isolator Row incorporates a combination of standard manhole(s)and strategically located inspection ports (as needed).The inspection ports allow for easy access Examples of culvert cleaning nozzles appropriate for Isolator Row to the system from the surface,eliminating the need to maintenance.(These are not StormTech products.) perform a confined space entry for inspection purposes. Maintenance is accomplished with the JetVac process. If upon visual inspection it is found that sediment has The JetVac process utilizes a high pressure water noz- accumulated,a stadia rod should be inserted to deter- zle to propel itself down the Isolator Row while scouring mine the depth of sediment. When the average depth and suspending sediments.As the nozzle is retrieved, of sediment exceeds 3 inches throughout the length of the captured pollutants are flushed back into the man- the Isolator Row, clean-out should be performed. hole for vacuuming. Most sewer and pipe maintenance companies have vacuum/JetVac combination vehicles. 2.2 MAINTMANCE Selection of an appropriate JetVac nozzle will improve The Isolator Row was designed to reduce the cost of maintenance efficiency. Fixed nozzles designed for cul- periodic maintenance. By"isolating" sediments to just verts or large diameter pipe cleaning are preferable. one row, costs are dramatically reduced by eliminating Rear facing jets with an effective spread of at least 45" the need to clean out each row of the entire storage are best. Most JetVac reels have 400 feet of hose allow- bed. If inspection indicates the potential need for main- ing maintenance of an Isolator Row up to 50 chambers tenance, access is provided via a manhole(s)located long.The JetVac process shall only be performed on on the end(s)of the row for cleanout. If entry into the StormTech Isolator Rows that have AASHTO class 1 manhole is required, please follow local and OSHA rules woven geotextile(as specified by StormTech)over for a confined space entries. their angular base stone. StormTech Isolator Row(not to scale) COVER ENTIRE ROW WITH AASHTO M288 1 2"MIN ID 25"MAX OD PIPE INSPECTION PORT- CLASS 2 NON-WOVEN GEOTEXTILE SET 1.5"FROM BOTTOM LOCATION PER SC-740—B'WIDE STRIP _STORM TECH OF CHAMBER ENGINEER'S DRAWING SC-310—T WIDE STRIP f ENDCAP CATCH BASIN OR ANHIO ,4,i� ,y5 V. vp I - 6"1....... 2FT MIN. _ I IF r SU P - WOVEN GEOTEXTILE THAT MEETS AASHTO M288 CLASS 1 REQUIREMENTS,BETWEEN STONE BASE AND CHAMBERS SC-740-5'-6'WIDE STRIP SC-310-4'WIDE STRIP Call StormTech at 888.892.2694 or visit our website at www.stormtech.com for technical and product information. 3 3 .0 Isolator Row Step By Step Maintenance Procedures Step 1) Inspect Isolator Row for sediment StormTech Isolator Row(not to scale) A)Inspection ports(if present) 11 ej- AI i. Remove lid from floor box frame �2 ;�) ii. Remove cap from inspection riser iii. Using a flashlight and stadia rod, measure depth of sediment and J1 record results on maintenance log. iv. If sediment is at, or above, 3 inch depth proceed to Step 2. If not 4 proceed to step 3. B)All Isolator Rows i. Remove cover from manhole at upstream end of Isolator Row ii. Using a flashlight, inspect down Isolator Row through outlet pipe 1.Mirrors on poles or cameras may be used to avoid a confined space entry 2.Follow OSHA regulations for confined space entry if entering manhole iii. If sediment is at or above the lower row of sidewall holes(approximately 3 inches)proceed to Step 2. If not proceed to Step 3. Step 2)Clean out Isolator Row using the JetVac process A)A fixed culvert cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable B)Apply multiple passes of JetVac until backflush water is clean C)Vacuum manhole sump as required Step 3)Replace all caps,lids and covers, record observations and actions Step 4)Inspect&clean catch basins and manholes upstream of the StormTech system Sample Maintenance Log •.. Sediment . .. point Depth Observations!Actions Inspectoi to ch Otto 131/b/O 1 6.3 ft. none New inst allat ion.Bed pant is Cl frame at grade dim 24/01 62 0.1ft. Some grit felt sm 6/20/03 5.8 0.5 ft. Micky fed,debris visible in manhole and in ry Isolator rook maintenance due 717103 6.3ft. 0 System jet tad and%ecuned djm 0 StormIT:eCcft" Detention•Retention•Recharge Subsurface Stormwater Management' 20 Beaver Road,Suite 104 Wethersfield Connecticut 06109 860.529.8188 888.892.2694 fax 866.328.8401 www.stormtech.com StormTech products are covered by one or more of the following patents: U.S.Patents:5,401,459;5,511,903;5,716,163;5.588,778;5,839,844; Canadian Patents:2,158,418 Other U.S.and Foreign Patents Pendinfrinted in U.S.A. 0 Copyright.All rights reserved.StormTech LLC,2004 S090104-1 Appendix E - Groundwater Monitoring 3 0o M M N O N O N � kn 00 110 �10 N 3 M O� M O C7 N r- r- O N k b N kn N O N �,6 tt� 3 M M 01 M rn N 0000 O 'n O N N �,O �,O V1 O M O` O C7 N N M O N O M y O N O � > M 't N cd N N 00 M l- E+ Lij N M M on p � N O. C fi a •° "q 0000 O O > oM M 06 H on ° N M F3 O