Loading...
HomeMy WebLinkAboutStormwater Report and Calculations 02-04-20 STORMWATER MANAGEMENT DESIGN REPORT FOR: FLANDERS MILL APARTMENTS LOT 1, BLOCK 25 FLANDERS MILL SUBDIVISION BOZEMAN, MT Prepared By: MADISON ENGINEERING Madison Engineering 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 JANUARY 2020 STORMWATER MANAGEMENT DESIGN REPORT FOR: FLANDERS MILL APARTMENTS LOT I , BLOCK 25 FLANDERS MILL SUBDIVISION BOZEMAN, MT Madison Engineering 895 Technology Blvd Ste 203 Bozeman, MT 59718 (406) 586-0262 JANUARY 2020 FLANDERS MILL APARTMENTS MASTER SITE PLAN LOT 1, BLOCK 25, FLANDERS MILL SUBDIVISION STORMWATER DESIGN REPORT This design report will give an overview of the proposed stormwater system for the Flanders Mill Apartments Master Site Plan located in Lot 1, Block 25 of Flanders Mill Subdivision, Bozeman, Montana. The project site is broken into three phases of development. The water, storm and sanitary infrastructure will be installed entirely during Phase 1 along with associated parking lot improvements and buildings in Phase 1. Phases 2 and 3 will consist of associated parking lot improvements and buildings in those areas. The first phase is located at the north end of the site, which is the lowest in elevation. The stormwater collection system for the entire project consists of two inlets that surface drain all three development phases to an underground R Tank retention system. The two inlets and retention system are located in Phase 1. This simplifies the stormwater design considerations for the phased development because new pavement and buildings constructed during later phases will simply contribute to the existing system installed during Phase 1 which has been sized for the entire three phases of development. Two post development drainage areas were created within the project. Runoff from Drainage Areas 1 and 2 will be contained on site in Retention Facility 1. This retention facility will be comprised of 1,755 Single +Mini R Tank HD modules located under a portion of the parking lot in the northwest corner of the site. The system will be equipped with an overflow manhole that drains into an existing curb inlet in Harvest Parkway. In the event that the system is full it will- backflow the incoming drainage pipe and fill the overflow manhole and be released into the existing subdivision infrastructure. The following references were used in the preparation of this report: a. COB Design Standards and Specifications Policy, 2004. Addendum #6 b. COB Modifications to Montana Public Works Standard Specifications (MPWSS) A. Stormwater Infrastructure Calculations The project area was divided into drainage areas as shown on Sheet SD1.0 in Appendix A. These drainage areas were used to determine the stormwater runoff flows, which in turn were used to determine the required underground retention volume and storm drain pipe sizes. Calculations are found in Appendix B. The underground system was designed to detain the stormwater runoff from the 10-year storm event or the first 0.5 inch of rainfall over parking impervious surfaces, whichever is greater. It was determined that the first half inch of runoff was greater than the required detention volume, so the half inch runoff volume governed the design. B. Storm Drain Piping The proposed storm drains that carry runoff into the underground retention system were sized to carry the 25-year storm event peak runoff flow. It was determined that an arch reinforced Flanders Mill Apartments Master Site Plan Stonnwater Design Report Page 1 of 2 concrete pipe (RCP) 22 inches wide x 13 inches tall would suffice for Drainage Area 1 and a 15- inch diameter PVC storm drain pipe is sufficient to carry the flows from Drainage Area 2. Calculations are found in Appendix B. C. Area Drain grate sizing The area drain that receives runoff from the majority of the site was checked for capacity. Assuming a water depth above the grate of 0.6 feet, the capacity of the selected 33-inch diameter grate is 10.4 cfs, which exceeds the 25-year storm runoff tributary to that point of 9.3 cfs. With a depth of 0.6 feet above the grate, the water surface elevation at the adjacent curb is kept below 0.15 feet below top back of curb. See Appendix C for more information. Appendices A. Sheet SD1.0 (Drainage Area map) B. Stormwater calculations C. Area Drain grate sizing D. Stormwater Maintenance Plan Flanders Mill Apartments Master Site Plan Stonnwater Design Report Page 2 of 2 Appendices Appendix A — Sheet SD 1.0 Appendix B — Stormwater Calculations O m U U W � ry. .p4 .\i u Z m O 11 vLq a &c w 1 0 ¢ rc w o ¢ a o Ln LL_ N H O W 0� z T N LaiJ � m W ss..�,� � Q U Q p a M, SS..B M 8 - �. 1 ® V W .a d w DO CD Q w QP ILK Q � po d � 0-1 Z + CID ~ I ♦4 �� arte�• I� / ♦�E . _ . a t � r I I { A � � � r Q °° W Q X _J i W - z LC) CN T S Q w � C) N r 99Bi V _ S .72 - r - - - - �✓ Z LLJ logo V) 3 ' LLJW Q z _ o o p L + ++T+ + + + + + + + + + + i + + + + + + + + -+ + + + + + + W � ` + + + + + + + + + + + + + + + + + + + + + + + + + t_ + ♦ + + + + O S3a7e + + +QVC20 - + + + + + + + + + + + + + + + + + t J O + + + r yT+ + 1J oc 9E20L +�4 + + + + r + ♦ + ♦ + + + + + + �• ',387tl E9U0 +- + + + + + + LL = + N3W37NtlNN3 +- �_ r + + + + } } } + + + + + + + + 13 OS EL66E z - F + + + + I-7Mi + -7 i - + + + + ♦ + + + + + + + + + 1N3H37NVHN3 ++++ +;+t++}++ W it + + + + - + + + + + + + + +++ + + 1+ T + + ,� e51to'zzy - S387tl OSE10 ` / 13 D., Gr6{C + + - �-y 13 OS LS08 / 83JJ09 QNdldn N 011tl38D / / - / /' / [-lit - ♦/- / _L_1 _ _. . . .— •`'aN�'--�i--�',wo--�iarr w.7--•v+r dFJ �- !1�`�.�-•�a• � /! ', / / `�,dr w:.,--. .'...=-- L - —�`-.��d�--1u . _ TELE T.E UG-TELE 06-1[ —U.- LE—L G-r,E _U.-IUE — ��-rf.E- —IfG�ILLi U Ur - �11r..- � l.f is Flanders Mill Apartments Lot 1 Block 25 Phase 7 Flanders Mill Sub. Stormwater Detention/Retention Calculations Calculation of Required Volume for Storm Detention Pond (Reference: Bozeman Stormwater Master Plan-1982) Design Rainfall Freq. ' , ear see page III-5 of master Ian IDF coefficient a 0.64 IN coefficient b IDF coefficient n 0.65 Pre-development Calculations Post-development Calculations C C Areas(ft): open space 397,970 0.20 Areas(ft): Landscaped 13 ,62i 020 med.res. 0.35 Impervious P33.604 090 dense res. _ 0.50 Building 100 539 0.90 Total: 397,970 Total: ,OT 70 total area: 9.14 acres total area: 9.14 acres composite C: 0.20 composite C: 0.66 Overland 4 Overland tc average slope: 1 25 percent average slope: 1 25 percent travel distance: nrn feet travel distance: 900 feet t�: 48 minutes te: 23 minutes Total t�: 48 minutes Total tc: 23 minutes intensity at t,(fig 23): 0.74 in/hr intensity at I.(fig 23): 1.21 in/hr pre-devel peak runoff: 1.35 cfs post-devel peak runoff: 7.32 cfs Storm Duration Intensity Future Runoff Runoff Release Required _ (minutes) (in/hr) _ Rate(cfs) Volume(cf) Volume(cf)Storage c 23 1.21 7.32 9954 1834 8120 25 1.14 6.93 10253 1996 8257 27 1.08 6.59 10537 2158 8379 29 1.03 6.29 10807 2320 8488 31 0.99 6.02 11065 2482 8584 33 0.95 5.77 11313 2643 8670 35 0.91 5.55 11551 2805 8745 37 0.88 5.36 11780 2967 8813 39 0.85 5.17 12001 3129 8872 41 0.82 5.01 12215 3291 8924 43 0.80 4.85 12422 3453 8969 45 0.78 4.71 12623 3615 9008 47 0.75 4.58 12818 3777 9041 49 0.73 4.46 13007 3939 9069 51 0.71 4.34 13192 4101 9091 53 0.70 4.23 13372 4262 9110 55 0.68 4.13 13548 4424 9123 57 0.66 4.04 13719 4586 9133 59 0.65 3.95 13887 4748 9139 61 0.64 3.86 14051 4910 9141 63 0.62 3.78 14211 5072 9139 65 0.61 3.70 14368 5234 9134 required detention storage(ft)= 9,141 Detention pond.xIs 0.5"Rainfall Required Retention Calculations Impervious Area Pavement&Sidewalks 1G3.804 sf Buildings 100.539 sf Total impervious 264,343 sf Rainfall 0.5 inches 0.042 ft Volume to be Retained 11,014 cf R-Tank HD Module Calculation feet Length 28.15 inches 2.35 feet 39 91.49 Width 15.75 inches 1.31 feet 45 59.06 Height-Single+Mini 25.98 inches 2.17 feet 5403.480469 Area Basin Area Required 5,087.4 sf Length 89.0 sf Width 57.2 sf R-Tank HD Module Reouired Actual Length 37.9 units 39 units Width 43.6 units 45 units Final Volume Provided R-Tank HD Module Height 2.17 ft Single+Mini Length 91.49 ft Width 59.06 ft Total Volume Provided 11,726 cf Exceeds both Required Detention and 0.6"rainfall Retention Volumes 0.95 11139.27499 4724.75 2.17 4726.92 Detention pond.xis Flanders Mill Apartments,Lot 1,Block 25 Appendix B Peak flow calculations Curb Inlet Drainage Areas-Post Development See-SDf.0 for vjsual rofkO6 a Peak Flow Summary(cfs) Drainage Area No. Area(Ac.) Weighted C 100 Yr 25 Yr 10 Yr 1 8.657 0.66 15.4 9.3 6.9 2 0.479 0.66 1.8 1.0 0.8 OF Equations from Bozeman Stormwater Master Plan for City of Bozeman,March 1982 General Equation: i=a/(b+D)"where D is duration in hours,i=intensity in inches/hour Storm Information Design Rainfall Freq. 100 25 10 OF coefficient a 1.01 0.78 0.64 OF coefficient b 0 0 0 IDF coefficient n 0.67 0.64 0.65 Adjustment Factor Cf. 1.25 1.1 Weighted C Value-Entire site Landscaped 133,627 0.20 Impervious 163,804 0.90 Building 100,539 0.90 397,970 Composite C 0.66 Peak Q values Drainage Area 1 Area 8.66 acres Weighted C 0.66 Average slope 1.25 percent Travel Distance 900 feet Design Rainfall Freq. 100 25 10 years C•Cf 0.83 0.73 0.66 (Shall not exceed 1.00) Total t�: 14.00 19.19 22.66 minutes intensity at tc 2.68 1.62 1.21 in/hr peak runoff: 15.4 9.3 6.9 cfs Drainage Area 2 Total 0.479 acres Weighted C 0.66 Average slope 1.00 percent Travel Distance 89 feet Design Rainfall Freq. 100 25 10 years C'Cf 0.83 0.73 0.66 (Shall not exceed 1.00) Total t,: 4.74 6.50 7.67 minutes intensity at tc 5.53 3.23 2.44 in/hr peak runoff: 1.8 1.0 0.8 cfs Page 1 of 1 18"PVC/concrete, Appendix B Checked at slope 0.7% CIRCULAR CHANNEL T Manning's Eqn. Q=1.486 A R'as1n n Dlameter,do(in)= 18 -+-Enter Value Diameter,do(ft)= 1.6 THETA Units= 1.486 n= 0.013 Slope,S(ft/ft) 0.007 Wetted Hydraulic ec ion nergy' Area,A Perimeter,P Radius,R Top Width,T Hydraulic Factor,Z Q(gpd-8 =V2129 Depth.v(ft) Theta(red) (fte) (ft) (ft) (ft) Depth,D(ft). (few) Q(cfs) Q(gpm) hour day) V(ft/s) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.08 0.90 0.03 0.68 0.05 0.66 0.06 0.01 0.0 18.9 9091.7 1.3 0.03 0.15 1.29 0.09 0.97 0.10 0.90 0.10 0.03 0,2 82.3 39527.3 2.0 0.06 0.23 1.59 0.17 1.19 0.14 1.07 0.16 0.07 0.4 191.7 92030.5 2.6 0.10 0.30 1.86 0.26 1.39 0.18 1.20 0.21 0.12 0.8 345.4 165795.9 3.1 0.16 0.38 2.09 0.35 1.67 0.22 1.30 0.27 0.18 1.2 540.3 259343.1 3.5 0.19 0.45 2.32 0.46 1.74 0.26 1.37 0.32 0.25 1.7 772.4 370760.7 3.9 0.23 0.63 2.63 0.55 1.90 0.29 1.43 0.39 0.34 2.3 1037.1 497815.3 4.2 0.27 0.60 2.74 0.66 2.05 0.32 1.47 OAS 0." 3.0 1329.2 638007.7 4.6 0.31 0.68 2.94 0.77 2.21 0.35 1.49 0.52 0.65 3.7 1642.9 788601.6 4.7 0.36 0.76 3.14 0.88 2.36 0.38 1.60 0.59 0.88 4.4 1972.2 946633.4 5.0 0.38 0.83 3.34 1.00 2.51 0.40 1 A9 0.67 0.01 6,t 2310.2 1108907.0 5.2 0.41 0.90 3.64 1.11 2.66 OA2 'I A7 0.75 0.96 69 2649.9 1271972.7 5.3 0." 0.98 3.75 1.22 2.81 OA3 1A3 0.85 1.12 6.6 2983.5 1432082.0 6.5 0.46 1.05 3.06 1.32 2.97 0." 1.37 0.96 1.30 7.4 3302.3 1585114.2 5.6 0.48 1.13 4.19 1.42 3.14 0.46 1.30 1.09 1.49 8.0 3596.7 1726427.7 6.6 OA9 1.20 4A3 1.52 3.32 0.46 1.20 1.26 1.70 8.6 3855.4 1850605.5 6.7 0.60 1.28 4.69 1.60 3.52 OAS 1.07 1.49 1.08 9.1 4064.4 1950898.6 5.7 0.60 1.35 6.00 1.68 3.76 0.46 0.90 1.86 2.29 9.a 4203.8 2017838.7 6.6 OA9 1 A3 5.38 1.73 4.04 0.43 0.66 2.65 2.82 9.4 4238.2 2034342.7 5.4 0.46 1.60 6.28 1.T7 4.71 0.30 0.00 8.8 3945 6 160906.9 6.0 0.38 10.0 9.0- ir 8.0 7.0 i i 6.0 i wpvsl 5.0 / �- / f E(ft) � 4.0 I 3.0 i 2.0 � i 1.0 0.0 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.80 Depth(ft) 151,PVC Appendix B Checked at slope=0.36% CIRCULAR CHANNEL T Manning's Eqn. Q=1.486 A RWSW n Diameter,do(In)= 15 f-Enter Value Diameter,do(ft)= 1.25 THETA Units= 1.468 n= 0.013 Slope,S(ft/ft) 0.0036 Wetted Hydraulic Hydraulic section =nrr9y. Area,A Perimeter,P Radius,R Top Width,T Depth,D Factor,Z Q(gpd-8 =V-129 Depth,y(ft) Theta(rad) (ft') (ft) (ft) (ft) (ft) (h"') Q(cfs) Q(gpm) hour day) V(file) (Iry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 o it 0 G 0.0 0.00 0.06 0:90 0.02 0.58 0." 0.54 0." 0:00 0.0 8.4 4009.5 0.8 0.01 0.13 1.29 0.06 0.80 0.08 0.75 0.09 0.02 0.1 36.3 17432.1 1.3 0.02 0.19 1.59 0.12 0.99 0.12 0.89 0.13 0.04 0.2 84.6 40586.7 1.6 0.04 0.25 1.85 0.17 1.16 0.15 1.00 0.17 0.07 0.3 152.3 73118.3 1.9 0.06 0.31 2.09 0.24 1.31 0.18 1.08 0.22 0.11 0.5 238.3 114373.9 2.2 0.06 0.38 2.32 0.31 1.45 0.21 1.15 0.27 0.16 0.8 340.6 163510.6 2.5 0.09 0." 2.53 0.38 1.58 0*24 1.19 0.32 0.22 1.0 457A 219543.4 2.7 0.11 0.50 2.74 0.46 1.71 0.27 1.22 0.37 0.28 1.3 586.2 281370.3 2.8 0.13 0.56 2.94 0." 1." 0.29 1.24 0.43 0.35 1.6 724.6 347784.3 3.0 0.14 0.63 3.14 0.61 1.98 0.31 1.26 0.49 0:43 1.9 869.7 417478.4 3.2 0.16 0.69 3.34 0.69 2.09 0.33 1.24 0.56 0:52 2.3 1018.8 489043.4 3.3 0.17 0.75 3.64 0.77 2.22 0.35 1.22 0.63 0.61 2.6 1168.7 560957.6 3.4 0.18 0.61 3.75 0.84 2.34 0.36 1.19 0.71 0.71 2.9 1315.8 631568.4 3.5 0.19 0.88 3.96 0.92 2.48 0.37 1.16 0.60 0.82 3.2 1456.4 699057.3 3.5 0.19 0." 4.19 0.99 2.62 0.38 1.08 0.91 0.94 3.5 1586.2 761378.5 3.6 0.20 1.00 4.43 1.06 2.77 0,38 1.00 1.05 1.08 3.8 1700.3 816142.7 3.6 0.20 1.06 4.69 1.11 2.93 0.38 0.89 1.26 1.24 4.0 1792.4 860373.3 3.6 0.20 1.13 5.00 1.16 3.12 0.37 0.75 1.55 1.45 4.1 1853.9 889894.8 3.6 0.20 1.19 9.38 1.20 3.36 0.36 0." 2.21 1.79 4.2 1889.1 897173.3 3.6 0.19 1,2S 6.26 1.23 3.93 0.31 DAo 3.9 17401 2 3.2 0.15 4.6 4.0 i 3.5 r _ i i f 3.0 ---.o(cFs) 2.5 -- - i �vfrthl 100,1000, i -E(ro 12.0 1.5 Oe 1.0 � i 0.5 0.0 000 026 0.40 0.60 0.80 1.00 1.20 1.40 Depth(it) 1/27/2020 concrete_pipe_sizes I SD&W ARCH PIPES: Pipe Size (in.) Round Equiv. Metric Equivalent (mm) Area(1'tQ)lI Weight (lbs/ft) NVall Thickness (in.) 18x11 7F 15 460x280 1.1 188 3 22x 13 71 18 560x245 1.6 233 3 1/8 29x18 24 725x460 2.9 325 3'/z 36x23 30 920x570 4.4 392 3`/z 44x27 36 1110x675 6.5 537 4 51x31 42 1300095 8.7 696 4'/z 58x36 48 1485x915 11.4 885 5 65x40 54 1650x 1015 14.3 1,079 5`/z 73x45 60 1855x1145 17.7 1,333 6 88x54 72 2235xl370 25.6 1,856 7 www.sd-w.com/channel—flow/conerete_pipe—sizes/ 1/1 Appendix C — Area Drain Grate Sizing ■ Note:When specifying/ordering grates,refer to"Choosing the Proper Inlet Grate"on pages 125-126. For a complete listing of FREE OPEN AREAS and WEIR PERIMETERS of all NEENAH grates,refer to pages 327-332. R-4370 Series Round Drainage Grate Heavy Duty A WEIR SO. PERIMETER m CATALOG GRATE FT. LINEAL NUMBER TYPE OPEN FEET R-4370-1 c 0.1 1.7 R437o-2 G 0.2 2.5 R-4370-3 E 04 3.9 R-4370-4 G 0.6 3.9 a EA R-4370-5 G e0 4.7 R-43766 G 0.6 5.1 R-4370-7 G fig sz Illustrating R-4370-72 R-437M E 1.9 5.5 R-4370-9 c 1.3 5.8 R-4370-10 A 1.1 59 R-4370-12 F 0.9 58 R-4370-13 G 1.3 5.8 R-4370-15 D 1.0 5.9 R-4370-17 D 1.0 6.0 R-4370-18 E 1.3 6D R-4370-21 D 0.9 6D R-4370-22 D 1 D 6 R-4370-23 H 0.9 6.3 fl-4370-25 G 1.-9 9 7.6 R-4370.26 G 2-8 BS R-4310-27A G 2.4 99 Most grates listed can be furnished with cast iron angle frame when specified. - y�� Frame is of 1/2"metal. Dimensions in inches Catalog No. A a G H Type R4370-1 63/8 1 1/4 1 x 1 1/2 C R-4370-2 91/2 21/2 i 1/2 x 31/2 5/6 G R-4370-3 15 1 1/4 1 x 121/4 1 E R-4370-4 15 1 1/4 3/4 x 21/4 3/4 G R-4370-5 18 1 1/2 1 x 41/2 1 1/4 G R-4370-6" 19 112 1 1/2 3/4 x 51/4 3/4 G R-4370-7 20 1 3/8 2 x 2 1 G TYr F wm R-4370-8 21 1 114 3/4 x 19 1/2 3/4 E ai1�r� R-4370-9 22 1 112 1 1/8 1 C dgmh R-4370-10 22 1 1/2 1 1/4 1 §A R-4370-12 22 1 1/2 1 3/8 x 5 1 F Type H R-4370-13 22 1 1/2 2 x 6 1 1/4 G R-4370-15 22 1/2 1 3/4 1 1/8_ 1 D R-4370-17 22 3/4 1 3/4 1 1/2 1 D R-4370-18 223/4 13/4 11/2 7/8 E R-4370-21 23 1 1/2 1 1/4 1 D R-4370-22 23 1 3/4 1 1 1/8 D R-4370-23 24 1 1/2 2 1/4 x 21/4 1 112 H R-4370-25 29 3 314 1 G R-4370-26 33 2 1 1/2 1 G R-4370-27A 38 1 1/2 1 1 G Light Duty. •'Frame not available. §Alternate Type G or Type C grates available. Alternate Type G grate available. I NEENAH FOUNDRY CLICK HERE to return to the Table of Contents 0 O CM CO) tH � �I � _ •- ��-._-__� .. -is--— --; � - - - -- - - -- - -- - o° o ;a -- — --- _ — -- — - -- — QCQ Zo1� ao a�a s� CL C0 V%— — LL c >•v a L O C C O N Q ao _- -•--t- —j I— �' v Y c QC c 40 --- i — ai.Qwa N n wZ -_- - _ ...—.. r — yp iw. Ve p O O � cW > O O O S O O O trPi�my LO O LO o O In O .:F N N s OwN Mo lolul 810.1E) J ' Appendix D — Stormwater Maintenance Plan STORMWATER MAINTENANCE PLAN Flanders Mill Apartments Owner's responsibility for routine inspection and maintenance 1. Keep the inlets of the facilities free of leaves, rocks, and other debris. 2. Re-sod damaged or maintained areas immediately, or use grass plugs from the adjacent up-slope area. 3 See that litter and other debris are removed Cl-om inlets, swales, and vegetated and paved areas. 4. Maintenance of the underground systems are as follows; • Minimum required maintenance includes a quarterly inspection during the first year of operation and a yearly inspection thereafter, Utilize inspection ports for inspections. • The inspection ports can be used to pump water into the system and re- suspend accumulated sediment so that is may be pumped out. Flush and pump as inspections deem necessary. • Utilize the adjacent upstream storm sewer manhole for removal (vacuuming) of debris from the end of the storm drain at the connectirnl point with the underground chamber. 5. Owner to maintain and fund Operation and Maintenance of stormwater facilities. Jesse Chase, Owner WMADISON ENGINEERING\PROJECTS\2017\17-128 Flanders Mill\Storm\STORMWATER MAINTENANCE PLAN.doc i TECHNICALER MANAGEMENT STORMW RJANK OPERATION, INSPECTION & MAINTENANCE Operation Your ACF R-Tank System has been designed to function in conjunction with the engineered drainage system on your site, the existing municipal infrastructure,and/or the existing soils and geography of the receiving watershed. Unless your site included certain unique and rare features, the operation of your R-Tank System will be driven by naturally occurring systems and will function autonomously.However,upholding a proper schedule of Inspection&Maintenance is critical to ensuring continued functionality and optimum performance of the system. Inspection Both the R-Tank and all stormwater pre-treatment features incorporated into your site must be inspected regularly. Inspection frequency for your system must be determined based on the contributing drainage area,but should never exceed one year between inspections(six months during the first year of operation). Inspections may be required more frequently for pre-treatment systems. You should refer to the manufacturer requirements for the proper inspection schedule. With the right equipmentyour inspection and measurements can be accomplished from the surface without physically entering any confined spaces.If your inspection does require confined space entry,you MUST follow all local/regional requirements as well as OSHA standards. R-Tank Systems may incorporate Inspection Ports, Maintenance Ports, and/or adjoining manholes. Each of these features are easily accessed by removing the lid at the surface. With the cover removed, a visual inspection can be performed to identify sediment deposits within the structure.Using a flashlight,ALL access points should be examined to complete a thorough inspection. Inspection Ports Usually located centrally in the R-Tank System,these perforated columns are designed to give the user a base-line sediment depth across the system floor. Maintenance Ports Usually located near the inlet and outlet connections,you'll likely find deeper deposits of heavier sediments when compared to the Inspection Ports. Manholes Most systems will include at least two manholes-one at the inlet and another at the outlet. There may be more than one location where stormwater enters the system,which would result in additional manholes to inspect. Bear in mind that these manholes often include a sump below the invert of the pipe connecting to the R-Tank. These sumps are designed to capture sediment before it reaches the R-Tank,and they should be kept clean to ensure they function properly. However,existence of sediment in the sump does NOT necessarily mean sediment has accumulated in the R-Tank. After inspecting the bottom of the structure, use a mirror on a pole(or some other device)to check for sediment or debris in the pipe connecting to the R-Tank. For wore informationabOLAproducts, 800.448.3636 ot ervaii at infocoacfew.corn A C �NVINONMHNTAL i : ► ► is � ► ► � ► ll : ► ► : ► If sediment or debris is observed in any of these structures,you should determine the depth of the material.This is typically accomplished with a stadia rod, but you should determine the best way to obtain the measurement. All observations and measurements should be recorded on an Inspection Log kept on file. We've included a form you can use at the end of this guideline. Maintenance The R-Tank System should be back-flushed once sediment accumulation has reached 6"or 15%of the total system height. Use the chart below as a guideline to determine the point at which maintenance is required on your system. 771liple 17" 3"34" 5"50" 6" Quad 67" 69' Pent 84" 69' Before any maintenance is performed on your system, he sure to plug the outlet pipe to prevent contamination of the adjacent systems. To back-flush the R-Tank,water is pumped into the system through the Maintenance Ports as rapidly as possible.Water should be pumped into ALL Maintenance Ports.The turbulent action of the water moving through the R-Tank will suspend sediments which may then be pumped out. If your system includes an Outlet Structure, this will be the ideal location to pump contaminated water out of the system. However, removal of back-flush water may be accomplished through the Maintenance Ports, as well. For systems with large footprints that would require extensive volumes of water to properly flush the system, you should consider performing your maintenance within 24 hours of a rain event. Stormwater entering the system will aid in the suspension of sediments and reduce the volume of water required to properly flush the system. Once removed, sediment-laden water may be captured for disposal or pumped through a DirtbagTm (if permitted by the locality). AGF2831 Cardwell Road Richmond,Virginia,23234 800.448.3636 FAX 804.743.7779 LET'S GET IT DONE acfenvironmental.com FOO ENVIRONMENTAL Step-By-Step Inspection&Maintenance Routine 1) Inspection a. Inspection Port i. Remove Cap ii. Use flashlight to detect sediment deposits iii. If present, measure sediment depth with stadia rod iv. Record results on Maintenance Log v. Replace Cap b. Maintenance Port/s i. Remove Cap ii.Use flashlight to detect sediment deposits iii. If present, measure sediment depth with stadia rod iv. Record results on Maintenance Log v. Replace Cap vi. Repeat for ALL Maintenance Ports c. Adjacent Manholes i. Remove Cover H. Use flashlight to detect sediment deposits iii. If present, measure sediment depth with stadia rod, accounting for depth of sump (if present) iv. Inspect pipes connecting to R-Tank v. Record results on Maintenance Log vi. Replace Cover vii. Repeat for ALL Manholes that connect to the R-Tank 2) Maintenance a. Plug system outlet to prevent discharge of back-flush water b. Determine best location to pump out back-flush water c. Remove Cap from Maintenance Port d. Pump water as rapidly as possible(without over-topping port) into system until at least l„ of water covers system bottom e. Replace Cap f. Repeat at ALL Maintenance Ports g. Pump out back-flush water to complete back-flushing h. Vacuum all adjacent structures and any other structures or st&mwater pre-treatment systems that require attention i. Sediment-laden water may be captured for disposal or pumped through a DirtbagT"^ j. Replace any remaining Caps or Covers k. Record the back-flushing event in your Maintenance Log with any relevant specifics a c c cc O O u > a o Ca C E CQ a, fn m m 00 00 0 LA aaii ro Ln 79 N c t', N C O u vi O d 7 O Y 7 O a3 L C O Ql 1=i C � ? E > O c 0 c �C O a1 U 41 to E O A LA LL J V1