Included in this section are the Wastewater Daily Flow Analysis and the Baxter Meadows Lift
Station(BMLS) Analysis. The BMLS Analysis shows that the Flanders Mill Subdivision Phase
7 apartment development was originally designed for 200 dwelling units. The Flanders Mill
Apartments development proposes 200 dwelling units and therefore meets the requirements for
wastewater flow capacity set forth by the remaining capacity of the lift station.
Wastewater Daily Flow Analysis
Flanders Mill Apartments
Phase I
Average Dail), Flow
No of Units 78
Residents/unit 2.17
Gallons per Capita/day 65
Average Daily Flow 11,002 gpd
Peaking Factor Calculations
Zoning Acres Units/Acre Density Total
(residents/unit) Popoulation
R4 4.29 18.18 2.17 169
Peaking = Q(max) = 18 +P 0.50 P= Population/thousands=47\3/1000 = 0.169
Factor Q(ave) 4 +P 0.50
Peaking Factor = 4.17
Peak Hour Sewer Demand
Average Daily Flow 11,002 gpd
458.4 gph
7.6 gpm
Peaking Factor 4.17
Peak Hour Sewer Demand 1913.2 gph
31.9 gpm
255.78 cfh
4.26 cfm
0.071 cfs