Loading...
HomeMy WebLinkAboutWastewater Flow Analysis 01-29-20 Wastewater Calculations Included in this section are the Wastewater Daily Flow Analysis and the Baxter Meadows Lift Station(BMLS) Analysis. The BMLS Analysis shows that the Flanders Mill Subdivision Phase 7 apartment development was originally designed for 200 dwelling units. The Flanders Mill Apartments development proposes 200 dwelling units and therefore meets the requirements for wastewater flow capacity set forth by the remaining capacity of the lift station. Wastewater Daily Flow Analysis Flanders Mill Apartments Phase I Average Dail), Flow No of Units 78 Residents/unit 2.17 Gallons per Capita/day 65 Average Daily Flow 11,002 gpd Peaking Factor Calculations Zoning Acres Units/Acre Density Total (residents/unit) Popoulation R4 4.29 18.18 2.17 169 Peaking = Q(max) = 18 +P 0.50 P= Population/thousands=47\3/1000 = 0.169 Factor Q(ave) 4 +P 0.50 Peaking Factor = 4.17 Peak Hour Sewer Demand Average Daily Flow 11,002 gpd 458.4 gph 7.6 gpm Peaking Factor 4.17 Peak Hour Sewer Demand 1913.2 gph 31.9 gpm 255.78 cfh 4.26 cfm 0.071 cfs