Loading...
HomeMy WebLinkAboutStormwater Maintenance Plan Draft 01-28-20 G:\MADISON ENGINEERING\PROJECTS\2017\17-128 Flanders Mill\report\STORMWATER MAINTENANCE PLAN.doc STORMWATER MAINTENANCE PLAN Flanders Mill Apartments Owner’s responsibility for routine inspection and maintenance 1. Keep the inlets of the facilities free of leaves, rocks, and other debris. 2. Re-sod damaged or maintained areas immediately, or use grass plugs from the adjacent up-slope area. 3. See that litter and other debris are removed from inlets, swales, and vegetated and paved areas. 4. Maintenance of the underground systems are as follows: • Minimum required maintenance includes a quarterly inspection during the first year of operation and a yearly inspection thereafter. Utilize inspection ports for inspections. • The inspection ports can be used to pump water into the system and re- suspend accumulated sediment so that is may be pumped out. Flush and pump as inspections deem necessary. • Utilize the adjacent upstream storm sewer manhole or cleanout for removal (vacuuming) of debris from the end of the storm drain at the connection point with the underground chamber. 5. Owner to maintain and fund Operation and Maintenance of stormwater facilities. _______________________________ Jesse Chase, Owner