HomeMy WebLinkAbout13.1_SWPPP_02-04-2020
G:\MADISON ENGINEERING\PROJECTS\2019\19-116 Springer-Collins\Application\SWPPP\City Engineering SWPPP Cover Letter.docx
895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 Fax (406) 586-5740
MADISON
ENGINEERING
January 14, 2020
Cody Flammond
City of Bozeman
Stormwater Division
20 East Olive
Bozeman, MT 59715
RE: Collins Apartments
NOI-SWPPP Stormwater Management Permit Application
Dear Cody,
We are submitting on behalf of the Applicant/Owner the attached MDEQ Notice of Intent (NOI)
and SWPPP for the Collins Apartments development located at the southwest corner of the
intersection of Warbler Way and Catalyst St. in Bozeman. We understand there is currently no fee
required with the City for this application.
Please review the submitted material at your earliest convenience. Please respond with comments
to derek@mad-eng.com or call us at 586-0262.
Sincerely,
Madison Engineering, LLC.
_____________________________
Derek Dennehy, EI
cc: file
AGENCY USE ONLY
PERMIT NO.:Date Rec’d.:Amount Rec’d.:Check No.:Rec’d By:
WATER PROTECTION BUREAU
FORM
NOI
Notice of Intent (NOI)
Storm Water Discharge Associated With Construction
Activity MTR100000
The NOI form is to be completed by the owner or operator of construction activity eligible for coverage under the
Department’s General Permit for Storm Water Discharges Associated with Construction Activities. Please read the
attached instructions before completing this form. You must print or type legibly; forms that are not legible or are not
complete or are unsigned will be returned. You must maintain a copy of the completed NOI form for your records.
Section A - NOI Status (Check one):
No prior NOI submitted for this site. New
Resubmitt
Permit Number: MTR10 __ __ __ __
Permit Number: MTR10 __ __ __ __
Permit Number: MTR10 __ __ __ __
(Discuss Modification in
Section I)
Section B – Facility or Site Information
Site Name
Site physical address, mailing address at location, or directions to the site
Township/Range/Section (optional):
Nearest City or Town Zip Code County
Latitude Longitude
Is this facility or site located ? Yes No
Section C – Applicant (Owner/Operator) Information:
Owner or Operator Name (Organization Formal Name)
Mailing Address
City, State, and Zip Code:
Phone Number Email
Status of Applicant (Check one) Federal State Private Public Other (specify)
Collins Apartments
Located at the SW corner of the intersection of Warbler Way and Catalyst St.
Bozeman 59718 Gallatin
45.712903 -111.076840
Springer Group
626 East Cottonwood
Bozeman, MT 59715
(406) 585-2400 lowell@springergroup.net
Section F – SWPPP Administrator
:
Name
Mailing Address
City, State, and Zip Code
Phone
:
Mailing Address
City, State, and Zip Code
Phone
404 Permit (dredge & fill)
Section D – Existing or Pending Permits, Certifications, or Approvals:
MPDES
A. Primary B. Second
C. Third D. Fourth
Alternate Phone
Alternate Phone
:
Mailing Address
City, State, and Zip Code
Phone Alternate Phone
City of Bozeman
Cody Flammond
1522 -General Contractors -Residential Buildings Other Than 1794 -Excavation Work
Derek Dennehy SWPPP Admin
895 Technology Blvd, Suite 203
Bozeman, MT 59718
586-0262
Madison Engineering derek@mad-eng.com
BMP 201 and 202 02/16/2018
Juliene Sinclair SWPPP Admin
895 Technology Blvd Suite 203
Bozeman, MT 59718
586-0262
Madison Engineering juliene@mad-eng.com
BMP 201 and 202 09/22/2017
Section H –Describe the Construction Activity or Project
Please provide a summary of Best Management Practices (BMPs) in the SWPPP
Section G – Receiving Surface Water(s):
Storm Water Outfall/Discharge Locations: For each outfall, list latitude and longitude in the decimal degrees
format (00.0000; -000.0000) and the name of the receiving waters.This section must not be left blank and
45.71298200 -111.07653400 East Catron Creek
The project consists of the construction of four multi-residential apartment buildings. Water and
sewer services will be installed at each building, and an asphalt road will also be constructed. An
on-site stormwater retention/infiltration basin has been designed for stormwater flows.
Permanent stormwater control will consist of sheet flow over an asphalt roadway surface to curb inlets around the
site. The curb inlets will direct stormwater to a retention infiltration basin located on site via piping (see attached
SWPPP drawing).
Temporary BMPs include:
Straw wattles around the south and east site perimeter that will remain in place until vegetation has been
established. A designated construction entrance with a vehicle tracking pad is located at the east entrance to the
site. A concrete washout area and concrete containment area, material stockpile locations, trash receptacles, and
worker toilets will be provided. Daily clean ups and weekly street sweeping will be required. Vegetative buffer
exists along the north and west portions of the property. Regular SWPPP inspections will be completed.
Section J – Fee:
NEW PROJECTS:
Indicate the acreage of construction related disturbance indicated in Section H of this NOI form. The
fee for new projects includes the application and the annual fee for the calendar year in which the
permit authorization is effective.
1-5 acres $ 900.00
>5-10 acres $1,000.00
>10-25 acres $1,200.00
>25-100 acres $2,000.00
>100 acres $3,500.00
$ 500.00 (minor modification, only if six months from
date the permit authorization is effective)
RESUBMITTAL
RENEWAL $ Amount specified in Rule ()
MODIFICATION
Map:
Attach a USGS topographic quadrangle map extending one mile beyond the property boundaries of the site or
activity identified in Section B depicting the facility or activity boundaries, major drainage patterns, and the
receiving surface waters stated above.
Section I – Supplemental Information (For Permit Modification Only – leave blank except for
modification)
Total site area (acres)
Area of Construction Related Disturbance (acres)
Estimated Project Start Date
Estimated Project Final Stabilization Date
Estimated Project Completion Date
1.11
1.11
03/03/2020 09/06/2021
09/20/2021
Section - C
Authorized Signatories:This form must be completed, signed, and certified as follows:
For a corporation, by a principal officer of at least the level of vice president;
For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or
For a municipality, state, federal, or other public facility, by either a principal executive officer or
ranking elected official.
All Applicants Must Complete the Following Certification:
I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information; including the possibility of fine and imprisonment for knowing violations.
A. Name (Type or Print)
B. Title (Type or Print) C. Phone No.
D. Signature E. Date Signed
The Department will not process this form until all of the requested information is supplied, and the appropriate
fees are paid. Return this form and the applicable fee to:
Department of Environmental Quality
Water Protection Bureau
PO Box 200901
Helena, MT 59620-0901
(406) 444-3080
Lowell Springer
Owner (406) 585-2400