RE: Nexus Point Development, Phase I - Site Plan Application
J.O. 18-127
Dear Brian:
On behalf of our client, SM Advisory Group LLC,we are submitting a Phase I Site Plan application for
review for the proposed"Nexus Point Multi Unit Household Residential Development"located on Lot 1 of
Minor Sub 235 at 3747 South 19`h Avenue. The Site Plan is being submitted concurrently with a Master
Site Plan application.
Access to the proposed development will be from South 19`h Avenue and Lantern Drive. Site
improvements include public water, sewer and roadway extension, parking, drive lanes, sidewalks,trash
enclosures, landscaping and storm water facilities are proposed. Public improvements will be within the
appropriate public right of way/utility easements.
Included in our submittal package are 3 copies of the following items:
• Site Plan Review Fee Summary
• Site Plan Review Fee-$16,438.00($2,278.00 base fee+$118/unit)
• Form Al -Development Review Application
• Form SP 1 -Site Plan Checklist
• Form SP—Site Plan Required Material
• Form N 1 —Noticing Material
• Adjacent Property Owner List
• Adjacent Property Owner Stamped and Pre-addressed Envelopes
• Project Narrative
• Concept Review Comment Narrative
• Storm Water Run-Off& Retention Calculations
• Water&Wastewater Design Reports
• Construction Stormwater(SWPPP)Permit
G:\MADISON ENGINEERING\PROJECTS\2018\18-127 Nexus Point\Application\Site Plan\Phase I1Site Plan Application letter 05-28-
09.docx
895 Technology Blvd Suite 203 ♦ Bozeman, MT 59718 ♦ (406) 586-0262 ♦ Fax(406) 586-5740
Brian Krueger Project: Nexus Point
May 28, 2019 Page 2 of 2
• CIL of Water Rights Calculations
• Site Calculations
o Open Space Calculation and Exhibit
o Parking Calculation
o Floor Area Ratio Calculations
o DNRC Well Request Email
• Proposed Park Development&CIL Summary
Lantern Park Development and Maintenance Agreement
• Wetland Permit
• Wetland Deed Restriction
Traffic Impact Study
• Geotechnical Summary Letter
• 2 full size and 1 reduced copies of the Civil Site, Landscape Plan, Site Lighting and Architectural
Drawings.
• 2 Digital Copies of Application and Drawings
No variances are proposed. Please review the submitted material at your earliest convenience. If you have
any questions or need additional information please feel free to contact us at 586-0262.
Sincerely,
Madison Engineering,Inc.
Chris G. Budeski,PE
Principal/Owner
cc: Steve Moore, SM Advisory Group,Applicant
G Force 1 LLC, Owner
file
895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262 (406)586-5740 Fax