Loading...
HomeMy WebLinkAboutSite Calculations 06-19-19 NEXUS POINT FLOOR AREA RATIO Phase I Floor Area BldeTvpe Units 1st Floor 2nd Floor 3rd Floor Total VA 12-Plex 4,184 4,184 4,184 12,552 sf B 12-Plex 4,184 4,184 4,184 12,552 sf C 12-Plex 4,184 4,184 4,184 12,552 sf A 24-Plex 8,015 8,015 8,015 24,045 sf B 24-Plex 8,015 8,015 8,015 24,045 sf Club House 5,305 4,584 0 9,889 sf Floor Area Per Building #Bldgs A-12 Plex 12,552 1 12,552 sf B-12 Plex 12,552 2 25,104 sf C-12 Plex 12,552 3 37,656 sf A-24 Plex 24,045 1 24,045 sf B-24 Plex 24,045 1 24,045 sf Club House 9,889 1 9,889 sf Total Floor Area: 133,291 sf Lot Area North 147,678 East 111,331 Total Lot Area 259,009 sf Phase I-Floor Area Ration(FAR) 51.5% Future Phases Floor Area Bldg Type Units 1st Floor I 2nd Floor I 3rd Floor Total A 30-Plex 12,900 12,900 12,900 38,700 sf Office 5,580 5,580 11,160 sf Floor Area Per Building #Bldgs A-30 Plex 38,700 4 154,800 sf Office-North 11,160 1 11,160 sf Office-South 11,160 1 11,160 sf Total Floor Area: 177,120 sf Lot Area West 219,438 sf Office-North 28,151 sf Office-South 25,768 sf Total Lot Area 273,357 sf Future Phase-Floor Area Ration(FAR) 64.8% Smmary Total Floor Total Ovreall Site Plan Area LotArea Phase I 133,291 259,009 Future Phase 177,120 273,357 Total 310,411 532,366 Overall Site Floor Area Ration(FAR) 58.3% Wastewater Peak Hour Flow Analysis Nexus Point Peak Hour Sewer Demand Summary Peak Hour Sewer Flow Residential Development Area: 0.277 cfs Office Developement Area: 0.01 cfs Total Peak Hour Sewer 0.287 cfs Infiltration Rate Development Area: Residential Area; 14.32 acres Office Area: 1.53 acres Total Development Area 15.85 acres Infitration Rate: 150 gal/acre/day C.O.B. Design Stds. Page 48 Total Infitration Rate: 2,378 gal/day 0.0275 gal/sec 0.0037 cfs Total Peak Hour with Infiltartion 0.291 cfs Wastewater Peak Hour Flow Analysis Nexus Point Residential Development Average Dail No of Units 240 Residents/unit 2.11 Gallons per Capita/day 89 Average Daily Flow 45,070 gpd Peakinp,Factor Calculations Zoning Acres Units/Acre Density Total (residents/unit) Popoulation RO 14.32 16.75 2.11 506 Peaking = Q(m-) = 18 +P 0'50 P=population/thousands= 0.506 Factor Q(BVe) 4 +P 0.50 Peaking Factor = 3697 Peak Hour Sewer Demand Average Daily Flow 45,070 gpd 1,878 gph 31.3 gpm Peaking Factor 3.97 Peak Hour Sewer Demand 7,458 gph 124.3 gpm 997.1 cth 16.6 cfm 0.277 cfs Wastewater Peak Hour Flow Analysis Nexus Point Office Area Development Office Area North Building 11,500 sf (est) South Buidling 11,500 sf (est) Estimated Total Floor Area 23,000 sf (est) Lot Area North Building 0.83 acres(measured to roadway centerline) South Buidling 0.70 acres(measured to roadway centerline) Estimated Total Lot Area 1.53 acres Estimate Wastewater Flow Rate(RO zoned) Flow Rate per Acre 980 gal/acre/day C.O.B.Design Stds Table V-1 Flow Rate per Day 1,499 gal/day Estimated Population(to Calculate Peaking Factor) Flow Rate per Day 1,499 gal Flow Rate per Capita 89 gal Estimate people 17 Residents per Unit 2.11 C.O.B.Design Stds.Page 48 Estimated Units 8 Pcakinp,Factor Calculations Density Total Zoning Acres Units/Acre (residents/unit) Popoulation RO 1.53 5.22 2.11 17 Peaking = Q(m-) = 18 +P 0.50 P=Population/thousands= 0.017 Factor Q(.) 4 +P 0.50 Peaking Factor = 4.39 Peak Hour Sewer Demand Average Daily Flow 1,499 gpd 62.5 gph 1.0 gpm Peaking Factor 4.39 Peak Hour Sewer Demand 274.2 gph 4.6 gpm 36.66 cfh 0.61 cfm 0.010 cfs Chris Budeski From: Chris Budeski <chris@mad-eng.com> Sent: Tuesday, May 28, 2019 9:22 AM To: Kerri Strasheim (kstrasheim@mt.gov) Subject: Nexus Point - Exempt Well Request Attachments: Sht C1.0 - Overall Site Plan 05-28-19.pdf Kerri: As I am sure you are aware the City of Bozeman is requesting that development submit a request to DNRC for exempt well approval for site plan review. I have not submitted this type of request previously so please let me know if you need additional information. The project is a phased 240 multi unit residential development with two 11,500 sf+/- office buildings. The first Phase consists of 120 residential units. The balance and office buildings will be built in future phases. The anticipated water use is as follows: • Domestic (extending and tying in to the City water mains): max hour flow= 179.4 gpm • Irrigation—On Site (see attached layout): total water usage for phase iv irrigation=2.67 AF Please let me know if you need anything else. Sincerely: Chris G. Budeski, PE Madison Engineering, LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 406.586.0262 office chris@mad-eng.com MADISON F:NGINF.F.RING 1