May 281h, 2019
Mr. Brian Krueger
Development Review Manager
City of Bozeman Planning Department
20 East Olive
Bozeman, MT 59715
RE: 2131 Graf Residential Development—Master Site Plan Application
J.O. 18-117
Dear Brian:
On behalf of our client SM Advisory Group LLC, we are submitting a Master Site Plan application for
review for the proposed"Nexus Point Multi Unit Household Residential and Office Development"located
on Lot 1 of Minor Sub 235 at 2131 Graf Street. The Master Site Plan is being submitted concurrently with
a Phase I Site Plan application.
Access to the proposed development will be from South 19`h and Lantern Drive. Site improvements
include public water, sewer and roadway extension,parking, drive lanes, sidewalks,trash enclosures,
landscaping and storm water facilities are proposed. Public improvements will be within the appropriate
public right of way/utility easements.
Included in our submittal package are 3 copies of the following items:
• Master Site Plan Review Fee Summary
• Master Site Plan Review Fee- $1,935.00
• Form Al -Development Review Application
• Form SP 1 -Site Plan Checklist
• Form SP—Site Plan Required Material
• Form N 1 —Noticing Material
• Adjacent Property Owner List
• Adjacent Property Owner Stamped and Pre-addressed Envelopes
• Project Narrative
• Concept Review Comment Narrative
• Storm Water Run-Off&Retention Calculations
• Water&Wastewater Design Reports
• Construction Stormwater(SWPPP)Permit
G:\MADISON ENGINEERING\PROJECTS\2018\18-127 Nexus Point\Application\Site Plan\Phase I\Master Site Plan Application letter 05-
28-09.docx
895 Technology Blvd Suite 203 ♦ Bozeman, MT 59718 ♦ (406) 586-0262 ♦ Fax(406) 586-5740
Brian Krueger Project: Nexus Point
May 28, 2019 Page 2 of 2
• CIL of Water Rights Calculations
• Site Calculations
o Open Space Calculation and Exhibit
o Parking Calculation
o Floor Area Ratio Calculations
o DNRC Well Request Email
• Proposed Park Development&CIL Summary
• Lantern Park Development and Maintenance Agreement
• Wetland Permit
• Wetland Deed Restriction
• Traffic Impact Study
• Geotechnical Summary Letter
• 2 full size and 1 reduced copies of the Civil Site, Landscape Plan, Site Lighting and Architectural
Drawings.
• 2 Digital Copies of Application and Drawings
No variances are proposed. Please review the submitted material at your earliest convenience. If you have
any questions or need additional information please feel free to contact us at 586-0262.
Sincerely,
Madison Engineering,Inc.
Chris . Budeski. PE
Principal/Owner
cc: Steve Moore, SM Advisory Group, Applicant