HomeMy WebLinkAboutSht AP1.02 - ARCHITECTURAL - 01-03-2020FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
METAL SIDING PER
MATERIAL FINISH SCHEDULE
METAL ROOFING PER
MATERIAL FINISH SCHEDULE
1
1
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
OPEN PEDESTRIAN
ENTRYWAY; 3'-0" CLEAR "CORA" 77"X31" BIKE RACK
1"
12"
2
2
FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
B
B
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
A
A
FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
B
B
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
METAL ROOFING PER
MATERIAL FINISH SCHEDULE
TUBE STEEL COLUMN
ACCESS DOORS TO
TRASH BINS
METAL SIDING PER
MATERIAL FINISH SCHEDULE
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
TUBE STEEL ROOF
STRUCTURE
LIGHT FIXTURE MOUNTED
TO FACE OF RAFTER
A
A
FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
1
1
METAL ROOFING PER
MATERIAL FINISH SCHEDULE
TUBE STEEL COLUMN J-METAL FLASHING CAP
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
ACCESS DOORS TO
TRASH BINS. MIN 1'
ABOVE GRADE
METAL SIDING PER
MATERIAL FINISH SCHEDULE
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
J-METAL CORNER
TRIM
1"
12"
2
2
FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
9
AP1.02
9
AP1.02 1
1
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
TUBE STEEL STRUCTURE TUBE STEEL
STRUCTURE
TUBE STEEL STRUCTURE
2
2
FINISH GRADE
100'-0"
FINISH GRADE
100'-0"
B.O. ROOF STRUCTURE
109'-0"
B.O. ROOF STRUCTURE
109'-0"
6
AP1.02
6
AP1.02 B
B
T.O. ROOF STRUCTURE
111'-1 3/8"
T.O. ROOF STRUCTURE
111'-1 3/8"
4" STEEL
BOLLARDS
TUBE STEEL COLUMN
ACCESS DOORS TO
TRASH BINS
FINISH GRADE PER
CIVIL ENGINEER
T.O. SCREENING WALL
106'-6"
T.O. SCREENING WALL
106'-6"
A
A LIGHT FIXTURE MOUNTED
TO FACE OF RAFTER
AP1.02
5
AP1.02
4
AP1.02
8
AP1.02
7
TRASH BIN
AREA
EDGE OF CONCRETE SLAB
9
AP1.02
9
AP1.02
6
AP1.02
6
AP1.02
BB
1
1
(2) 4" DIA. STEEL BOLLARDS.
MAX. HEIGHT 40" ABOVE GRADE.
FILLED WITH CONCRETE AND
SET PER STEEL BOLLARD DETAIL
STEEL FRAME DOORS WITH
(3) HEAVY DUTY HINGES/POST;
DESIGN TO CARRY DOOR
WEIGHT & ALLOW FOR 180
DEGREE OPENING (TYP) @
ALL GATES
PROVIDE CANE BOLT W/
SHARPENED PIN @ EACH
DOOR LEAF; SHARPENED PIN
USED TO HOLD DOOR OPEN
ONLY; DO NOT DRILL HOLES
IN SLAB FOR CANE BOLTS
METAL
EDGING
BARREL PIN & LATCH; LONG ENOUGH
TO HOLD DOORS IN CLOSED
POSITION W/O USE OF CANE BOLTS
6" THICK REINFORCED
CONCRETE SLAB
CONTROL JOINT (TYP)
MAINTAIN 3'-0" CLEAR
PATHWAY
OPEN PEDESTRIAN
ENTRYWAY
16'-0"
CLCLCLCL6" 5'-10" 5'-10" 3'-4" 6"
C L
C L
5'
-
4
"
2'
-
6
"
10
'
-
2
"
5' MIN. ADA TURNING RADIUS
AA
2
2
1'
-
2
"
7'
-
1
0
"
1'
-
2
"
AP1.02
5
AP1.02
4
AP1.02
8
AP1.02
7
9
AP1.02
9
AP1.02
6
AP1.02
6
AP1.02
BB
1
1
METAL ROOFING PER
MATERIAL FINISH SCHEDULE
1" / 12"
AA
2
2
1'
-
0
"
4"
1'
-
0
"
4"
BB
1
1
STEEL ROOF PURLINS
WP
SWITCH LIGHTS W/
NORTHERN-ORIENTED
PHOTO SENSOR OR
ASTRONOMICAL TIMER
LIGHT FIXTURE
MOUNTED TO FACE OF
RAFTER
MAN'F:RAB
MODEL: WPLED10Y
NOTE:
PAINT ALL EXPOSED
CONDUIT AND SHEET
METAL TO MATCH
STRUCTURAL STEEL
GFI
STEEL RAFTERS
AA
2
2
SHEET
PROJECT NUMBER
81211 Gallatin Rd. Suite E
Bozeman, Montana 59718
406.587.9968
studiohdesigninc.com
PR
I
N
T
E
D
O
N
:
PR
O
J
E
C
T
#
:
FIL
E
P
A
T
H
:
PR
O
J
E
C
T
N
A
M
E
:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
TH
E
S
E
D
R
A
W
I
N
G
S
A
R
E
T
H
E
O
R
I
G
I
N
A
L
UN
P
U
B
L
I
S
H
E
D
W
O
R
K
O
F
T
H
E
A
R
C
H
I
T
E
C
T
A
N
D
MA
Y
N
O
T
B
E
D
U
P
L
I
C
A
T
E
D
O
R
U
S
E
D
W
I
T
H
O
U
T
TH
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
T
H
E
A
R
C
H
I
T
E
C
T
.
REVISIONS
ISSUED
ISSUE DATE:
1/
3
/
2
0
2
0
3
:
1
4
:
1
2
P
M
C:
\
U
s
e
r
s
\
S
H
D
1
\
D
o
c
u
m
e
n
t
s
\
2
0
1
8
0
8
-
0
4
_
N
e
x
u
s
T
r
a
s
h
E
n
c
l
o
su
r
e
s
_
v
2
0
1
9
_
S
H
D
1
.
r
v
t
AP1.02
201808 -02
TRASH
ENCLOSURE -
ARCHITECTURAL
NE
X
U
S
P
O
I
N
T
P
H
I
-
TR
A
S
H
E
N
C
L
O
S
U
R
E
BO
Z
E
M
A
N
,
M
O
N
T
A
N
A
AP
1
.
0
2
20
1
8
0
8
-02
NE
X
U
S
P
O
I
N
T
P
H
I
-
TR
A
S
H
E
N
C
L
O
S
U
R
E
Au
t
h
o
r
Ch
e
c
k
e
r
01/03/2020 SITE PLAN SUBMITTAL
ST
A
N
D
A
R
D
E
N
C
L
O
S
U
R
E
1/4" = 1'-0" AP1.02
5 EAST ELEVATION
1/4" = 1'-0" AP1.02
8 NORTH ELEVATION
1/4" = 1'-0" AP1.02
7 SOUTH ELEVATION
1/4" = 1'-0" AP1.02
4 WEST ELEVATION
1/4" = 1'-0" AP1.02
6 SECTION A
1/4" = 1'-0" AP1.02
9 SECTION B_STANDARD
1/4" = 1'-0" AP1.02
1 FLOOR PLAN
1/4" = 1'-0" AP1.02
2 ROOF PLAN
TRASH ENCLOSURE MATERIAL SCHEDULE
MATERIAL DESCRIPTION MAN'F./ SUPPLIER MODEL/SERIES DIMENSIONS FINISH COLOR
METAL SIDING & ROOFING
METAL FASCIA/DRIP EDGE
METAL SALES
FIELD PAINTED
-
7/8" CORRUGATED/WALL 2.67" x 7/8" x 24 GA. BONDERIZED
STRUCTURAL STEEL
BRIDGER STEEL
PER CONTRACTOR
BONDERIZED
"IRON ORE" SW 7069
24 GA.
1/4" = 1'-0" AP1.02
3 LIGHTING/POWER PLAN
-
-
-
PRO INDUSTRIAL DTM ACRYLIC