HomeMy WebLinkAboutCover-Site Rev 2 05-19-20 ° U
N SITE PLAN DESIGN
J Y
J
3 University F
Remington ¢ 3 ®R
Way o
s°°°o� �� Dr. KQgy Blvd. NEXUS POINT e PHASE I
SHEET INDEX
SHEET NO. DESCRIPTION DATE
Opportunity Way 12-PLEX BLDG A
Stucky Rd. z BOZEMAN� SIT APO.00A COVER SHEET 01/03/20
0
i APO.01 3D VIEWS 01/03/20
'o APO.02A AREA PLANS 01/03/20
CD
o N
o Zone: Zone: f ������� ®�® APO.03 MATERIAL BOARD 01/03/20
CITY Coun>�. I/j REMU -�°° AP2.01A FLOOR PLAN - MAIN LEVEL 01/03/20
LIMITS w` 9 AP2.02A FLOOR PLAN - SECOND LEVEL 01/03/20
Bennett Zone: Arnold St. PROJECT NARRATIVE INDEX
AP2.03A FLOOR PLAN - THIRD LEVEL 01/03/20
Rl PROJECT: NEXUS POINT SHEET INDEX AP3.01A BUILDING ELEVATIONS 01/03/20
L tern ° ZONING: RO-RESIDENTIAL OFFICE AP3.02A BUILDING ELEVATIONS 01/03/20
PROJECT SHEET N0. DESCRIPTION DATE
Zone Zone: LOCATION m o AP3.03A BUILDING ELEVATIONS 01/03/20
SITE AREA:
R4 R4 m OVERALL: 19.99 ACRES CIVIL DESIGN AP3.04A BUILDING ELEVATIONS 01/03/20
PHASE I:
COVER SHEET a a
Fi OVERALL AREA: 259,009 SF 5.95 AC 30% (OF TOTAL LOT AREA) CO.1 CMP & CONSTRUCTION ROUTE MAP 01/04/20 12-PLEX BLDG B cc a
Graf St. IMPERVIOUS AREA: 96,853 SF 2.22 AC 37%
ROOF AREA: 62,714 SF 1.44 AC 24% C1.0 OVERALL UTILITY & SITE PLAN 01/31/20 APO.00B COVER SHEET 01/03/20
CO LANDSCAPED AREA: 99,442 SF 2.28 AC 38% 1^,
C1.1 SITE PLAN - NORTH 05/19/20 APO.01 3D VIEWS 01/03/20 zW
ELI PUBLIC ROADWAY EASEMENT: C1.2 SITE PLAN - EAST 05/19/20 APO.02 AREA PLANS 01/03/20
OVERALL AREA: 126,745 SF 2.91 AC 15% (OF TOTAL LOT AREA)
IMPERVIOUS AREA: 118,846 SF 2.73 AC 75% C1.3 DIMENSION PLAN - NORTH 01/31/20 APO.03 MATERIAL BOARD 01/03/20
LANDSCAPED AREA: 31,686 SF 0.73 AC 25% C1.4 DIMENSION PLAN - EAST 05/19/20 AP2.0113 FLOOR PLAN - MAIN LEVEL 01/03/20
PARK AREA: 51,385 SF 1.18 AC 6% (OF TOTAL AREA) C1.5 DRAINAGE PLAN 05/19/20 AP2.02B FLOOR PLAN - SECOND LEVEL 01/03/20
DETENTION POND AREA: 14,269 SF 0.33 AC 2% (OF TOTAL AREA) C1.6 GRADING PLAN 05/19/20 AP2.03B FLOOR PLAN - THIRD LEVEL 01/03/20
DEEDED WETLAND AREA: 145,999 SF 3.35 AC 17% (OF TOTAL AREA)
C2.0 CIVIL DETAILS 01/04/20 AP3.01B BUILDING ELEVATIONS 01/03/20
FLOOR AREA: C2.1 CIVIL DETAILS 01/04/20 AP3.02B BUILDING ELEVATIONS 01/03/20
VICINITY MAP OVER
SITE PLAN
FLOOR AREA: 310,411 SF FAR 0.58 C2.2 CIVIL DETAILS 01/04/20 AP3.0313 BUILDING ELEVATIONS 01/03/20
NTS PHASE
FLOOR AREA: 133,291 SF FAR 0.52 LIGHTING DESIGN AP3.0413 BUILDING ELEVATIONS 01/03/20
LEGAL DESCRIPTION ADDRESS BLOCK FRONTAGE E1.1 SITE PHOTOMETRICS & LIGHTING PLAN 06/19/19 12-PLEX BLDG C o 0
LOT 1 MINOR SUB 235 LOCATED IN THE SEY4 OF SECTION 23, 3747 SOUTH 19TH AVENUE BOZEMAN MT 59718 SOUTH 19TH AVENUE: LANDSCAPED NEXUS POINT LANDSCAPE DESIGN APO.000 COVER SHEET 0]/03/20 F��
T2S, LS001 PHASE I - OVERALL LANDSCAPE PLAN OS/14/20 AP0.01C 3D VIEWS 01/03/20
R5E P.M.M. CITY OF BOZEMAN, GALLATIN COUNTY, STATE LANTERN DRIVE: LANDSCAPED o
OF MONTANA. o 0
SURFACE WATER: SURFACE WATER IS LOCATED ON THE EAST SIDE OF THE LOT. LS1.0 PHASE I - OVERALL PLANTING PLAN 05/14/20 APO.02 AREA PLANS 01/03/20
PUBLIC PARK LAND DEDICATION PROPOSED RESIDENTIAL DEVELOPMENT
TRACKING TABLE FLOOD PLAIN: PER FEMA MAP THERE IS NO FLOOD PLAIN LS1.1 PHASE I - PLANTING PLAN 05/14/20 APO.03 MATERIAL BOARD 01/03/20
TOTAL FOR FUTURE SITE LIGHTING: SITE LIGHTING IS PROPOSED LS1.2 PHASE I - PLANTING PLAN 05/14/20 AP2.01C FLOOR PLAN - MAIN LEVEL 01/03/20
SUBDIVISION NAME: LOT 1 MINOR SUB 235 SUBDIVISION PHASE I PHASE TOTAL
PROJECT NAME: NEXUS POINT 5.44 ACRES 5.04 ACRES 10.48 ACRES PAYBACK DISTRICTS: THERE ARE NO SID DISTRICTS SHOWN LS1.3 PHASE I - PLANTING PLAN 05/14/20 AP2.02C FLOOR PLAN - SECOND LEVEL 01/03/20
N/A NET NET (NET) PAYBACK DISTRICTS-MEADOW CREEK LS20 PHASE I - OVERALL IRRIGATION PLAN 05/14/20 AP203C FLOOR PLAN - THIRD LEVEL 01/03/20 3 3
NUMBER OF RES. UNITS PER PHASE/LOT N/A 120 120 240 CASH IN LIEU OF WATER RIGHTS: CIL FOR WATER RIGHTS IS$89,280.00. LS21 PHASE I - IRRIGATION PLAN 05/14/20 AP3.01 BUILDING ELEVATIONS 01/03/20 in > >
/SITE PLAN: z w w
ACREAGE PARK LAND AND/OR CILP 1.96 1.81 3.77 AFFORDABLE HOUSING THE PROJECT IS A RESIDENTIAL FOR RENT PROJECT AND IS NOT LS2.2 PHASE I - IRRIGATION PLAN 05/14/20 AP3.02C BUILDING ELEVATIONS 01/03/20 0
AND OR IILP REQUIRED: N/A ACRES ACRES ACRES SUBJECT TO THE AFFORDABLE HOUSING ORDINANCE. LS2.3 PHASE I - IRRIGATION PLAN 05/14/20 AP3.03C BUILDING ELEVATIONS 01/03/20
ADDITIONAL IMPROVEMENTS IN LIEU OF REQUIRED N A $87,629.38 $87,629.38 STREET AND TRAFFIC A TRAFFIC STUDY HAS COMPLETED
4 uNIT ACRE CASH DONATION: / LS3.1 PHASE I - PLANTING & HARDSCAPE PLAN 05/14/20 AP3.04C BUILDING ELEVATIONS 01/03/20
ADDITIONAL IMPROVEMENTS IN LIEU OF PUBLIC PARK SUMMARY THE PROJECT IS A RESIDENTIAL PROJECT LS3.2 PHASE - PLANTING & HARDSCAPE DTLS 05 14 20 24-PLEX BLDG A a a
DEDICATED PARKLAND: N/A $57,058.75 $57,058.75 / /
0 0
TOTAL REQUIRED IMPROVEMENTS IN LIEU OF LS4.1 PHASE I - IRRIGATION DETAILS 05/14/20 APO.00 COVER SHEET 01/03/20
REQUIRED CASH & PARKLAND DONATION: N/A $144,688.13 $144,688.13 LS4.2 PHASE I - IRRIGATION DETAILS 05/14/20 APO.01 3D VIEWS 01/03/20
PROPOSED TOTAL IMPROVEMENTS IN LIEU OF N/A $201,499.00 $0.00 $201,499.00 LS4.3 PHASE I - IRRIGATION DETAILS 05/14/20 APO.02A AREA PLANS 01/03/20
REQUIRED PARKLAND NO CIL, PROPOSED:
PROPOSED IMPROVEMENTS IN EXCESS OF IN LIEU N/A $56,810.87 $0.00 $56,810.87 TRASH ENCLOSURE APO.03 MATERIAL BOARD 01/03/20 N
OF REQUIRED PARKLAND IMPROVEMENTS:
ACREAGE F PARK LAND PREVIOUSLY APO.0 COVER SHEET 01/03/20 AP2.01A FLOOR PLAN - MAIN LEVEL 01/03/20
O
DEEDED TO C.O.B. N/A AP1.01 TRASH ENCLOSURE - PERSPECTIVES 01/03/20 AP2.02 FLOOR PLAN - SECOND LEVEL 01/03/20
ACREAGE OF PARK LAND TO BE CONVEYED: N/A 1.70 0 0 AP1.02 TRASH ENCLOSURE - ARCHITECTURAL 01/03/20 AP2.03 FLOOR PLAN - THIRD LEVEL 01/03/20
PARK MASTER PLAN APPROVAL DATE: NONE ORIGINALLY PROVIDED CLUB HOUSE AP3.01 BUILDING ELEVATIONS 01/03/20
APO.00 COVER SHEET 04/10/20 AP3.02 BUILDING ELEVATIONS 01/03/20
VEHICLE PARKING(SEE PARKING SUMMARY) OPEN SPACE(SEE OPEN SPACE SUMMARY) APO.01 3D VIEWS 04/10/20 24-PLEX BLDG B
PHASE PHASE APO.02 AREA PLANS 04/10/20 APO.00 COVER SHEET 01/03/20
REQUIRED: 240 SPACES REQUIRED: 18,000 SF
PROVIDED: 277 SPACES PROVIDED: APO.03 MATERIAL BOARD 04/10/20 APO.01 3D VIEWS 01/03/20
BALCONIES/PATIOS: 7,584 SF
COMMON OPEN SPACE: 16,827 SF AP2.01 FLOOR PLAN - MAIN LEVEL 04/10/20 APO.0213 AREA PLANS 01/03/20
COMMUNITY CENTER: 9,591 SF AP2.02 FLOOR PLAN - SECOND LEVEL 04/10/20 APO.03 MATERIAL BOARD 01 03 20
TOTAL 29,591 SF 164.4%OF REQUIRED / /
AP3.01 BUILDING ELEVATIONS 04/10/20 AP2.01B FLOOR PLAN - MAIN LEVEL 01/03/20
I CERTIFY THAT THE GRADING PLAN FOR THIS PROJECT AP3.02 BUILDING ELEVATIONS 04/10/20 AP2.02 FLOOR PLAN - SECOND LEVEL 01/03/20
HAS BEEN DESIGNED TO PROVIDE ADA ACCESIBLE PEDESTRIAN BRIDGE AP2.03 FLOOR PLAN - THIRD LEVEL 01/03/20
ROUTES TO ALL THE UNIT DOORS FROM A PUBLIC APO.00 COVER SHEET 05/14/20 AP3.01 BUILDING ELEVATIONS 01/03/20
STREET.
APO.01 PEDESTRIAN BRIDGE 05/14/20 AP3.02 BUILDING ELEVATIONS 01/03/20
CHRIS G. BUDESKI, PE
Landscape Design by: Civil Engineering by: Architectural Design by: Applicant: Owner: _
IN SITE DESIGN GROUP MADISON ENGINEERING STUDIO ]H[ DESIGN SM ADVISORY GROUP NEXUS POINT LLC
17 NORTH 470 WEST 895 TECHNOLOGY BLVD,SUITE 203 81211 GALLATIN ROAD SUITE E 3661 JAGAR LANE 3661 JAGAR LANE
AMERICAN FORK UT 84003 BOZEMAN,MT 59718 BOZEMAN,MT 59718 BOZEMAN,MT 59718 BOZEMAN,MT 59718
(801)756-5043 (406)586-0262 (406)587-9968 (406)599-5169 (406)599-5169
COVER SHEET