Loading...
HomeMy WebLinkAbout07-06-20 City Commission Packet Materials - C7. PSA w Corrpro (Aegion) for Hilltop Tank Cathodic Protection System Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Jill Miller, WTP Superintendent Mitch Reister, Director of Public Works SUBJECT: Authorize the City Manager to execute the Professional Services Agreement with Corrpro (Aegion) for annual inspection of the Hilltop Tank Cathodic Protection System. MEETING DATE: July 6, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to execute the Professional Services Agreement with Corrpro (Aegion) for annual inspection of the Hilltop Tank Cathodic Protection System. BACKGROUND: In 2007, the 2 million gallon Hilltop Tank located on Kenyon Drive was drained, interior repaired and repainted, and a cathodic protection system was installed, by Corrpro (Aegion). Since then, the cathodic protection system has been inspected annually by Corrpro. The inspection generally occurs in June or July depending upon the company’s schedule. This includes Tank-to-Water potential profile, Electrical Measurements on anode and reference cells; inspection of controls, meters, contacts, and wiring; adjust system as needed, and submitting a report. Historically the WTP Superintendent signed the annual contract for this basic inspection. With the change in leadership at the WTP and additional training, a new contract was drawn up and agreed upon by both parties’ legal departments. UNRESOLVED ISSUES: None ALTERNATIVES: Forgo annual inspection. FISCAL EFFECTS: The inspection is budgeted for annually in the WTP Operating budget. The cost of the inspection is $915. Attachments: Professional Services Agreement with Exhibit Report compiled on: June 24, 2020 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153