Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Jill Miller, WTP Superintendent
Mitch Reister, Director of Public Works SUBJECT: Authorize the City Manager to execute the Professional Services Agreement with Corrpro (Aegion) for annual inspection of the Hilltop Tank Cathodic Protection System.
MEETING DATE: July 6, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to execute the Professional Services Agreement with Corrpro (Aegion) for annual inspection of the Hilltop Tank Cathodic Protection System.
BACKGROUND: In 2007, the 2 million gallon Hilltop Tank located on Kenyon Drive was drained, interior repaired and repainted, and a cathodic protection system was installed, by Corrpro (Aegion). Since then, the cathodic protection system has been inspected annually by Corrpro. The inspection generally occurs in June or July depending upon the company’s
schedule. This includes Tank-to-Water potential profile, Electrical Measurements on anode and
reference cells; inspection of controls, meters, contacts, and wiring; adjust system as needed, and submitting a report.
Historically the WTP Superintendent signed the annual contract for this basic inspection. With the change in leadership at the WTP and additional training, a new contract was drawn up and
agreed upon by both parties’ legal departments.
UNRESOLVED ISSUES: None
ALTERNATIVES: Forgo annual inspection.
FISCAL EFFECTS: The inspection is budgeted for annually in the WTP Operating budget. The cost of the inspection is $915.
Attachments: Professional Services Agreement with Exhibit
Report compiled on: June 24, 2020