Loading...
HomeMy WebLinkAbout04 Trip Generation Memo 2019_09_05                                                                                                                                                                                               MEMO 32 Discovery Drive                Bozeman, MT  59718                (406) 582‐0221                 Fax (406) 582‐5770  From: Allied Engineering Services, Inc. Project Name: Headwaters Academy Project Number: 19-024 Date and Time: September 4, 2019 Re: Trip Generation MEMO DETAILS: Trip generation volumes were determined for the proposed development of Headwaters Academy based on Trip Generation 9th Edition – Institute of Transportation Engineers (ITE). The proposed project includes the construction of a new classroom building and parking lot and the remodeling for use of an existing home. The school will consist of 6 classrooms (assuming 15 students per classroom) for 90 total students. The gross square footage of the two buildings is 11,115 ft2. The Land Use closest to the proposed project is Private School (K-8). Table 1 provides a summary of trips generated based on number of students. Table 2 includes trip generation based on gross floor area (per 1000 square feet). According to the ITE manual, the weekday A.M. peak hour of the generator typically coincides with the peak hour of the adjacent street traffic; therefore, only one A.M. peak hour, which represents both the peak hour of the generator and the peak hour of the adjacent street traffic, is displayed. The weekday P.M. peak hour varied between 2:00 p.m. and 4:00 p.m. Table 1 – Private School (K-8) Trip Generation Based on Number of Students Description Method Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour Number of Students (90) 0.9 81 55 45 45 36 Weekday, P.M. Peak Hour of Generator Number of Students (90) 0.6 54 47 53 25 29 September 5, 2019 Allied Engineering Services, Inc. Memo Page 2 Table 2 – Private School (K-8) Trip Generation Based on 1000 Square Feet Gross Floor Area Description Method Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour 1000 Square Feet Gross Floor Area (11.12) 11.59 129 55 45 71 58 Weekday, P.M. Peak Hour of Generator 1000 Square Feet Gross Floor Area (11.12) 6.53 73 49 51 36 37