Loading...
HomeMy WebLinkAbout03 Sanitary Sewer Demand 2019_09_05                                                                                                                                                                                               MEMO 32 Discovery Drive                Bozeman, MT  59718                (406) 582‐0221                 Fax (406) 582‐5770  Project Name: Headwaters Academy Site Plan Project Number: AESI 19-024 Date and Time: September 5, 2019 Re: Sanitary Sewer Demand MEMO DETAILS: The purpose of this memo is to outline the estimated peak sanitary sewer demand for the site development of Headwaters Academy. The demand is estimated based on Montana Department of Environmental Quality Circular 4 for a school. MDEQ Circular 4: An average wastewater flow rate of 15 gallons per day per student was assumed as outlined in the Montana Standards for Subsurface Wastewater Treatment Systems. This flow rate is for a school with a cafeteria only (no gym or showers). Please see the attached calculations for additional information. A summary is provided below.  90 Students  1,350 gal/day base rate  Peaking factor (P=.09) 4.26  Peak Demand = 5,745 gpd = 3.99 gpm The attached calculations also provide an average day and peak demand for a school with a cafeteria, gym, and showers. The current site plan for Headwaters Academy does not include a gymnasium or showers. These values are provided in the case that future development will include these amenities. Please contact Rory Romey at 406-582-0221 or rromey@alliedengineering.com with any questions or if additional information is required.