HomeMy WebLinkAbout20- Change Order 3 - Knife River-Belgrade - Cottonwood Road from Babcock to Durston CHANGE ORDER No. 3 DATE OF ISSUANCE EFFECTIVE DATE OWNER: City of Bozeman CONTRACTOR Knife River-Belgrade Contract: Cottonwood Road from Babcock to Durston dated June 3,2019 Project: Cottonwood Road from Babcock to Durston OWNER's Contract No. ENGINEER: RPA ENGINEER's Contract No. 14510.002 You are directed to make the following changes in the Contract Documents: • Remove Bid Item#48,Asphalt Seal and Chip Coat from the project, per the City Engineering Department. Cost reduction for the standard bid is$37,362.00. Cost reduction for the bid on the southbound lanes is $15,832.00. Total reduction is$53,194.00. • Add a Field Adjustable Wattage Selector(FAWS)retrofit kit to the LED lamps that are currently in stock at the Contractors storage facility. The FAWS will be added to all 43 lamps to meet the lighting standards in the current draft revision of the City of Bozeman Standard Specifications for Lighting Materials and Installation,dated January 2020. This Change Order also includes three house shields for lamps L27, L29, and L30,which are adjacent to the Bronzeleaf Condos.Additional cost for 43 FAWS is$9,030.00. Additional cost for 3 shields is$351.00. The total cost for the lighting change is$9,381.00. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: 211 calendar days $ 5,207,849.50 Ready for final payment: (days or dates Net Increase(Decrease)from previous Change Net change from previous Change Orders No._to Orders No. I to 2 No._ Substantial Completion: n/a $ (57,550)=$30,500+$1,950-$90,000 Ready for final payment: (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 211 calendar days $5,150,299.50 Ready for final payment: (days or dates Net increase(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion: 0 calendar days $(43,813.00)=$9,381.00- $53,194.00 Ready for final payment: (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 211 calendar days $5,106,486.50 Ready for final payment: (days or dates) CHANGE ORDER FORM Page 1 of 3 Contractor certifies and agrees that there are no additional costs or claims for extra work,additional time,delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further,that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that the work quantities and value were properly determined and are correct. CONTRACTOR(Authorized Signature) Date RECOMMENDED BY: APPROVED BY: "- `� A ✓ k�� t 'G'�0� ENGINEER-Signature) Date O"E (Authorized Signature) Date CHANGE ORDER FORM Page 2 of 3 CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement,any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party,all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. CHANGE ORDER FORM Page 3 of 3 1 KNIFF RIVFR AN MDU RESOURCES COMPANY www.knifedver.com Intermountain Region-Belgrade Division PO Box 9 Belgrade,MT 59714 (406)388-6832 (406)388-8347 Fax December 5,2019 Staci Venner Robert Peccia&Associates 3810 Valley Commons Dr. Suite 4 Bozeman,MT 59718 Serial Letter-14 RE: Cottonwood Road from Babcock St. to Durston Rd. Staci, Earlier you asked for pricing to install FAWS and Shields on some of the lights on the Cottonwood project. • We can furnish and field install the Lumec Retro-909-RFM-RETROFITKIT- UNIV-FAWS for$210.00 each. • We can furnish and field install the Lumec 912400548196 shield for$117.00 each. We can only offer a 1-year warranty on the FAWS as they are field installed. If you have any questions,please call me at 924-5602. Respectfully, Ar 2 ,6zo Steven R.Baeth Project Manager/Estimator Knife River—Belgrade EQUAL OPPORTUNITY EMPLOYER