HomeMy WebLinkAboutPALY_RC_Narrative_05-13-2020 4515 Valley Commons Drive #201, Bozeman Montana 59718 P: 406.585.4161 F: 406.585.6919 www.bechtlearchitects.com nickf@bechtlearchitects.com May 15, 2020 City of Bozeman Community Development 20 East Olive Street Bozeman, MT. 59771 RE: 18446 Palisades Multifamily Development R/C Submittal To Whom it may concern, We are pleased to submit these Revised/Corrected drawings and narrative for the Palisades Multifamily Development Concept Review Submittal, to be located at the corner of North 27 th and Breeze Lane. Application Materials We have included the digital copies of all the following materials for the Site Plan Review process: · 22x34 inch plans including: o SP00 - COVER SHEET 05-13-20 o SP01 - OVERALL SITE PLAN 05-13-20 o SP02 - SITE SECTION 03-03-20 o SP03 - ADDRESSING PLAN 05-13-20 o C1.0 - OVERALL SITE 05-13-20 o C2.0 - SITE GRADING & DRAINAGE PLAN 05-13-20 o C3.0 - CIVIL DETAILS 05-13-20 o L1.0 - LANDSCAPE COVER SHEET 05-13-20 o L1.1 - PLANTING PLAN SCHEDULE 05-13-20 o L1.2 - PLANTING DETAILS, MATERIAL SCHEDULE, NOTES 05-13-20 o L2.1 - IRRIGATION PLAN 05-13-20 o L2.2 - IRRIGATION SCHEDULE & NOTES 05-13-20 o L2.3 - IRRIGATION DETAILS 05-13-20 o L2.4 - IRRIGATION DETAILS 05-13-20 o SP20 - COVER SHEET_05-13-2020 o SP21 - MAIN FLOOR PLAN_05-13-2020 o SP22 - SECOND FLOOR PLAN_05-13-2020 o SP23 - THIRD FLOOR PLAN_05-13-2020 o SP24 - ROOF PLAN_05-13-2020 o SP25 - EXTERIOR ELEVATIONS_05-13-2020 o SP26 - EXTERIOR ELEVATIONS_05-13-2020 o SP27 - COLOR ELEVATIONS_05-13-2020 o SP28 - COLOR ELEVATIONS_05-13-2020 o SP60 - COVER SHEET_05-13-2020 o SP61 - 1ST FLOOR OVERALL PLAN_05-13-2020 o SP62 - 2ND FLOOR OVERALL PLAN_05-13-2020 h: \paly - palisade multifamily \design guidelines \site plan \00_editable \paly_rc_narrative_05 -13 -2020.do cx o SP63 - 3RD FLOOR OVERALL PLAN_05-13-2020 o SP64 - ROOF PLAN_05-13-2020 o SP66 - EXTERIOR ELEVATIONS_05-13-2020 o SP67 - EXTERIOR ELEVATIONS_05-13-2020 o SP68 - COLOR ELEVATIONS_05-13-2020 o SP69 - COLOR ELEVATIONS_05-13-2020 o SP70 - PERSPECTIVES_05-13-2020 · A1 Application · RC Revision and Correction Submittal form · Response to DRC Engineering comments · Updated stormwater design report · Fire & water profile · Sanitary sewer profile · Request for Concurrent construction · Waiver of Sis · CVA Covid-19 acknowledgement · Plumbing load letter for both building types · digital copies of all materials If you require additional materials, please let us know and we will provide them. Project Details This project consists of development of Lot 5B of the Annie Subdivision Phase 2. We are proposing to build out a high-density residential development. The Rose Park side of the development will include an 18-unit apartment complex with three (3) levels of 6 units. The floor area is 9,0179 square feet for the main floor and 9,069 square feet for the 2 upper floors. The 27 th street fronting of the development will include a 7-unit Rowhouse. The is lower floor area is 2,183 square feet with 3,145 square feet of garages. The 2 nd floor living area is 5,316 square feet and the 3rd floor is 5,862 square feet. Each three-story unit totals 2,356 square feet. Parking for the overall development consists of both on and off-street parking. The parking calculation on the Cover sheet SP000 is inclusive of the off-street parking. Garbage enclosure shall be designed to blend in with the complex designs. The on-site and road drainage shall be taken care of by a retention pond on north west corner of the lot. Landscaping Park allocations have been provided by the neighboring Rose Park that was constructed as part of the subdivision. The design intent of the development is to create a high-density development that the city is currently in need of. The design is intended to promote more units per acre to reduce the cost of the unit construction. As well as create a neighborhood that is directed to the park and livability of the areas. DRC Comment 4-15-2018 SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL h: \paly - palisade multifamily \design guidelines \site plan \00_editable \paly_rc_narrative_05 -13 -2020.do cx 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. RESPONSE - Applicant acknowledges this statement 2. The site plan shall have an initial entitlement period of one year. The applicant may seek an extension of not more than one additional year. Extensions may be sought under the provisions of Section 38.19.120.D. RESPONSE - Applicant acknowledges this statement Section 3 – REQUIRED CODE CORRECTIONS Planning Planning Advisory Comment: 1. Please submit all revisions using Corrections and Revisions cover sheet. Submit a full set of drawings (2-11x17) with revisions clouded. Include a table of contents will all drawings and their date of creation/revision. Ensure that the electronic version includes a fully updated, complete application. 24x36 plans are not required until final approval. RESPONSE – All revisions have been clouded. 2. Since the project has changed, please resubmit an updated A1 form with the changes. RESPONSE – All revisions have been clouded. 3. BMC 38.510.030.C. It is unclear if there is a pedestrian connection to the rowhouses from 27 th . On the landscape plan, there is something that leads up to the patios from the sidewalk, however, there is nothing in the legend that depicts what it is. A pathway of at least 3 feet must connect from the sidewalk to the patios. RESPONSE – The pedestrian connection to the rowhouses from 27 th is shown on both civil & landscape as a 3 foot wide path and noted on sheet L1.1 4. The apartment building must have elevations annotated like the rowhouse RESPONSE – The apartment building is annotated like the rowhouse. 5. Clean up elevation notes on rowhouses as there is a lot of overlap and it is difficult to read. RESPONSE – Elevation notes have been updated. 6. BMC 38.530.070. The north elevation of the apartment building contains a blank wall on the metal portion. The south elevation of the rowhouse contains a blank wall. RESPONSE – Blank wall is screened by landscaping, see L1.1 7. BMC 38.550.050.C.2.e. The minimum width of any parking lot landscaped area is 8 feet. The parking bulb on the south end adjacent to North 26 th Avenue does not meet this standard. RESPONSE – parking lot landscape area modified, see updated civil & landscaping. 8. BMC 38.520.060.B. Open space is not properly shown on the site. On the cover sheet SP00, it appears that decks/patios are the only open space calculation used for the units. Patios/balconies can only count towards 50% of the required open space h: \paly - palisade multifamily \design guidelines \site plan \00_editable \paly_rc_narrative_05 -13 -2020.do cx a. 18-plex: 2550 square feet of open space is required. It appears that 2502 square feet worth of patios/balconies is provided resulting in only 1251 square feet of open space. More open space is required. b. 7-unit rowhouse: 1050 square feet of open space is required. It appears that 1344 square feet worth of patios/balconies is provided resulting in 672 square feet of open space. More open space is required. c. Ensure that any additional open space meets the requirements of usable open space in 38.520.060.B. If any is to be common open space, ensure that it is labeled on the site plans. RESPONSE – open space calculations have been updated on SP00, see SP01 For site open space areas. Engineering Division; Griffin Nielsen, gnielsen@bozeman.net · See attached comments dated April 21 RESPONSE – see included comments letter from C&H Engineering Solid Waste Division; Russ Ward, rward@bozeman.net , 406-582-3235 · Refuse enclosure doors must open 180 degrees. The plan does not say if they do. RESPONSE – Enclosure doors are designed to open 180 degrees, note added to plan, see SP01 Fire Department; Scott Mueller, smueller@bozeman.net , 406-582-2353 · Overall drive accesses and area fire hydrants are appropriate. · On South side of Private Road of Breeze Ln, This shall be marked as Fire Lane per 2012 International Fire Code. RESPONSE – Fire lane added to C1.0 · 18 unit Building: Provide water service room meeting City of Bozeman Water Department standards RESPONSE – Water service room meets the required area as requested, see updated drawings · Due to addressing off N 25th, Fire Department Connection for fire sprinklers shall be located on interior building front (West or South Side) RESPONSE – Water service is provided on the north east corner of the building, the location of fire connection on west or south side is not feasible. · 7 unit Rowhouse: Provide larger water service room meeting City of Bozeman Water Department standards. RESPONSE – Water service room meets the required area as requested · Suggest swinging door out, not in. RESPONSE – Door swings out, see updated drawings · Both buildings will require fire sprinklers and alarms. RESPONSE – Both buildings shall have fire sprinkler systems and alarms, provided by design/build with the subcontractors. Documentation from said contractors shall be supplied for building permit. These Divisions did not provide comments. Reach out to them individually for any questions. h: \paly - palisade multifamily \design guidelines \site plan \00_editable \paly_rc_narrative_05 -13 -2020.do cx Floodplain Engineer; Brian Heaston, bheaston@bozeman.net , 406-582-2260 Forestry Division; Alex Nordquest, anordquest@bozeman.net, 406-582-3205 Parks Department; Addi Jadin, ajadin@bozeman.net , 406-582-2908 NorthWestern Energy; Cammy Dooley, cammy.dooley@northwestern.com Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-3200 Future Impact Fees - Please note that future building permit applications will require payment of the required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the required impact fees according to current rates please contact the Department of Community Development and/or visit. RESPONSE – impact fees shall be paid at the time of building permit issuance Note: During preparation of the staff report, additional conditions of approval may be recommended based on comments and recommendations provided by other applicable review agencies involved with the review of the project. Thanks, you for consideration of our project. We hope you agree the project design is suitable for this location. Please contact me nickf@bechtlearchitects.com , 406-585-4161 o, 406-599-9432 m, if you have any questions or comments. Feel free to contact Scott Bechtle ( scottb@bechtlearchitects.com ) in my office in my absence. Sincerely, Nick Fulton BECHTLE ARCHITECTS