The Peak Hourly Demand (PHD) is calculated as follows:
• Peaking Factor (Qmax/Qave) = (18 + P1/2) / (4 + P½)
o P = Population in thousands
o P = 25 people = 0.025 Thousand of People
o Qmax/Qave = (18 + 0.1581) / (4 + 0.1581) = 18.1581 / 4.1581 = 4.37
o Qmax/Qave = 4.37
• Building Maximum Daily Demand (MDD)
o Residential = (# units) X (People per Unit) X (100 GPD/Person)
▪ (7 Units) x (3.5 people per unit) x (100 GPD/ Person)
o ADD = 2,450 GPD
• Peak Hourly Demand (PHD)
o Peak Hourly Demand = (Peaking Factor (Qmax/Qave) X MDD) / 24 hours/ day
o Peak Hourly Demand = 4.37 x 2,450 GPD / 24 hr/day
o Peak Hourly Demand = 446.1 GPH