Loading...
HomeMy WebLinkAboutPALY_Plumbingletter_7plex_04-28-2020Page | 1 SE Engineers PO Box 10776 Bozeman, MT 59718 04/28/20 Palisades 7-Plex Sewer Peak Hour Demand The Peak Hourly Demand (PHD) is calculated as follows: • Peaking Factor (Qmax/Qave) = (18 + P1/2) / (4 + P½) o P = Population in thousands o P = 25 people = 0.025 Thousand of People o Qmax/Qave = (18 + 0.1581) / (4 + 0.1581) = 18.1581 / 4.1581 = 4.37 o Qmax/Qave = 4.37 • Building Maximum Daily Demand (MDD) o Residential = (# units) X (People per Unit) X (100 GPD/Person) ▪ (7 Units) x (3.5 people per unit) x (100 GPD/ Person) o ADD = 2,450 GPD • Peak Hourly Demand (PHD) o Peak Hourly Demand = (Peaking Factor (Qmax/Qave) X MDD) / 24 hours/ day o Peak Hourly Demand = 4.37 x 2,450 GPD / 24 hr/day o Peak Hourly Demand = 446.1 GPH SE Engineers Bill Edden, PE Owner, Mechanical Engineer