Loading...
HomeMy WebLinkAboutPALY_Plumbingletter_18plex_04-28-2020Page | 1 SE Engineers PO Box 10776 Bozeman, MT 59718 04/28/20 Palisades 18-Plex Sewer Peak Hour Demand The Peak Hourly Demand (PHD) is calculated as follows: • Peaking Factor (Qmax/Qave) = (18 + P1/2) / (4 + P½) o P = Population in thousands o P = 63 people = 0.063 Thousand of People o Qmax/Qave = (18 + 0.251) / (4 + 0.251) = 18.251 / 4.251 = 4.29 o Qmax/Qave = 4.29 • Building Maximum Daily Demand (MDD) o Residential = (# units) X (People per Unit) X (100 GPD/Person) ▪ (18 Units) x (3.5 people per unit) x (100 GPD/ Person) o ADD = 6,300 GPD • Peak Hourly Demand (PHD) o Peak Hourly Demand = (Peaking Factor (Qmax/Qave) X MDD) / 24 hours/ day o Peak Hourly Demand = 4.29 x 6,300 GPD / 24 hr/day o Peak Hourly Demand = 1,126 GPH SE Engineers Bill Edden, PE Owner, Mechanical Engineer