Loading...
HomeMy WebLinkAboutSP26 - EXTERIOR ELEVATIONS_05-13-2020T.O. FOOTING 96' -0" T.O. FOUNDATION 100' -0" T.O.SUBFLOOR LEVEL 2 110' -3 7/8" T.O.SUBFLOOR LEVEL 3 120' -9 1/4" BKHG T.O. ROOF DECKING 131' -4 1/2" I DLJ CEN MWP -1 FCP -2 FCP -1FCP -1 FCP -2 FCP -1 FCP -1 SMC -1 SGR -2SMC -1 WD -1 FCP -1 FCP -1 FCP -1 FCP -1 WC -1 FCP -2 FCP -2 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1FCP -1 MWP -1 MWP -1 O A BLOCK FRONTAGE CALCULATION: WALL AREA: 3336 SF GLAZING AREA: 625 SF PERCENTAGE OF GLAZING AREA TO WALL AREA: 625 SF / 3336 SF = 18.74 % FM ELEVATOR HEIGHT EXEMPTION PER SECTION 38.350.050 -D.2.C ELEVATOR SHAFT AREA : 185 SF 3 4 ' - 0 " MECH EQUIPMENT GUARD RAIL WITHIN 10'-0" OF EDGE OF BLDG STAIR TOWER HEIGHT EXEMPTION PER SECTION 38.350.050 -D.2.C STAIR TOWER AREA : 204 SF 2 ' - 5 " 2 ' - 0 " WD -1 27 ' - 9 1 / 4 " M A X . T R A N S P E R E N C Y H E I G H T 1' - 5 3 / 4 " MWP -4 MECH SCREEN SEE SP25 T.O. FOOTING 96' -0" T.O. FOUNDATION 100' -0" T.O.SUBFLOOR LEVEL 2 110' -3 7/8" ROOF PLAN 138' -4 7/8" T.O.SUBFLOOR LEVEL 3 120' -9 1/4" 1 2 8 9 10 13 14 7 11 12 4 T.O. ROOF DECKING 131' -4 1/2" T.O.ELEVATOR SHAFT 134' -11 3/8" 3 4 ' - 0 " MWP -1 MWP -1 FCP -2 FCP -2 FCP -2 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 FCP -1 MWP -1 FCP -1 FCP -2 FCP -2 FCP -2 FCP -2 SSB -1 SMC -1SGR -2 SGR -2 WD -1 WC -1 FCP -1 FCP -1 FCP -1 WC -1 FCP -1 WD -1 3 5 ME -3 ME -3 ME -3 STAIR TOWER STAIR TOWER STAIR TOWER HEIGHT EXEMPTION PER SECTION 38.350.050 -D.2.C ELEVATOR SHAFT AREA : 204 SF STAIR TOWER HEIGHT EXEMPTION PER SECTION 38.350.050 -D.2.C STAIR TOWER AREA : 194 SF 10.5 MWP -4 MECH SCREEN SP 25 STAIR TOWER HEIGHT EXEMPTION PER SECTION 38.350.050 -D.2.C ELEVATOR SHAFT AREA : 185 SF MATERIALS FCP -2 HARDI PANEL -SMOOTH FINISH COLOR: COUNTRY LANE RED FCP -1 HARDI LAP SIDING -WOODTONE COLOR: MOUNTAIN CEDAR MWP -1 CORRUGATED METAL - VERTICAL, COLOR: VINTAGE WD -1 22 GA. METAL FLASHING COLOR: MATTE BLACK ALL WINDOWS ANDERSON A100 SERIES IN BLACK FIBREX. WINDOWS WITHOUT TRIM ARE SET BACK 2" MIN. WINDOWS WITH TRIM HAVE FCP -3 TRIM, SEE MATERIAL SCHEDULE An y u n a u t h o r i z e d r e p r o d u c t i o n o r u s e o f t h i s i n f o r m at i o n w i t h o u t t h e e x p r e s s e d w r i t t e n c o n s e n t o f B e c h tl e A r c h i t e c t s i s a v i o l a t i o n o f U . S . c o p y r i g h t l a w s. C o p y r i g h t © 2 0 2 0 B e c h t l e A r c h i t e c t s JOB: 45 1 5 V a l l e y C o m m o n s D r i v e # 2 0 1 Bo z e m a n , M T 5 9 7 1 8 40 6 . 5 8 5 . 4 1 6 1 p h 4 0 6 . 5 8 5 . 6 9 1 9 f a x B E C H T L E A R C H I T E C T S 5/ 1 5 / 2 0 2 0 1 2 : 3 7 : 4 8 P M PA L I S A D E S 1 8 H H BO Z E M A N , M O N T A N A 2002 SP26 EXTERIOR ELEVATIONS SIRE PLAN REVIEW MAR. 31, 2020 SCALE: 1/8" = 1'-0" 2 EAST SCALE: 1/8" = 1'-0" 1 SOUTH REVISION SCHEDULE No. Description Date EXT MATERIAL SCHED. MT MATERIAL MANUFACTURER TYPE, COLOR COMMENTS AF-1 ALUMINUM STOREFRONT FRAME ANODIZED BLACK V.I.F. CAB-2 UPPER WALL CABINET PLAM CABINETRY W/ 3MM EDGE BANDING CCF-1 CAST-IN-PLACE CONCRETE FOUNDATION SEE STRUCTURAL CSB-1 PRECAST CONCRETE SPLASH BLOCK TBD BY MANUFACTURER EE-1 ELECTRICAL SERVICE EQUIPMENT DESIGN / BUILD BY SUB CONT. EF-1 ELECTRICAL LIGHT FIXTURE SEE 1/LIGHTING PLAN FOR CUT CHEET EQ-10 SMOKE CONTAINMENT SYSTEM SMOKE GUARD M200 COORDINATE W/ ELEVATOR SUPPLIER FCP-1 HORIZONTAL FIBERCEMENT LAP SIDING HARDI LAP SIDING - WOODTONE, MOUNTAIN CEDAR FCP-2 VERTICAL FIBERCEMENT PANEL SIDING - 4X8 HARDI PANEL - SMOOTH FINISH, COUNTRY LANE RED FCP-3 1X3 FIBERCEMENT TRIM HARDI TRIM - WOODTONE, MOUNTAIN CEDAR HPS-2 ACCESSIBLE VAN PARKING SIGNAGE SEE DETAIL X/XX.X INSTALL PER ANSI REQUIREMENTS ME-1 MECHANICAL EQUIPMENT SUPPLY, PAINT TO MATCH SIDING SEE MECHANICAL DRAWINGS ME-2 MECHANICAL EXHAUST VENT COVER, PAINT TO MATCH SIDING SEE MECHANICAL DRAWINGS ME-3 MECHANICAL EXHAUST VENT COVER, DRYER VENT, COLOR TO MATCH SIDING COLOR SEE MECHANICAL DRAWINGS MWP-1 1-1/4" x 1/4" CORRUGATED METAL PANEL BRIDGER STEEL MWP-4 RTU SCREENING CITYSCAPES ENVISOR 35 VERTICAL STYLE USING FLAT RIB PANELS, COLOR TO MATCH WALL PANELS. ATTACH DIRECTLY TO RTU PLF-10 PLUMBING ROOF DRAIN ROOF DRAIN, SEE PLUMBING DRAWINGS RA-8 WALL SCUPPER BOX DOWNSPOUT TBD DOWNSPOUT, PROVIDE HEAT TAPE FULL LENGTH SFG-1 STOREFRONT GLASS V.I.F. SMC-1 PRESINISH BRAKE METAL CAP COLOR TO MATCH ADJACENT WALL FINISH COLOR TBD SRB-1 SOUND REDUCTION BOARD SSB-1 STRUCTURAL STEEL BEAM TBD SEE STRUCTURAL DRAWINGS SSD-1 STRUCTURAL STEEL DECKING GALV. PAN DECKING SEE STRUCTURAL DRAWINGS WC-1 DECK WALL CAP - WOOD 2X6 SHAPED WCD-1 WOOD COMPOSITE DECKING TREX 6/4" X 5-1/2" COMPOSITE WOOD DECKING, W/ 3/8" GAPS