Loading...
HomeMy WebLinkAboutSP00 - COVER SHEET 05-13-20SS SS SS SS C. O . C. O . SS C. O . C. O . C. O . C. O . D W D W D W D W D W D W D W D W EQ - 1 0 E Q - 9 U P U P U P U P U P U P U P U P D W D W D W D W D W D W U P U P RA MP U P OWNER: LAND LINK LLC P.O.BOX 11811 BOZEMAN, MT 59719 (406) 579-9275 CONTACT: CHRIS FORTIN ARCHITECT: BECHTLE ARCHITECTS 4515 VALLEY COMMONS DRIVE #201 BOZEMAN, MT 59718 (406) 585-4161 CONTACT: SCOTT BECHTLE CIVIL ENGINEER: C&H ENGINEERING 1091 STONERIDGE DR. BOZEMAN, MT 59718 (406) 585-1115 CONTACT: MATT HAUSAUER PROJECT DIRECTORY STRUCTURAL ENGINEER: AE DYNAMICS 37 SPANISH PEAK DR. BOZEMAN, MT 59718 (406) 763-6375 CONTACT: SCOTT HIGGINBOTHAM LANDSCAPE ENGINEER: WGM GROUP 5 WEST MENDENHALL ST. STE# 202 BOZEMAN, MT 59715 (406) 728-4611 CONTACT: LESSA RACOW MECHANICAL ENGIEER: SE ENGINEERING P.O. BOX 10776 BOZEMAN, MT 59719 (406) 600-8796 CONTACT: BILL EDDEN PROJECT SITE: ANNIE SUB PH 2, S02, T02 S, R05 E, LOT 5B, ACRES 1.5387, PLAT J-204-A CODE INFORMATION: APPLICABLE CODES: (STATE OF MONTANA) -INTERNATIONAL BUILDING CODE, 2018 EDITION -INTERNATIONAL RESIDENTIAL CODE, 2018 EDITION -UNIFORM PLUMBING CODE, 2018 EDITION -INTERNATIONAL MECHANICAL CODE, 2018 EDITION -INTERNATIONAL FUEL GAS CODE, 2018 EDITION -NATIONAL ELECTRICAL CODE, 2014 EDITION -INTERNATIONAL ENERGY CONSERVATION CODE, 2012 EDITION -NFPA 70, 2014 EDITION ZONING: R4, HIGH DENSITY MULTI FAMILY 25 UNITS (47 TOTAL BEDROOMS) (MIN 8 DWELLING UNITS PER ACRE) **NO AFFORDABLE HOUSING PROVIDED **PARKLAND IN SUBDIVISION PROVIDED BY ROSE PARK FIRE SPRINKLERS: YES ALL BUILDINGS BUILDING SETBACKS: NORTH 15' EAST 15' SOUTH 15' WEST 20' BUILDING AREA: 7-SERIES: 16506 SF 18 UNITS: 9,721 SF TOTAL: 47,796 SF PARKING: LOT 5C 22 UNITS X 2 = 44 3 UNITS X 1.5 = 4.5 REQUIRED: 48 PROVIDED: ON LOT 36 ON STREET 7 AT ROW HS 14 TOTAL: 57 OVERALL PROJECT INFORMATION RESIDENTIAL PEAK LOADING 7-SERIES: 240 GAL/HR 18 UNITS: 720 GAL/HR PROJECT SITE TSCHACHE LN OAK ST. N. 2 7 T H A V E . VICINITY MAP PROJECT SITE: 1595 N. 25TH AVE. ANNIE SUB PH 2, S02, T02 S, R05 E, LOT 5B, ACRES 1.5378, PLAT J-204-A CODE INFORMATION: FIRE SPRINKLERS: YES BUILDING CONSTRUCTION TYPE: VB BUILDING OCCUPANCY TYPE: R-2 ALLOWABLE BUILDING HEIGHT: 34 FEET ACTUAL BUILDING HEIGHT: 34 FEET BUILDING AREA: MAIN LEVEL: 9,197 SF SECOND LEVEL: 9,069 SF THIRD LEVEL: 9,069 SF TOTAL: 27,335 SF LIVABLE AREA: MAIN LEVEL: 7,919 SF SECOND LEVEL: 7,919 SF THIRD LEVEL: 7,919 SF TOTAL: 23,757 SF 18 UNIT PROJECT SITE: 1585 N. 27TH AVE. ANNIE SUB PH 2, S02, T02 S, R05 E, LOT 5B, ACRES 2.2612, PLAT J-204-A CODE INFORMATION: FIRE SPRINKLERS: YES BUILDING CONSTRUCTION TYPE: VB BUILDING OCCUPANCY TYPE: R-2 ALLOWABLE BUILDING HEIGHT: 42 FEET ACTUAL BUILDING HEIGHT: 37 FEET INDIVIDUAL UNIT AREA: UNIT 1 LOWER LEVEL: 313 SF MAIN LEVEL: 760 SF UPPER LEVEL: 838 SF GARAGE: 449 SF TOTAL: 2360 SF INDIVIDUAL UNIT AREA: UNIT 2 (4 UNITS) LOWER LEVEL: 312 SF MAIN LEVEL: 759 SF UPPER LEVEL: 837 SF GARAGE: 449 SF TOTAL: 2357 SF INDIVIDUAL UNIT AREA: UNIT 3 LOWER LEVEL: 312 SF MAIN LEVEL: 760 SF UPPER LEVEL: 838 SF GARAGE: 451 SF TOTAL: 2361 SF INDIVIDUAL UNIT AREA: UNIT 4 LOWER LEVEL: 310 SF MAIN LEVEL: 760 SF UPPER LEVEL: 838 SF GARAGE: 449 SF TOTAL: 2356 SF OVERALL BUIDLING AREA: LOWER LEVEL: 2183 SF MAIN LEVEL: 5316 SF UPPER LEVEL: 5862 SF GARAGE: 3145 SF TOTAL: 16506 SF OVERALL LIVABLE AREA: LOWER LEVEL: 2136 SF MAIN LEVEL: 4769 SF UPPER LEVEL: 5274 SF TOTAL: 12179 SF 7-SERIES AREA OF LOT 5B = 2.2620 ACRES or 67,024 SQ. FT. ESTIMATED FLOOR AREA = 27,757 SQ. FT. (18 UNIT) 13,361 SQ.FT. (7 SERIES) FLOOR AREA RATIO = (27,757 + 13,361) / 67,024 = 0.6107 FLOOR AREA RATIO R-4 RESIDENTIAL 2 BEDROOM UNITS = 1 SPACE / BEDROOM 1 BEDROOM UNITS = 1.5 SPACES / BEDROOM 7 SERIES: 2 BR (7) = 14 SPACES 18 UNIT: 2 BR (15) = 30 SPACES 1 BR (3) = 4.5 SPACES REQUIRED: 48 SPACES PROVIDED: 50 SPACES (2) ACCESSIBLE BIKE RACKS REQUIRED 10% OF 50 = 5 BIKE RACKS PROVIDED = 7 PARKING CALCULATIONS OPEN SPACE CALCS PRIVATE OUTDOOR SPACE: REQUIRED: 25 UNITS X 150SF = 3,750SF PROVIDED: 18-UNIT; 18 PRIVATE DECKS 2,502 SF / 2 = 1,251SF 7-UNIT;(3) PRIVATE DECKS PER UNIT (7 UNITS X 189) 1,323 SF / 2 = 661.5SF 1,912.5 SF P.D. + 2,056 SF SHARED = 3,968.5 HARDSCAPE: 33,293 SF BUILDING FOOT PRINT: 13,835 SF LANDSCAPE: 19,896 SF THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED BY BECHTLE ARCHITECTS WITH FULL KNOWLEDGE THAT THE CITY OF BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 1973, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOW AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILAR FEDERAL, STATE, OR LOCAL LAWS, THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. ADA CERTIFICATION LOT COVERAGE LOT 5-B: 67,024 TOTAL SF HARDSCAPE: 33,293 SF (49%) BUILDING FOOT PRINT: 13,835 SF (21%) LANDSCAPE: 19,896 SF (30%) LOT 5-B: 67,024 TOTAL SF 18-UNIT: 9,197 SF (14%) 7-SERIES: 4,638 SF (7%) BUILDING FOOT PRINT: 13,835 SF (21%) HARDSCAPE: 33,293 SF (49%) LANDSCAPE: 19,896 SF (30%) GENERAL SP00 COVER SHEET 05/13/20 SP01 OVERALL SITE PLAN 05/13/20 SP02 SITE SECTION 03/03/20 SP03 ADDRESSING PLAN 05/13/20 BOZEMAN, MONTANA PALISADES MULTI-FAMILY An y u n a u t h o r i z e d r e p r o d u c t i o n o r u s e o f t h i s i n f o r m at i o n w i t h o u t t h e e x p r e s s e d w r i t t e n c o n s e n t o f B e c h tl e A r c h i t e c t s i s a v i o l a t i o n o f U . S . c o p y r i g h t l a w s. C o p y r i g h t © 2 0 1 8 B e c h t l e A r c h i t e c t s JOB: 45 1 5 V a l l e y C o m m o n s D r i v e # 2 0 1 Bo z e m a n , M T 5 9 7 1 8 40 6 . 5 8 5 . 4 1 6 1 p h 4 0 6 . 5 8 5 . 6 9 1 9 f a x B E C H T L E A R C H I T E C T S 5/ 1 4 / 2 0 2 0 3 : 1 8 : 4 0 P M PA L I S A D E S MU L T I - F A M I L Y BO Z E M A N , M O N T A N A 2002 SP00 COVER SHEET SITE PLAN RC MAR. 3, 2020 CIVIL C1.0 OVERALL SITE PLAN 05/13/20 C2.0 SITE GRADING & DRAINAGE PLAN 05/13/20 C3.0 CIVIL DETAILS 05/13/20 LANDSCAPE L1.0 LANDSCAPE COVER SHEET 05/13/20 L1.1 PLANTING PLAN SCHEDULE 05/13/20 L1.2 PLANTING DETAILS, MATERIAL SCHEDULE, NOTES 05/13/20 L2.1 IRRIGATION PLAN 05/13/20 L2.2 IRRIGATION SCHEDULE & NOTES 05/13/20 L2.3 IRRIGATION DETAILS 05/13/20 L2.4 IRRIGATION DETAILS 05/13/20 ARCH 18 UNIT SP20 COVER SHEET 05/13/20 SP21 MAIN FLOOR PLAN 05/13/20 SP22 SECOND FLOOR PLAN 05/13/20 SP23 THIRD FLOOR PLAN 05/13/20 SP24 ROOF PLAN 05/13/20 SP25 EXTERIOR ELEVATIONS 05/13/20 SP26 EXTERIOR ELEVATIONS 05/13/20 SP27 COLOR ELEVATIONS 05/13/20 SP28 COLOR ELEVATIONS 05/13/20 ARCH RH 7-SERIES SP60 COVER SHEET 05/13/20 SP61 1ST FLOOR OVERALL PLAN 05/13/20 SP62 2ND FLOOR OVERALL PLAN 05/13/20 SP63 3RD FLOOR OVERALL PLAN 05/13/20 SP64 ROOF PLAN 05/13/20 SP66 EXTERIOR ELEVATIONS 05/13/20 SP67 EXTERIOR ELEVATIONS 05/13/20 SP68 COLOR ELEVATIONS 05/13/20 SP69 COLOR ELEVATIONS 05/13/20 SP70 PERSPECTIVES 05/13/20 DRAWING SHEET INDEX REVISION SCHEDULE No. Description Date 1 SPRC 5.13.20 1 5.13.20