Loading...
HomeMy WebLinkAboutResponse to Concept DRB Comments - 03 20 2020Page 1 of 5 February 3, 2020 Joe Church 1422 Delgany Street, Suite LL1 Denver, CO 80202 RE: Yellowstone Orthodontics at Bozeman Gateway, Concept Review, Application 20012 Project Description: This is a Conceptual Review application for advice and comments on a proposed 3753 square foot, single story orthodontics office within the Bozeman Gateway PUD. Project Location: Block 7, Lot 4 Bozeman Gateway PUD Ph. 3, S14, T02 S, R05 E We hope that these notes and suggestions assist you with the design and review of this potential future project. Please note that comments are preliminary and based on information provided. While we attempt to identify all issues during a conceptual review, please keep in mind that there may be other issues that arise during the formal review. We appreciate your patience in the review process. All references below to Sections of the Bozeman Municipal Code. If you have any questions or concerns or would like to set up a meeting, please do not hesitate to contact me at 406-582-2297. Sincerely, Sarah Rosenberg, Associate Planner Department of Community Development CC: Fillmore Properties, 208 N. 11 th Avenue, Bozeman, MT 59715 Page 2 of 5 Planning Division, Sarah Rosenberg, srosenberg@bozeman.net , 406-582-2297 1. The formal application of this project will require review by the Design Review Board. JoeArchitect: Acknowledged 2. Like the rest of the Bozeman Gateway development that have changed the trails to concrete rather than gravel fines, staff recommends that the trail along the eastern portion be constructed as concrete. Prior to occupancy of the building, the trail must be constructed. JoeArchitect: Trails description modified to be identified as concrete; see C3.2 3. Per the Conditions of Approval from the Bozeman Gateway PUD, file number Z-05217, number 41, office buildings 3, 4, and 5 in phase 3 must be rotate to front onto Garfield Street. This lot is required to meet this condition of approval and requires a pedestrian entrance from Garfield and BMC 38.520.040.B which states that all buildings much feature pedestrian connections to a sidewalk. JoeArchitect: Acknowledged; direct pedestrian access provided from W Garfield sidewalk to south-facing building entrance. 4. Lot Z Site Plan should to be complete prior to this site plan in order to provide appropriate emergency access. If it will not be complete prior to this project, an emergency access needs to be approved by the Bozeman Fire Department to provide appropriate emergency access. TD&H: It is understood that the Bozeman Gateway Site Z project will be installed first, but we have added a temporary fire access road on civil sheet C3.5. 5. BMC 38.510 Block Frontage. a. Ensure that the facades meet transparency requirements for mixed block frontage (38.510.030.C) JoeArchitect: Confirmed; transparency summary provided on sheet A 3.0 b. There must be a building entrance that faces Garfield Street. JoeArchitect: Confirmed; south-facing entrance provided with direct pedestrian access from W Garfield sidewalk c. Ensure that weather protection is provided over primary entries. JoeArchitect: Confirmed; required weather protection provided over both south and west entries 6. BMC 38.520 Site Design . a. Ensure that the crosswalks across the parking lot are contrasting materials. TD&H: Confirmed; concrete crosswalk located within asphalt parking lot located on sheet C3.2 Page 3 of 5 b. There must be connection to the adjacent trail to the east. TD&H: Sidewalk along south edge of parking lot reconfigured to include connection to trail along east edge of property. c. Pathways that are adjacent to parking require an additional two feet of walkway. The pathway in front of the parking spaces does not meet this standard. TD&H: Pathways have been modified to comply d. All pathways on site must be a minimum of five feet. TD&H: Pathways have been modified to comply e. Ensure that there is three feet of landscaping between the building and sidewalk. There is three feet separation between the north elevation corner and the sidewalk, however, there needs to be landscaping. TD&H: Planting plan modified to provide landscaping between north corner of building and sidewalk f. There should be appropriate pedestrian circulation to the service enclosure. TD&H: Service enclosure configuration modified to provide pedestrian circulation. g. Per 38.520.070, the sides and rear of the service enclosure must be screened with landscaping at least five feet. TD&H: Planting plan modified to provide required landscape screening 7. BMC 38.530 Building Design. a. Mirrored glass is prohibited. JoeArchitect: Acknowledged; no mirrored glass proposed. b. The north elevation contains a blank wall. See Section 38.530.070 for blank wall treatments and standards. JoeArchitect: Planting plan modified to comply per section 38.530.070.C.2 8. BMC 38.540 Parking. a. Provide parking calculations based on parking requirements for non-residential uses per 38.540.050-3. JoeArchitect: Required parking summary including on sheet A 1.0. b. Bicycle parking is required at 10% of the required parking. JoeArchitect: Acknowledged; bicycle parking capacity of two is required; six provided Page 4 of 5 9. BMC 38.550 Landscaping. a. Landscaping performance points are no longer a standard, however, there are new mandatory landscaping provisions. TD&H: Acknowledged b. There must be 75% or greater drought tolerant species as defined by the Montana Nursery and Landscape Association’s Drought Tolerant Plants for Montana Landscape. TD&H: Calculation added to sheet L1.0 c. Parking lots with 15 or more parking spaces must have a minimum of 20 square feet of landscaping. This needs to be calculated on the landscape plan. TD&H: Calculation added to sheet L1.0 d. There must be one large canopy tree for each 50 feet along the eastern trail. TD&H: East property line is 167.40 feet, requiring 3.348 large trees; 4 large trees provided 10. BMC 38.570 Lighting. a. Elevations displaying footcandles and lighting must be provided with formal submittal. JoeArchitect: Elevation photometric included on revised PH101 Engineering Division, Anna Russell, arussell@bozeman.net , 406-582-2281 1. See attached memo Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235 1. Need a minimum of ten foot clear opening measured from door jamb to door jamb JoeArchitect: Service enclosure modified to comply; see sheet A 1.0 2. Each refuse enclosure door must open a minimum of 180 degrees. JoeArchitect: Service enclosure modified to comply; see sheet A 1.0 These Divisions did not provide comment. Contact reviewers directly with individual questions. 1. Building Division; Bob Risk brisk@bozeman.net, 406-582-2377 2. NorthWestern Energy; Cammy Dooley, cammy.dooley@northwestern.com 3. Fire Department; Scott Mueller, smueller@bozeman.net , 406-582-2386 4. Parks and Recreation; Addi Jadin, ajadin@bozeman.net, 406-582-2908 5. Sustainability Division; Natalie Meyer, nmeyer@bozeman.net, 406-582-2317 6. Water Conservation; Jessica Ahlstrom, jahlstrom@bozeman.net, 406-582-2265 Page 5 of 5 7. Stormwater Division; Kyle Mehrens, jkmehrens@bozeman.net, 406-582-2270 8. Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-3200 9. Forestry Division; Alex Nordquest, anordquest@bozeman.net, 406-582-3205