HomeMy WebLinkAboutIcon Minor Subdivision Stormwater Facilities Maintenance 040918 July 25, 2017 Updated April 9, 2018 Project No. 17007.02 STORM DRAINAGE FACILITY MAINTENANCE PLAN FOR ICON APARTMENT HOMES AT FERGUSON FARM BOZEMAN, MONTANA OVERVIEW NARRATIVE The purpose of this maintenance plan is to outline the necessary details needed to determine who is responsible for the maintenance of the facilities, when the facilities need to be maintained and who owns the storm drainage facilities. The City of Bozeman Design Standards and Specifications Policy , dated March 2004. The site stormwater improvements have been designed with the intent to meet the current City of Bozeman drainage regulations for the entire site to the extent feasible. Specific site information and criteria are described below: I. Ownership of all facilities Public access easements and public city park: The street public access easements and the city park access easement will include ADS StormTech chamber infiltration systems, inlets, and storm drain piping. The City of Bozeman will own all the stormwater facilities within their easements except for the ADS StormTech chamber infiltration systems. The Bozeman Apartment Group, LLC will own all retention/detention systems within the public access easements and public city park. Apartment Community: Bozeman Apartment Group, LLC will be own all stormwater facilities, including the ADS StormTech chamber systems, pervious pavers, dry wells, inlets and storm drain piping within Lot 3A of Minor Subdivision 365 that is not within the public access easements. II. Inspection Thresholds for Cleaning ADS Chamber System: V:17007.02_SD Maintenance Plan 2 (03/07/18) SH/JL If average depth of sediment exceeds 3 inches, clean ADS Chamber System. Refer to Isolator Row Maintenance Plan attached. Pervious Pavers: If average depth of sediment exceeds 2 inches, clean paver system. Refer to PaveDrain specifications attached. Dry Wells: If sediment in sump exceeds 5 inches or grate is more than 25% clogged with debris, clean grate and/or structure. Storm Drain Inlets and Manholes: If sediment in sump exceeds 5 inches or grate is more than 25% clogged with debris, clean grate and/or structure. Storm Drain Piping: If sediment in sump exceeds 2 inches, clean pipe. III. Cleaning: ADS Chamber System: To clean ADS Chamber Systems used the JetVac process outlined in the Isolator Row Inspection/Maintenance plan attached. PaveDrain: To clean PaveDrain use an approved vacuum outlined in the PaveDrain specifications attached. Nearby Owner of Vacuum Head: David – Rocky Mountain Super Vac 73 Morning Glory Lane Kalispell, MT 59901 406-257-4639 Manholes, Inlets, Dry Wells: To clean grate of structure, remove and dispose of debris clogging the grate. To clean structure, use catch basin vacuum to remove sediment and debris. Pipes: To clean pipes, flush pipe at inlet structure and ensure that debris is captured at outlet structure and is removed. IV. Schedule: ADS Chamber System: Inspection: Every 6 months Vacuum Manholes/Chambers: Every 5 years or as needed based on inspection Note: Refer to Isolator Row Maintenance Plan attached. Pervious Pavers: Inspection: Every 6 months Vacuum pavers every 5-7 years or as needed based on inspection. Note: PaveDrain specifications attached. V:17007.02_SD Maintenance Plan 3 (03/07/18) SH/JL Dry Wells: Inspection: Every 6 months Vacuum Drywells: Every 5 years or as needed based on inspection Storm Drain Inlets and Manholes: Inspection: Every 6 months Vacuum Inlets/Manholes: Every 5 years or as needed based on inspection Storm Drain Piping: Inspection: Inspect inverts and outlet inverts every 6 months Flush pipes every 5 years or as needed based on inspection and condition of inlet or manhole. V. Responsible Party: Public access easements and public city park: The City of Bozeman will be responsible for the inspection and maintenance of the stormwater inlets, manholes and pipes within their easements. Apartment Community: Bozeman Apartment Group, LLC will be responsible for all stormwater facilities located within Lot 3A of Minor Subdivision 365. And will be responsible for maintaining any ADS StormTech Chambers within the public access easements. This includes the chamber system designed to retain the deficient volume from the Ferguson Farm subdivision to the south.