Loading...
HomeMy WebLinkAboutBSD7 Comment Icon Apartment Homes_120319 _______________________________________________________________________________________________________ December 3, 2019 Lauren Waterton, AICP Sanderson Stewart 106 East Babcock St Bozeman, MT 59715 Via email: lwaterton@sandersonstewart.com Subject: Icon Apartment Homes at Ferguson Farms Legal Description: Being an Amended Plat of Lot 3A, Minor Subdivision No. 365 Situated in the SW ¼ of Section 10, T. 2 S., R. 5 E., P.M.M. In the City of Bozeman, Gallatin County, Montana Dear Ms. Waterton, Referencing your email received November 4, 2019 concerning the evaluation of the subject subdivision: Bozeman Public Schools would expect that the creation of 336 apartment units could generate the following number of students. ¨ Pre-K to 5th 20 Students ¨ 6th to 8th 10 Students ¨ 9th to 12th 13 Students As of this date, the proposed development will be in the Hyalite Elementary School, Sacajawea Middle School and Gallatin High School attendance areas. Our elementary schools are nearing capacity, and the added enrolment for the proposed development may likely necessitate the need for Elementary #9. This need would be dependent on the successful passage of a future bond initiative for the design and construction for the needed school. The recent addition and expansion at Sacajawea Middle School will accommodate the proposed enrolment increase at the middle school level, as will the development of Gallatin High School, which is currently underway and scheduled to open prior to the start of school in the Fall of 2020. Population growth and demographic shifts in the future may necessitate boundary realignments to existing schools, which could modify the designated attending schools. Similarly, if a designated school attendance area’s student population exceeds the school’s capacity, attendance at an alternate school may be required. Infrastructure, such as sidewalks, should be constructed for the entire project irrespective of when actual homes are developed to provide a Safe Route to School pathway for students to safely traverse the proposed developed and existing roadways. Our existing bus system can accommodate the estimated number of additional students. Please let us know if there are any changes to the proposed development as this could modify the above student projections. Todd Swinehart, PE Director of Facilities (406) 522-6009 todd.swinehart@bsd7.org Bozeman Public Schools 404 West Main, PO Box 520 Bozeman, MT 59771-0520 www.bsd7.org Sincerely, Todd Swinehart, PE cc: Steve Johnson, Deputy Superintendent of Operations – Bozeman Public Schools Douglas Kellie, Transportation Coordinator – Bozeman Public Schools