From: tims@mad-eng.com
Sent: Tuesday, August 27, 2019 2:00 PM
To: 'Brian Krueger'
Cc: 'chris@mad-eng.com'
Subject: RE: Icon Apts - Previously approved master site plan
Thank you for the quick response, Brian. We will leave the layout as-is for our site plan submittal.
-Tim
From: Brian Krueger<BKrueger@BOZEMAN.NET>
Sent:Tuesday,August 27, 2019 1:41 PM
To: 'tims@mad-eng.com'<tims@mad-eng.com>
Cc: chris@mad-eng.com
Subject: RE: Icon Apts-Previously approved master site plan
Tim,
No.The master plan vests the overall layout to the previous version of the code. If changes/mods are proposed to the
master site plan,they would be reviewed under the current provisions. I hope that helps.
Brian Krueger I Development Review Manager,Community Development
City of Bozeman 120 East Olive St.I P.O.Box 1230 1 Bozeman,MT 59771
406.582.22591 bkrueger@bozeman.net I www.bozeman.net
From:tims@mad-ene.com <tims@mad-eng.com>
Sent:Tuesday,August 27, 2019 9:40 AM
To: Brian Krueger<BKrueger@BOZEMAN.NET>
Cc: chris0mad-ene.com
Subject: Icon Apts- Previously approved master site plan
Hello Brian,
Madison Engineering has been retained to work on the site plan submittal for Phase 2 of the Icon Apartment project
located on Babcock and Resort. Sanderson Stewart had previously submitted the Master Site Plan for Phase 1 and 2,
which was approved under the old code. Will the submittal of Phase 2 site plan be required to follow the new code?
Below are a few specific new code items that will affect the Phase 2 layout and require changes to be made to the
existing approved Master site plan if the new code applies to this project.
• Section 38.520.040.11)which requires internal sidewalk width of T where parking spaces are adjacent to the
sidewalk.
• Section 38.510.030.J which requires a 10' setback between internal sidewalks and the face of the residence.
• Section 38.520.070.C.2 which requires the sides and rear of dumpster enclosures to be screened with
landscaping at least five feet wide in locations visible from the parking lot and paths.
Thank you,
Tim Staub,PE
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
i
tims@mad-eng.com
From: tims@mad-eng.com
Sent: Wednesday, December 11, 2019 3:40 PM
To: 'Brian Krueger'
Subject: RE: Icon Phase B
That is helpful.Thanks, Brian.There are 5 different building types proposed on the Master Site plan. All five types are
used on Phase A and only 4 of them are used on Phase B. So there are no new building types with this site plan
application. I will include this email in my submittal to address that with the site plan submittal.
Thanks,
Tim
From: Brian Krueger<BKrueger@ BOZEMAN.NET>
Sent:Wednesday, December 11, 2019 3:24 PM
To: 'tims@mad-eng.com'<tims@mad-eng.com>
Subject: RE: Icon Phase B
Tim,
Did the master plan approval include building elevations for phase 2 or just for phase 1? If the elevations and floorplans
were not included for phase 2 there would not have been an entitlement issued for them via the master plan. If they
were not entitled you would have to provide the information related to the building including transparency as we would
review them against current standards.
Development Review Manager,Community Development
City of Bozeman 120 East Olive St.I P.O.Box 1230 1 Bozeman, MT 59771
406.582.2259 1 bkrueger@bozeman.net I www.bozeman.net
From:tims@mad-eng.com <tims@mad-eng.com>
Sent:Wednesday, December 11, 2019 8:05 AM
To: Brian Krueger<BKrueger@BOZEMAN.NET>
Subject: Icon Phase B
Hi Brian,
I am going through the SP1 form to ensure I have everything for the Icon Phase B site plan submittal (I plan to submit Jan
7, 2020). Given your email response back in August about how this site is vested to the old code requirements because
of its Master Site Plan approval under the old code does that mean we submit an old SP1 form?One of the new
requirements on the new SP1 form is transparency calculations on architectural drawings. Would that apply to this
submittal given it is vested under the old code before this requirement?
What are your thoughts?
Thanks,
Tim Staub, PE
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
406.586.0262 office