Loading...
HomeMy WebLinkAbout3_Concept Plan Review Response Narrative_01-20-2020 Icon @ Ferguson Farms – Phase B Concept Plan Review Narrative Page 1 of 5 Concept Plan Review Narrative Icon Apartment Homes at Ferguson Farm, Phase B - 19433 Planning Division; Brian Krueger 1. BMC 38.220.080 Site plan submittal requirements. The application must meet the PLS and SP1 form requirements. Setbacks for all property lines must be identified, annotated with dimensions and be shown correctly. Building projections and other weather protection encroachments must be clearly shown in relation to building foundations and property lines and setbacks on all plans. Annotate dimensions for all accesses, parking areas, drive aisles, open spaces, sidewalks, crosswalks, setbacks, buffers, etc. Response: The site plan shows building projections, property lines and setbacks. Sheet C1.1 – Utility Plan clearly shows all easements and setbacks and building projections labeled. 2. BMC 28.220.080 Site plan submittal requirements. Provide a well detail construction management plan with site plan application including proposed construction materials and spoils pile storage locations. Response: A construction management plan is included with this site plan application on Sheets C1.3 and C1.4. 3. BMC 38.220.080 Site plan submittal requirements. Provide all existing and proposed easements both public and private on a site plan exhibit. Response: Easements are shown on Sheet C1.1 – Utility Plan. Easements will be recorded with final subdivision plat (by others). 4. BMC 38.270.030.C Concurrent construction. Provide formal request and response to requirements with site plan application. Response: Concurrent construction is being requested with this site plan application. Formal request has been issued and response from Scott Mueller is pending. 5. BMC 38.520.070.C.1. Service areas, screening of ground related service areas. Trash enclosure (service area) locations and details not sufficient for review. Provide more details on proposed trash enclosure. Enclosure must comply with requirements to be architecturally integrated into building design among other requirements. Two story buildings exist and/or are planned around this site. All trash enclosures must include horizontal covers. Icon @ Ferguson Farms – Phase B Concept Plan Review Narrative Page 2 of 5 Response: A trash enclosure detail is provided with the architectural drawing set on Sheet A2-70. It is not proposed to be covered horizontally given this project is vested under the old code and the trash enclosures proposed with Phase B are consistent with the master site plan approval in design and location. 6. BMC 38.520.070.B and D Service areas. Location of power and gas entrances The utility entrances must be shown on all plans consistently and must meet standards. Power and gas entrances into building must be integrated into the building architecture and/or the site must provide adequate landscape screening area proposed. Per BMC 38.520.070.B.3 service areas must be screened structurally with the building and/or landscaping to screen must be provided. Clarify locations on all plans and provide compliance with this section. Response: Utility meters locations are called out (as keyed item “Z”) on the site plan, Sheet C1.0. Cammy Dooley of NorthWestern Energy has provided input as to transformer locations and utility easement locations within the Phase B project area. The architectural building elevations show the utility meters in a location consistent with the site plan. The landscaping plan shows the utility meters adequately screened. 7. PLS Form. General Comment. All plans must meet the plan and specifications requirements of form PLS including complete and thorough annotation on all plans, a well detailed plan sheet cover sheet, digital files and naming protocols and all other requirements. Response: The items submitted with this site plan application meet the standards outlined in the PLS form. Engineering Division; Anna Russell Property Boundary 1. Lot lines for the finalized subdivision currently being reviewed will need to be shown on the Site Plan. Response: The overall site plan, Sheet C0.1, shows the new subdivision lot lines. Stormwater 1. A Geotechnical report with groundwater levels will be required to verify all stormwater infrastructure, including the conversion of a detention basin to an underground chamber system. Response: The original geotechnical report dated September 2017 by TD&H Engineering is submitted with this site plan application. The only Icon @ Ferguson Farms – Phase B Concept Plan Review Narrative Page 3 of 5 underground retention system left to install in Phase B from the Master Site Plan is Chamber D (called “unit 21” in Sanderson Stewart’s original Storm Drainage Plan Design Report, March 2018). Chamber D is a Stormtech underground retention/infiltration system that replaces an existing retention pond at the corner of Resort and W. Babcock. Based on Test Pit #37 from the TD&H geotechnical report, ground water in that location was found on August 15, 2017 to be 5.8 feet below grade. Groundwater in Bozeman generally fluctuates 1 to 3 feet seasonally so a conservative estimate of high ground water at that location is 2.8 feet below grade. Existing grades at that location are approximately 4806.7’, which makes the approximate high groundwater elevation 4803.9’. The incoming 12-inch Reinforced Concrete Pipe that drains Resort Dr. into this system has an as-built invert elevation at its terminus of 4804.1’. Therefore, Chamber D is set to a bottom elevation of 4804.0’ and remains above the approximate high groundwater table. The remainder of the storm infrastructure in Phase B consists of pervious pavers at low points throughout the parking lot. Test pits in Phase B show an average depth to groundwater of 7.4 feet below grade, which corresponds to approximately 4.4 feet below grade during high groundwater season. The geotechnical report shows that the underlying native gravel layer, to which the pervious pavers tie into (with a base of 3/4” screened, clean, angular stone) is located approximately 3 feet below grade. In summary, the groundwater conditions on site should not affect the performance of the previously-designed Sanderson Stewart stormwater system in Phase B. Water 1. DSSP V.A.7. Every leg of a water main intersection shall have a valve. See connection to the water main in Babcock. Additional valves may be required to isolate the system for maintenance or breaks without impacting multiple buildings in the development. Response: A valve has been added to the point at which the water main extension connects to the existing main in W. Babcock. See Sheet C1.0. 2. The City’s GIS layer does not show two water mains in Resort Drive. Verify the utilities shown are correct. Response: Showing two water mains in Resort Dr. was a layer error in AutoCAD. This has been corrected with this site plan application. 3. Engineering recommends the applicant review their mechanical room sizes to verify that water service lines can be installed per City standards. Response: The mechanical rooms proposed with this site plan application have been adjusted per city standards. Icon @ Ferguson Farms – Phase B Concept Plan Review Narrative Page 4 of 5 Wastewater 1. The June 2019 analysis of the sewer capacity must be provided with the Site Plan submittal to verify there are no downstream constructions in the Valley West Sanitary Sewer Trunk Main downstream of the proposed project. If any downstream upgrades still need to be completed, a concurrent construction request for this the upgrade offsite will not be approved as it does not meet the requirements for concurrent construction in Bozeman Municipal Code 38.270.030.C. Response: The ‘Icon Apartments – Flow Monitoring and Analysis’ memo dated May 13, 2019 prepared by James Nickelson, P.E. of Morrison Maierle is included with this submittal. In addition, the approval letter dated July 2, 2019 by Robert Murray, P.E. of the City of Bozeman is included with this submittal. 2. The applicant must reimburse the cost of the sewer main upgrade in Babcock Street prior to Site Plan approval of this phase. Response: The applicant is aware of this condition of approval. Transportation 1. The widening of Babcock from Stafford Road to Ferguson Street will need to be completed and accepted by the City prior to Site Plan approval for this phase. Response: The applicant is aware of this condition of approval. The W. Babcock improvements were substantially completed in the fall of 2019. All that remains to be completed is pavement stripping and final grading and landscaping of the boulevards, retention basin and disturbed areas. Building Division; Bob Risk No Comment Fire Department; Scott Mueller No Comment Parks Department; Addi Jadin 1. A park plan must be provided with phase B site plan application. Response: Park landscaping drawings are provided with this site plan application. Icon @ Ferguson Farms – Phase B Concept Plan Review Narrative Page 5 of 5 Water and Sewer Division; John Alston No Comment Forestry Division; Alex Nordquest 1. BMC 38.550.050.E Street Trees – One large canopy tree for each 50-feet of total street frontage rounded to the nearest whole number is required. Acceptable large canopy shade trees for use in public rights-of-way are those accepted by the forestry department. Street trees must meet the arboricultural specifications and standards of chapter 16, article V, division 3. The forestry department, in cooperation with the city tree advisory board, publishes a pamphlet listing acceptable species and proper planting methods. Prior to planting street trees, a permit from the forestry department is required. Response: See landscape drawings included with this site plan application. 2. Provide appropriate street tree species along all street frontages at the required one per fifty foot interval outside of site vision triangles. Include a multiple species in each street frontage. Response: See landscape drawings included with this site plan application. NorthWestern Energy; Cammy Dooley 1. Coordinate with Northwestern Energy for: a. Provide transformer locations and 10-feet of separation. b. May need to provide interior setback private utility easements depending upon utility layout. Response: Cammy Dooley was contacted for transformer location approval and layout of interior utilities. See Sheet 1.1 – Utility Plan included with this site plan application. END OF NARRATIVE