Loading...
HomeMy WebLinkAbout0.2_Revision Narrative 04-29-20Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 1 of 7 Site Plan DRC Narrative Response Icon Apartment Homes at Ferguson Farm, Phase B - #20034 RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the development. 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Response: This is understood. REQUIRED CODE CORRECTIONS Planning Division; Jacob Miller 1. Please submit all revisions using Revisions and Corrections cover sheet. Submit a full set of drawings (2 large format and 1 11x17) with revisions clouded. Include a table of contents with all drawings and their date of creation/revision. Ensure that the electronic version includes a fully updated, complete application. Response: Revisions are clouded and the electronic application includes all revised plan sets. Due to COVID-19, physical plan sets are not being submitted at this time and can be provided at a later date. 2. BMC 38.320.030.C – Form and intensity standards - Building height. The maximum building height allowed in R-O for a roof pitch less than 3:12 is 34’. Building type E is shown as 38’6”. Please revise. Response: As shown on the revised Sheet A4-50 and additional Sheet A4-52, the height of the building as measured from the ground elevation to the top of the roof deck is 33’2”. Per City code requirements, parapets can extend a maximum for 4-ft above the above referenced elevation. As such, all parapets have been reduced in height to be a maximum of 4-ft for the Type E buildings. All other buildings were already under the building height maximum. 3. BMC 38.520.070 – Location and design of service areas and mechanical equipment. Roof mounted mechanical equipment. Building Type E shows HVAC on the roof which will require screening. If there is other roof mounted equipment please designate on the elevations and provide screening details. Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 2 of 7 Response: As shown on sheets A4-50 and A4-52, mechanical equipment is primarily being placed behind the tallest parapets on the Type E buildings. With an appropriate equipment stand, the equipment would sit 55” above the top of roof deck, maximum. In order to evaluate screening requirements, the applicant performed a site line study in order to determine the visibility of rooftop equipment on these buildings. As shown on Sheet A4-52, the equipment only sits approximately 7-inches above the tallest parapets on the building. Based on the site line study, the following determinations were reached: • When viewing from the long side of the building, a person would have to be over 300- ft from the face of the building to see any part of the equipment at the shorter parapet locations and over 828 feet away from the buildings at the taller parapet locations to see any part of the equipment. • When viewing from the short side of the building, a person would have to be over 183- ft from the face of the building to see any part of the equipment at the parapet locations. Based on the above site line distances, it would seem that rooftop equipment is appropriately screened. It is unlikely another viewing restriction would block the potentially 7-inches of equipment (maximum) from any the noted distances above. As such, applicant requests that the site line study provided be approved as acceptable for screening the equipment. 4. BMC 38.530.070 – Blank wall treatments – It appears on several of the elevations that blank wall treatments will be required. Provide dimensions illustrating that treatments will not be necessary or include appropriate design treatments. Response: Per conversation with Jacob Miller, blank wall treatments are not required as part of this submittal because the elevations provided were approved as part of the master site plan application for Icon Apartment Homes at Ferguson Farm. See correspondence below. Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 3 of 7 5. BMC 38.530.060 – Building materials – Due to the scale of this project a physical material color board will be required. Response: Per conversation with Jacob Miller on March 25, 2020 a physical color board will not be required at this time. See correspondence below. Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 4 of 7 Solid Waste Division; Russ Ward 1. The refuse enclosure will need to be covered. Response: See updated civil detail sheet C2.1. The refuse enclosure is now covered. Engineering Division; Anna Russell General 1. BMC 38.270.030.C Completion time for site development - A Concurrent construction request needs to be submitted along with associated phasing plans if the applicant intends to submit building permits prior to completion and acceptance of onsite infrastructure. Response: A concurrent construction request was submitted on January 27, 2020. It was approved by Scott Mueller on February 20, 2020 (see email exchange below). The concurrent construction application was also reviewed by Anna Russell with comments received on April 8, 2020. Slight revisions to the concurrent construction application were made and returned to Anna on April 16, 2020. The concurrent construction application is included with this resubmittal. Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 5 of 7 Water 2. BMC 38.410.130 - CILWR will need to be paid prior to building permits. Response: This is understood. A remaining balance of $87,000 is due for Phase B CILWR per the “Agreement for Bozeman Apartment Group, LLC Cash In Lieu of Water Rights” signed on April 19, 2018. 3. Although the water service line sizes are not called out in this plan set, the applicant is advised at this time that the mechanical room length for a 4” water service line is required to be a minimum of 11’-5”. At this time, Building types C and D have 9’ x 7’ riser rooms. When the Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 6 of 7 infrastructure plans are submitted, the Engineer will need to verify the water service diameters and that the rooms are large enough to fit the required lay lengths. Response: The following table summarizes the fire and water service sizes (diameters) for the building types within Phase B. These service sizes match the services proposed for Phase A. It should be noted that the 4-inch services will utilize 3-inch meter sets, which is allowed per City of Bozeman standards. As such, the configuration and size of the riser rooms was determined using a 3-inch meter set-up. When constructing Phase I, the sizes of the riser rooms within each building type was worked out with the City Utility Department to ensure each room provided adequate space. Since the fire riser rooms match the changes made on Phase I, the fire riser rooms are adequately sized. Table 1. Service sizes summary. Building Type Water service size (inches) Fire service size (inches) B 4 6 B-HC 4 6 C 2 6 D 2 6 E-S 4 6 Wastewater 4. The applicant must reimburse the cost of the sewer main upgrade in Babcock Street prior to Site Plan approval of this phase. Response: The applicant is aware of this condition of approval. Transportation 5. BMC 38.270.030.C Completion time for site development - The widening of Babcock from Stafford Road to Ferguson Street will need to be completed and accepted by the City prior to Building Permits for this phase. Response: The applicant is aware of this condition of approval. The W. Babcock improvements were substantially completed in the fall of 2019. All that remains to be completed is pavement striping and final grading and landscaping of the boulevards, retention basin and disturbed areas. 6. BMC 38.410.060.B Easements - Electrical Transformers need to be within a utility easement. See transformer in screen grab below located on the east side of Stafford north of Building 17. Icon @ Ferguson Farm – Phase B Site Plan DRC Narrative Response Page 7 of 7 Response: The transformers are now shown within utility easement bump outs on the site plan. Madison Engineering has coordinated with Sanderson Stewart to adjust the power easements shown on the final plat to include the bump outs for transformers. See updated sheets C0.1, C1.0, C1.1, C1.2. Parks and Recreation; Addi Jadin 1. Parks staff reviewed prior phases of Icon. At Master Site Plan, parkland for up to max of 12 du / acre was required and the appraisal value used was $1.23 per square foot. Based on the acreage of 15.58 acres, 3.74 acres of land was owed and equivalent of 1.87 acres as Cash-In- Lieu (CILP) which would have equaled $ 100,192.36. In addition, $37,312 was determined to be owed for the parking lost due to frontage reduction. So, 3.74 acres of land and $137,504.36 was required. Applicants proposed a combination of land, CILP, and Improvements in Lieu instead. The land provided was 1.61 acres resulting in a deficit of 2.13 acres of land. The cash equivalent to 2.13 acres was $114,122.84. So, the proposal was 1.61 acres land, $126,981.76 (as documented in commission memo from April 16, 2018) and resulting balance of $151,434.84 in Improvements in Lieu beyond basic improvements. The applicants have provided improvements significantly beyond $151,434.84 in their master plan design which commenced in Phase A. Despite the new CILP appraisal value that this phase would fall under (1.60 psf), no new CILP or IILP would be owed for Phase B. The total max up to 12 du/acre was required at the time of Master Plan and carried out with the construction of Phase A. Response: No response necessary. 2. Please correct the parkland tracking table to show that max of 12 du/acre was required at the time of Master Site Plan and no new parkland is required at Phase B. Response: The table has been updated. See updated drawing package Cover Sheet. END OF NARRATIVE