HomeMy WebLinkAboutC1.4_Cons. Route Map_01-21-2020 w
0
m
z
3
¢
w
SCALE
0 15' 30' 60'
1"=30'
z
D\d• Durston Rd.
>
Q
Toole St. NTq
!1\ * CHRIS G.
\ B
U VJ .10825
QN PE
� ,PS,oEAse E�'
E 12' 12'
CONSTRUCTION ROUTE O
� DRAWN BY: EWR
REVIEWED BY: CGB
St.
PROJECT ENGINEER:CGB
WIDE DESIGNED BY:CGB
Cascade
GATE
1
12
jBroadwater �
CONSTRUCTION ROUTE prune RAILING �A
endow; ® � �
Babcock St. Z o
CORNER
POST TOP BRACE CHAIN> RAIL POST FABRICLINK
O Q
' CONSTRUCTION ROUTE N
Im, I C) FEI C) 0
O 01
P4
>0 � ' 0 > 6
' PROJECT CD Q
LOCATION o���o400j
O ' ' O ® k�
o Fallon St.
c0 1 1 � 0
�j
i i BOTTOM SELF
Competition Dr, LL 0 RAIL NOTE: SUPPORTED
_ FENCE
Gran I e 1. CONTRACTOR MAY USE ROLL OFF
1f�'C�If� 1f1f CONTAINER AT HIS DISCRETION.
L Fallon St. c1.4 CONSTRUCTION TRASH[ENCLOSURE&MATERIAL STORAGE AREA
Q N.T.S.
O H
Gin( 1�4 �j ¢o
Q � � �
CONSTRUCTION MANAGEMENT PLAN
Valley Commons Dr.
1. CONTRACTOR SHALL PROVIDE BARRICADES AND WARNING DEVICES TO ENSURE THE SAFETY OF THE
PUBLIC AS WELL AS WORKERS.
2. NO TRENCHES SHALL BE LEFT IN AN UNSAFE CONDITION. ALL TRENCHES SHALL BE SECURELY
BARRICADED, PLATED OR FILLED IN BEFORE THE END OF EACH WORK DAY. OPEN TRENCHES SHALL NOT �1 W
`/�/�/ (� BE LEFT UNATTENDED. ®
J.S. aV V 191 1 / a u f f n e L In . 3. CONTRACTOR SHALL MAINTAIN SWPPP AT ALL TIMES. CIO® U
I 4. CONTRACTOR SHALL KEEP SITE CLEAN OF DEBRIS THAT MAY BLOW AWAY. b H
5. CONSTRUCTION TRASH ENCLOSURE AND MATERIAL STORAGE AREA TO BE LOCATED BY CONTRACTOR.
CONSTRUCTION ROUTE MAPSEE TRASH ENCLOSURE DETAIL ABOVE.
NTS 6. 40 CY ROLL OFF CONTAINER MAY BE USED IN LIEU OF TRASH ENCLOSURE BUT MATERIAL STORAGE _
AREA ENCLOURE MUST BE PROVIDED.
7. EXCAVATED MATERIAL SHALL BE STOCKPILED IN A SAFE CONDITION AND REMOVED FROM SITE AS SOON SHEET
AS PRACTICAL. CIA
ICON APARTMENTS
CONST.ROUTE
S PROJECT:19-113
DATE:JANUARY 21, 2020