HomeMy WebLinkAboutA3-42-Bldg E-S2 2nd. Floor Plan_1-21-20 UNIT TYPE KEY BUILDING LEGEND
FIRE EXTINGUISHERS INDICATESSLOPE F.P. FIBER CEMENT PANEL
ALL'A'UNITS v ❑ TRUSSES 2%MAX P.G. PAINTED GYP.SHEA RING
OX DOOR KEV PBOVECHAIR RAILAND
1 BEDROOM DESIGOION OF UNITS RE ER CEMENT PANEL BELOW
DESIGNATEDAS RE:CORRIDOR DETAIL
O WINDOW KEY ANSI TYPE'A' C.J. CONTROL JOINT
ALL'B'UNITS A(REFER TO SITE PLAN) IFLOI CEILING&
® METER LOCATIONS INDICATES HVAC WW
-2 BEDROOM -- CENTERLINE CONDENSING UNIT F.D.C. FIRE DEPARTMENT
(REFER TO SITE PLAN&MEP)
F.S.R.R. FIRE SPRINKLER
0 RADON PIPE RISER ROOM
ALL'C'UNITS s� 1 HR.FIRE BARRIER WALL - 1'-0"RECESS F.F. FINISH FLOOR
IIN CEILING B.F.F. BELOW FINISH FLOOR
-3 BEDROOM II g LOCATION OF STAGGERED L--U RE:1]/A2-00 B.F.C. BROOM FINISH,NON
-
STUD WALLS SLIP SEALED CONCRETE
GENERAL NOTES:
•UNITS LABELED ANSI'A'TO MEET ANSI A11].1-2009 FOR TYPE A(10031 DWELLING UNIT
REFER TO FHA AND ANSI SHEETS FOR ACCESSIBILITY REQUIREMENTS.
•ALL FIRST FLOOR DOOR HARDWARE TO BE LEVER HANDLE.
•CHANGES IN FLOORING SURFACE TO BE 1/4"MAX.,1/2"MAX.CARPET PILE THICKNESS.
•THRESHOLD AT DOORWAYS TO BE 1/4"MAX.OR 1/2"W/45 DEGREE BEVEL.
•MAXIMUM FORCE FOR PULLING OR PUSHING SHALL BE 5 LB/FT.
BETWEEN16LW8 FOR A FORWARMECHANISMS
OR SIDE APPROACH. MOUNTED
•GENERAL CONTRACTOR TO INSURE CONTROL,EXPANSION JOINTS IN ARCHITECTURAL FINISH ARE
COORDINATED WITH STRUCTURAL LOCATIONS.REFER TO MANUFACTURER FOR SPECIFIC
REQUIREMENTS PERTAINING TO MATERIAL USED.
•METER AND FSRR ARE LOCATED ON A BUILDING-BY-BUILDING BASIS,
REFERENCE SITE PLAN FOR LOCATIONS.
•BUILDINGS MAY FLIP ABOUT CENTER LINE OR ROTATE,REFER TO SITE PLAN
FOR BUILDING LOCATION AND ORIENTATION.
•UNIT PLANS MAYBE REVERSED OR ROTATED WITHIN BUILDING PLAN.REFER TO BUILDING PLAN
2 FOR UNIT LOCATION AND ORIENTATION.
•WALL MOUNTED SERVICE EQUIPMENT AND SERVICE LINES TO BE PAINTED TO MATCH BUILDINGS.
4-5 •FIRE EXTINGUISHERS ARE TO BE A MINIMUM 2A 1 OB:C CLASSIFICATION AND SHALL COMPLY WITH
NFPA 10 GUIDELINES.REFER TO PLANS FOR LOCATIONS.(REFERENCE DETAILS 17/A7-11,18/A7-11)
•ALL FIRST FLOOR DWELLING UNITS ARE TO MEET FHA AND ANSI'B'REQUIREMENTS UNLESS NOTED
OTHERWISE.REFER TO FHA AND ANSI SHEETS FOR MORE INFORMATION.
231'-1"
38'-0" 10'-0" 23'-8" 1 1/2" 38'-11" 10'-0" 38'-11" 1 1/2" 23%6" 10%0" 38%0"
13'-8" ❑ � BALCONY ALCONY a °
BALCONY BALCONY
° 14'-3" 42"GUARDRAIL - 1a-3'• °
BEDROOM BALCONY BALCONY BEDROOM
BEDROOM BEDROOM
-
BEDROOM BEDROOM LIVING ROOM
DRAI LIVING ROOM BEDROOM BEDROOM ING
2"GUARL LIVING ROOM
CLOSET LIVING ROOM BEDROOM BEDROOM CLOSET
' - - LIVING ROOM LIVING ROOM Al-2(b) �----------� CLOSET I
GLQBE Cl-2(a) Al-2(b) Q B3 b B3 b � Cl-2(a)
( ) CLOSET CLOSEfiO.M
( )
BATHROOM
ATHROOM UP ❑ ❑ 42"GUARDRAIL
❑ -- ❑ ❑ - El 0
THRO________ ________________ BATHROOM - BATH nKITrFlEN
_________________ ____________F-;_____, BATHR M ( i ___ ♦ ❑ ❑ATHROO a_______ ___ __�_CLOSETcUPCLOSETM �♦IFv O KITCHENBEDROOM O KITCHEN ' --- BEDROOM
KITCHENKITCHEN KITCHEN CLOSET BA HROOM CLOSET qO UP CLOSET ! CLOSET ---- R BATHROO
_ _
, ,
Nc ❑ ❑ ____________ __________ __________ _____________ _________ ❑ _____ _____ ________ ❑ '❑ M
o
BA HROOM ' d0 CLOSET CLOSET Op CLOSET CLOSET Ob '0' ATHR
KITCHEN
BEDROOM O KITCHEN �0 KITCHEN CDKITCHEN O KITCHEN O O
BEDROOM
B 00
KITCHEN
DOWN
CLOSET ♦/ i�I�' A OOM :- �I j�l l i♦� HROOi�;�_:, DOWN i�l _
-------- TIT❑ THRO ___ BATHROOMBATHROOM _________________ _- ❑ATHROO _____ _ _---- ___ -- CLOSET
i
❑ CLOSET
❑I 2"GUARDRAIL ❑I, -❑ 2"GUARDRAIL ❑'' -- GUARDRAIL ------
" --------- ❑ ❑ 42" ❑ O -
I'
----- B3(b) ! DLQBET II B3(b)
CLOSE n7_2 a Al-2(b) BEDROOM LIVING ROOM A�L
LIVING ROOM Cl-2(a) -
CLOSET 111 2( ) BEDROOM Al-2(b) CLOSET
LIVING ROOM
BEDROOM BEDROOM LIVING ROOM - LIVING ROOM
LIVING ROOM BEDROOM BEDROOM
BEDROOM In BEDROOM
BEDROOM - BALCONY BALCONY _ BEDROOM
14•4'
BALCONY BALCONY 4
BALCONY
BAITCQNY a
1z.-o" z-o
38'_0" 10'_0" 1 12" 38'_11" 101_0" 38'-11" 1 1/2" 23'-B" 10•_0" 38'_0"
231'-1"
1
4-SG
2BUILDING TYPE 'E-S2' SECOND FLOOR 05,014 SF.)
SCALE:1/8"=1'-O"
COPYRIGHT®HEDK Architects ALL RIGHTS RESERVED
z ICON APARTMENT HOMES DATE SHEET NUMBER
° AT FERGUSON FARM - PHASE B 01-21 -20
F�3OC
� SITE DEVELOPMENT
Cl PLANS A3 42
of-u-zo ARCHITECTS ^ PROJrE�CT
APARTMENTS IN BOZEMAN,MONTANA FOR 4202 BELTWAY DRIVE ADDISON,TX 75001 I 1 SC BUILDING'E-S2'
BOZEMAN APARTMENTS GROUP PHASE II, LLC. jxL 214.520.B878 hedk.com FLOOR PLANS