HomeMy WebLinkAboutA3-41-Bldg E-S2 1st. Floor Plan_1-21-20 UNIT TYPE KEY BUILDING LEGEND
FIRE EXTINGUISHERS INDICATES SLOPE F.P. FIBER CEMENT PANEL
ALL'A'UNITS v TRUSSES 2%MAX
P.G. PAINTED GYP.SHEATHING
X DOOR KEY ABOVECHAIq RAILAND
SYMBOL INDICATES FIBER CEMENT PANEL BELOW
1 BEDROOM LOCATION OF UNIT
DESIGNATEDAS RONROLJOITAIL
O WINDOW KEY (REFERANSITYPEWSITE
C.J. CONTROL JOINT
ALL'B'UNITS INDICATES
ES HVAC AN) FALLS),CEILING&
® METER LOCATIONS INDICATES HVAC W
-2 BEDROOM —- CENTERLINE CONDENSING UNIT F.D.C. FIRE DEPARTMENT
(REFER TO SITE PLAN&MEP)
F.S.R.R. FIRE SPRINKLER
o RADON PIPE RISER ROOM
ALL'C'UNITS a� I HR.FIRE BARRIER WALL F 1'-0"RECESS F.F. FINISH FLOOR
C
N I
-3BEDROOM >g CEILING B.F.F. BELOW FINISH FLOOR
LOCATIONOFSTAGGERED
L 17IA2-00
STUD WALLS B.F.C. BROOM FINISH,NON-
SLIP SEALED CONCRETE
GENERAL NOTES:
•UNITS LABELED ANSI'A'TO MEET ANSI A117.1-2009 FOR TYPE A 1003 DWELLING UNIT
REFER TO FHA AND ANSI SHEETS FOR ACCESSIBILITY REQUIRE EN S.
•ALL FIRST FLOOR DOOR HARDWARE TO BE LEVER HANDLE.
•CHANGES IN FLOORING SURFACE TO BE 1/4"MAX.,1/2"MAX.CARPET PILE THICKNESS.
•THRESHOLD AT DOORWAYS TO BE 1/4"MAX.OR 1/2"W/45 DEGREE BEVEL.
•MAXIMUM FORCE FOR PULLING OR PUSHING SHALL BE 5 LB/FT.
BETWEENROL FOR A FORWARMECHANISMS
OR SIDE APPROACH. MOUNTED
•GENERAL CONTRACTOR TO INSURE CONTROUEXPANSION JOINTS IN ARCHITECTURAL FINISH ARE
COORDINATED WITH STRUCTURAL LOCATIONS.REFER TO MANUFACTURER FOR SPECIFIC
REQUIREMENTS PERTAINING TO MATERIAL USED.
•METER AND FSRR ARE LOCATED ON A BUILDING-BY-BUILDING BASIS.
REFERENCE SITE PLAN FOR LOCATIONS.
•BUILDINGS MAY FLIP ABOUT CENTER LINE OR ROTATE,REFER TO SITE PLAN
FOR BUILDING LOCATION AND ORIENTATION.
•UNIT PLANS MAY BE REVERSED OR ROTATED WITHIN BUILDING PLAN.REFER TO BUILDING PLAN
2 FOR UNIT LOCATION AND ORIENTATION.
4-5 •WALL MOUNTED SERVICE EQUIPMENT AND SERVICE LINES TO BE PAINTED TO MATCH BUILDINGS.
•FIRE EXTINGUISHERS ARE TO BE A MINIMUM 2A 1 OB:C CLASSIFICATION AND SHALL COMPLY WITH
NFPA 10 GUIDELINES.REFER TO PLANS FOR LOCATIONS.(REFERENCE DETAILS 17/A711,18/A7-11)
•ALL FIRST FLOOR DWELLING UNITS ARE TO MEET FHA AND ANSI'B'REQUIREMENTS UNLESS NOTED
OTHERWISE.REFER TO FHA AND ANSI SHEETS FOR MORE INFORMATION.
231'-1"
38'-0" 10'-0" 23'-8" 1 1/2" 38'-11" 10'-0" 38'-11" 1 1/2" 23•-8" 10-0" '%,
❑ 11'-8" ❑ 714
12'-0"1; 13'-8" ° PATIO PATI ° 13'-8" §
PATIO � - PATIO
_ ❑ 14._3" 1W-3"T ❑
BEDROOM - PATIO PATIO
rBEEDROOM
G O D O BEDROOM
BEDROOM BEDROOM LIVING ROOM I G O
CLOSET LIVING ROOM BEDROOM - - BEDROOM CL S
CLOSET C 1 11_l 11 gar(b) LIVING ROOM =--__-- LIVING ROOM 4 Al-1 gar(b)i 1. \U
a
B3(a) CLOSET B3(a)
CLOSET
- _
ETH=ROOM C S T ❑ \
'❑ ❑' THRO
------- -- BATHROOM
♦�I �BATHR M -_-�----- BATHROOM -' -" � O ATHROO ---------------- li 'a
CLOSET i ', T O M 1 1�/♦I__' I I/♦I ♦I -
O < O i C N
BEDROOM ' i GT EI 10 KITCHEN KITCHEN O' KITCHEN O
f
n
BATHROOM I ° I � CLOSET � � 00 CLOSET LOS � T O--�� c ❑ ,❑ KITCHEN ( ) - __ _ __________ __________ —_—_--__ � ___ N �
--
i
KXXI
CLOSET i Op CLOSETCIO
FSTT
_ Q 1(I(
KITCHEN KITCHEN Q
TIRESTOP
TIRESTOP TIRESTOP BATHROOM BATHROOM -__• •I�-" T
❑ TIRESTOP TIRESTOP
__ IRESTOP
TIRESTOP ❑ ❑ ❑j O = TIRESTOP
11%10" 11'-2"
C1-garb) m Cl-gar(c)-FSRR
B3(a) CLOSET DLDBET B3(a)
Al-garb) 9
BEDROOM LIVING ROOM LIVING ROOM BEDROOM
E GARAGE
I
GARAGES GARAGE2 GARAGEI C G A 2 GARAGE2 GARAGEI ASSIGNABLE GARAGE2 GARAGES
DIRECTACCESS ASSIGNABLE ASSIGNABLE - IR T C S DIRECT ACCESS ASSIGNABLE - ASSIGNABLE N ASSIGNABLE
BEDROOM BEDROOM -
PATIO PATIO -
v v
v v v v
10'-0" 23-13" 1 1/2" 38'-11" 1U'-0" 38'-11" 1 1/2" 29•-8" 10._0" 38%0"
231'-1"
1
1 BUILDING TYPE B-ST FIRST FLOOR (15,014 SF.)
SCALE:1/8"=1'-0"
COPYRIGHT®HEDK Architects ALL RIGHTS RESERVED
z ICON APARTMENT HOMES DATE SHEETNUMBER
° AT FERGUSON FARM - PHASE B 01-21 -20
F E 3 OC
ClA R C H I T E C T S PROJECT A3-41
APARTMENTS IN BOZEMAN,MONTANA FOR 4202 BELTWAY DRIVE ADDISON,TX 75001 191 SC BUILDING'E-S2'
BOZEMAN APARTMENTS GROUP PHASE II, LLC. 214.520.B878 hedk.com FLOOR PLANS