HomeMy WebLinkAboutA3-12-Bldg B 2nd Floor Plan_1-21-20 UNIT TYPE KEY BUILDING LEGEND
ALL'A'UNITS �ry�y FIRE EXTINGUISHERS ❑ INDICATES
1 BEDROOM SLOPE F.P. FIBER CEMENT PANEL
BUSSES 2%MAX
P.G. PAINTED GYP.SHEATHING
X DOOR KEY ABOVE CHAIR HAIL AND
ALL'&'UNITS S MBOLINDICATES FIBER CEMENT PANEL BELOW
WINDOW HEY LOCATION OF UNIT RE: GENE R DETAIL
-2 BEDROOM O DESIGNATED AS
X ANSITYPEW C.J. CONTROL JOINT
ALL'C'UNITS (REFER TO SITE PLAN) IFLAOOR,CEILING&
® METER LOCATIONS INDICATES HVAC WW
-3 BEDROOM CONDENSING UNIT F.D.C. FIRE DEPARTMENT
-- CENTERLINE (REFERTO SITE PLAN MEP) CONNECTION
o RADON PIPE F.S.R.R. RIISER PRINROOMLER
>� 1 HR.FIRE BARRIER WALL D — 1'-0'RECESS F.F. FINISH FLOOR
I IN CEILING B.F.F. BELOW FINISH FLOOR
>3>S LOCATION OF STAGGERED L _3RE:17/A2-00
STUD WALLS — B.F.C. BROOM FINISH,NON-
SLIP SEALED CONCRETE
GENERAL NOTES:
•UNITS LABELED ANSI'A TO MEET ANSI A117.1-2009 FOR TYPE A 1003 DWELLING UNIT
REFER TO FHA AND ANSI SHEETS FOR ACCESSIBILITY REQUIRE EN S.
•ALL FIRST FLOOR DOOR HARDWARE TO BE LEVER HANDLE.
•CHANGES IN FLOORING SURFACE TO BE 1/4"MAX.,1/2"MAX.CARPET PILE THICKNESS.
•THRESHOLD AT DOORWAYS TO BE 1/4"MAX.OR 1/2"W/45 DEGREE BEVEL.
•MAXIMUM FORCE FOR PULLING OR PUSHING SHALL BE 5 LB/FT.
•ALL CONTROLS AND OPERATING MECHANISMS SHALL BE MOUNTED
BETWEEN 15"-48"FOR A FORWARD OR SIDE APPROACH.
GENERAL OR TO INSURE CONTROUEXPAINSN JOINTS IN ARHITECTURAL FNI
COORDIINAT TEED WTHSTRUCTURAL LOCATIONS.REFER IT°O MANUFACTURER FOR SPECIFIIC SH ARE
REQUIREMENTS PERTAINING TO MATERIAL USED.
•METER AND FSRR ARE LOCATED ON A BUILDING-BY-BUILDING BASIS.
REFERENCE SITE PLAN FOR LOCATIONS.
•BUILDINGS MAY FLIP ABOUT CENTER LINE OR ROTATE,REFER TO SITE PLAN
FOR BUILDING LOCATION AND ORIENTATION.
•UNIT PLANS MAYBE REVERSED OR ROTATED WITHIN BUILDING PLAN.REFER TO BUILDING PLAN
FOR UNIT LOCATION AND ORIENTATION.
•WALL MOUNTED SERVICE EQUIPMENT AND SERVICE LINES TO BE PAINTED TO MATCH BUILDINGS.
•FIRE EXTINGUISHERS ARE TO BEA MINIMUM 2A 108:0 CLASSIFICATION AND SHALL COMPLY WITH
NFPA 10 GUIDELINES,REFER TO PLANS FOR LOCATIONS.(REFERENCE DETAILS 17/A7-11,18/A7-11)
•ALL FIRST FLOOR DWELLING UNITS ARE TO MEET FHA AND ANSI'B'REQUIREMENTS UNLESS NOTED
OTHERWISE.REFER TO FHA AND ANSI SHEETS FOR MORE INFORMATION.
2
4-2
235'-71/2"
1 1/2" 42'-B" 1 1/2" 34'-4" 1 1/2" 34'-4" 1 1/2" 42'-B" 1 112' 40'-6"
_ 16'-5" 12'41" 12'-B" L16'-5"
BALCONY
BALCONY BALCONY BALCONY
21'-4" 21•4" -
W o BALCONY BALCONY
ATHROOM BATHROOM
BEDROOM BEDROOM BEDROOM BEDROOM
❑' i❑ BEDROOM LIVING ROOM BEDROOM ❑�I �❑
_______ !__________ 7 LIVING ROOM ___________ ----------
LIVING
B 1-2(a) LIVING ROOM ROOM
Q LIVING ROOM LIVING ROOM 4 BI-2(a)
N I CLOSET BEDROOM BEDROOM NIE
1 CLOSET CLOSET
CLOSET B2-2(a)
O B2 2(a)
' A HR M ❑ A2 2 a A2-2(a)
THROO --1 0
-- ---------- DOWN
BATHRO M KI� DOWN �N .O � CLOSE'i � OI � j
_____BEDROOM DOWN CLOSET o CLOSET 3oKITCHEN DOWN KITCHEN BEDROOM
BATHROOM S BATHROOM BATHROOM ----- ---- O BATHROOM
KITCHEN O - O S --_ _____ CLOSET____-❑ ❑ a$ ------ .-------- ❑ _
fD0 -_ CLOSET ____O 3 __On 3 I___I__ O CLOSET - 00-------
❑ O ----1 ------------ ----CLOSET BATHROOM BATHROOM -- KITCHHEN CLOSET -- ----KITCHEN--- ____ BATHROOM
V m _ _
rill
BATHROOM KITCHEN KITCHEN KITCHEN KITCHEN
BEDROOM
.....
—__ DOWN BEDROOM
i i ATHRO THROO y.N
ITHRO THROOM ----------1 CLOS :CLOSET MDOWN DOWN
---------- ❑ 2 ar a 2 ar a ❑ ----------
C ' CLOSET 7 CLOSET ',CLOSET
LOSET
B1-2(a) B2-2gar(a) ® BEDROOM BEDROOM LIVING ROOM ® B2-2gar(a) BI-2(a)
LIVING ROOM
12 6 IT-------_ '---------- LIVING ROOM LIVING ROOM ___________ --------
BEDROOM LIVING ROOM LIVING ROOM BEDROOM
❑ ❑ BEDROOM BEDROOM BEDROOM ❑� ❑
BEDROOM
377
ATHRooM BALCONY BALCONY BATHRoo
BALCONY BALCONY Ll BALCONY BALCONY
16.-5"
40'-6 1 1/2" 42'46" 1 1'.. M-4-- 1 1/2" M-4" 1 1/2" 42"1" 1 1/2" 40'-6"
235'-71/2"
1
4-2
1 BUILDING TYPE 'B' SECOND FLOOR (13,636 SF.)
SCALE:1/8"=1'-0"
COPYRIGHT®HEDK Architects ALL RIGHTS RESERVED
ICON APARTMENT HOMES _ DATE SHEET NUMBER
co AT FERGUSON FARM — PHASE B �—��� 01 -21 -20
SITE DEVELOPMENT A3 12
Lu
(� 01-21-20 A R C H I T E C T S PROJECT
APARTMENTS IN BOZEMAN,MONTANA FOR BUILDING'B'
214.52 BOZEMAN APARTMENTS GROUP PHASE IIT LLC. 420280.. 878 DRIVE ADDISON,TX75001 191 �� SECONDFLOOR PLAN 878 hedk.com