Loading...
HomeMy WebLinkAboutA3-12-Bldg B 2nd Floor Plan_1-21-20 UNIT TYPE KEY BUILDING LEGEND ALL'A'UNITS �ry�y FIRE EXTINGUISHERS ❑ INDICATES 1 BEDROOM SLOPE F.P. FIBER CEMENT PANEL BUSSES 2%MAX P.G. PAINTED GYP.SHEATHING X DOOR KEY ABOVE CHAIR HAIL AND ALL'&'UNITS S MBOLINDICATES FIBER CEMENT PANEL BELOW WINDOW HEY LOCATION OF UNIT RE: GENE R DETAIL -2 BEDROOM O DESIGNATED AS X ANSITYPEW C.J. CONTROL JOINT ALL'C'UNITS (REFER TO SITE PLAN) IFLAOOR,CEILING& ® METER LOCATIONS INDICATES HVAC WW -3 BEDROOM CONDENSING UNIT F.D.C. FIRE DEPARTMENT -- CENTERLINE (REFERTO SITE PLAN MEP) CONNECTION o RADON PIPE F.S.R.R. RIISER PRINROOMLER >� 1 HR.FIRE BARRIER WALL D — 1'-0'RECESS F.F. FINISH FLOOR I IN CEILING B.F.F. BELOW FINISH FLOOR >3>S LOCATION OF STAGGERED L _3RE:17/A2-00 STUD WALLS — B.F.C. BROOM FINISH,NON- SLIP SEALED CONCRETE GENERAL NOTES: •UNITS LABELED ANSI'A TO MEET ANSI A117.1-2009 FOR TYPE A 1003 DWELLING UNIT REFER TO FHA AND ANSI SHEETS FOR ACCESSIBILITY REQUIRE EN S. •ALL FIRST FLOOR DOOR HARDWARE TO BE LEVER HANDLE. •CHANGES IN FLOORING SURFACE TO BE 1/4"MAX.,1/2"MAX.CARPET PILE THICKNESS. •THRESHOLD AT DOORWAYS TO BE 1/4"MAX.OR 1/2"W/45 DEGREE BEVEL. •MAXIMUM FORCE FOR PULLING OR PUSHING SHALL BE 5 LB/FT. •ALL CONTROLS AND OPERATING MECHANISMS SHALL BE MOUNTED BETWEEN 15"-48"FOR A FORWARD OR SIDE APPROACH. GENERAL OR TO INSURE CONTROUEXPAINSN JOINTS IN ARHITECTURAL FNI COORDIINAT TEED WTHSTRUCTURAL LOCATIONS.REFER IT°O MANUFACTURER FOR SPECIFIIC SH ARE REQUIREMENTS PERTAINING TO MATERIAL USED. •METER AND FSRR ARE LOCATED ON A BUILDING-BY-BUILDING BASIS. REFERENCE SITE PLAN FOR LOCATIONS. •BUILDINGS MAY FLIP ABOUT CENTER LINE OR ROTATE,REFER TO SITE PLAN FOR BUILDING LOCATION AND ORIENTATION. •UNIT PLANS MAYBE REVERSED OR ROTATED WITHIN BUILDING PLAN.REFER TO BUILDING PLAN FOR UNIT LOCATION AND ORIENTATION. •WALL MOUNTED SERVICE EQUIPMENT AND SERVICE LINES TO BE PAINTED TO MATCH BUILDINGS. •FIRE EXTINGUISHERS ARE TO BEA MINIMUM 2A 108:0 CLASSIFICATION AND SHALL COMPLY WITH NFPA 10 GUIDELINES,REFER TO PLANS FOR LOCATIONS.(REFERENCE DETAILS 17/A7-11,18/A7-11) •ALL FIRST FLOOR DWELLING UNITS ARE TO MEET FHA AND ANSI'B'REQUIREMENTS UNLESS NOTED OTHERWISE.REFER TO FHA AND ANSI SHEETS FOR MORE INFORMATION. 2 4-2 235'-71/2" 1 1/2" 42'-B" 1 1/2" 34'-4" 1 1/2" 34'-4" 1 1/2" 42'-B" 1 112' 40'-6" _ 16'-5" 12'41" 12'-B" L16'-5" BALCONY BALCONY BALCONY BALCONY 21'-4" 21•4" - W o BALCONY BALCONY ATHROOM BATHROOM BEDROOM BEDROOM BEDROOM BEDROOM ❑' i❑ BEDROOM LIVING ROOM BEDROOM ❑�I �❑ _______ !__________ 7 LIVING ROOM ___________ ---------- LIVING B 1-2(a) LIVING ROOM ROOM Q LIVING ROOM LIVING ROOM 4 BI-2(a) N I CLOSET BEDROOM BEDROOM NIE 1 CLOSET CLOSET CLOSET B2-2(a) O B2 2(a) ' A HR M ❑ A2 2 a A2-2(a) THROO --1 0 -- ---------- DOWN BATHRO M KI� DOWN �N .O � CLOSE'i � OI � j _____BEDROOM DOWN CLOSET o CLOSET 3oKITCHEN DOWN KITCHEN BEDROOM BATHROOM S BATHROOM BATHROOM ----- ---- O BATHROOM KITCHEN O - O S --_ _____ CLOSET____-❑ ❑ a$ ------ .-------- ❑ _ fD0 -_ CLOSET ____O 3 __On 3 I___I__ O CLOSET - 00------- ❑ O ----1 ------------ ----CLOSET BATHROOM BATHROOM -- KITCHHEN CLOSET -- ----KITCHEN--- ____ BATHROOM V m _ _ rill BATHROOM KITCHEN KITCHEN KITCHEN KITCHEN BEDROOM ..... —__ DOWN BEDROOM i i ATHRO THROO y.N ITHRO THROOM ----------1 CLOS :CLOSET MDOWN DOWN ---------- ❑ 2 ar a 2 ar a ❑ ---------- C ' CLOSET 7 CLOSET ',CLOSET LOSET B1-2(a) B2-2gar(a) ® BEDROOM BEDROOM LIVING ROOM ® B2-2gar(a) BI-2(a) LIVING ROOM 12 6 IT-------_ '---------- LIVING ROOM LIVING ROOM ___________ -------- BEDROOM LIVING ROOM LIVING ROOM BEDROOM ❑ ❑ BEDROOM BEDROOM BEDROOM ❑� ❑ BEDROOM 377 ATHRooM BALCONY BALCONY BATHRoo BALCONY BALCONY Ll BALCONY BALCONY 16.-5" 40'-6 1 1/2" 42'46" 1 1'.. M-4-- 1 1/2" M-4" 1 1/2" 42"1" 1 1/2" 40'-6" 235'-71/2" 1 4-2 1 BUILDING TYPE 'B' SECOND FLOOR (13,636 SF.) SCALE:1/8"=1'-0" COPYRIGHT®HEDK Architects ALL RIGHTS RESERVED ICON APARTMENT HOMES _ DATE SHEET NUMBER co AT FERGUSON FARM — PHASE B �—��� 01 -21 -20 SITE DEVELOPMENT A3 12 Lu (� 01-21-20 A R C H I T E C T S PROJECT APARTMENTS IN BOZEMAN,MONTANA FOR BUILDING'B' 214.52 BOZEMAN APARTMENTS GROUP PHASE IIT LLC. 420280.. 878 DRIVE ADDISON,TX75001 191 �� SECONDFLOOR PLAN 878 hedk.com