HomeMy WebLinkAboutA3-11-Bldg B 1st Floor Plan_1-21-20 UNIT TYPE KEY BUILDING LEGEND
ALL'A'UNITS �ry�y FIRE EXTINGUISHERS ❑ INDICATES SLOPE F.P. FIBER CEMENT PANEL
-1 BEDROOM TRUSSES 2%MAX
DOOR KEY
P.G. PAINTED GYP.SHEATHING
%ALL'B'UNITS ABOVE CHAIR RAIL AND
LOCATION INDICATES FIBER CEMENTPANELBELOW
-2 BEDROOM LOCATION OF UNIT RE:CORRIDOR DETAIL
O WINDOW KEY DESIGNATED AS
ANSI TYPE'A' C.J. CONTROL JOINT
ALL'C'UNITS (REFER TO SITE PLAN) WAOOR,CEILING&
-3 BEDROOM ® METER LOCATIONS INDICATES HVAC
CONDENSING UNIT F.D.C. FIRE DEPARTMENT
-- CENTERLINE m (REFER TO SITE PLAN&MEP) CONNECTION
FIRE
o RADON PIPE F.S.RA. RISER ROOMLER
1 HR.FIRE BARRIER WALL r — 1'-0"RECESS F.F. FINISH FLOOR
I IN CEILING B.F.F. BELOW FINISH FLOOR
>� LOCATION OF STAGGERED L _JRE:17/A2-00
STUD WALLS — B.F.C. BROOM FINISH,NON-
SLIP SEALED CONCRETE
GENERAL NOTES:
•UNITS LABELED ANSI'A'TO MEET ANSI Al 17.1-2009 FOR TYPE Af10031 DWELLING UNIT
REFER TO FHA AND ANSI SHEETS FOR ACCESSIBILITY REQUIREMENTS.
•ALL FIRST FLOOR DOOR HARDWARE TO BE LEVER HANDLE.
•CHANGES IN FLOORING SURFACE TO BE 1/4"MAX.,1/2"MAX.CARPET PILE THICKNESS.
•THRESHOLD AT DOORWAYS TO BE 1/4"MAX.OR 1/2"W/45 DEGREE BEVEL.
•MAXIMUM FORCE FOR PULLING OR PUSHING SHALL BE 5 LB/FT.
BETWEENROL�FOR A FORWARD OR SIDE APPROACH. MOUNTED
•GENERAL CONTRACTOR TO INSURE CONTROVEXPANSION JOINTS IN ARCHITECTURAL FINISH ARE
COORDINATED WITH STRUCTURAL LOCATIONS.REFER TO MANUFACTURER FOR SPECIFIC
REQUIREMENTS PERTAINING TO MATERIAL USED.
•METER AND FSRR ARE LOCATED ON A BUILDING-BY-BUILDING BASIS.
REFERENCE SITE PLAN FOR LOCATIONS.
•BUILDINGS MAY FLIP ABOUT CENTER LINE OR ROTATE,REFER TO SITE PLAN
FOR BUILDING LOCATION AND ORIENTATION.
FOR UN NIT LAN MAY BE ATION AND REVERSED
ORIE OR O ROTATED WITHIN BUILDING PLAN.REFER TO BUILDING PLAN
•WALL MOUNTED SERVICE EQUIPMENT AND SERVICE LINES TO BE PAINTED TO MATCH BUILDINGS.
•FIRE EXTINGUISHERS ARE TO BE A MINIMUM 2A IOB:C CLASSIFICATION AND SHALL COMPLY WITH
NFPA 10 GUIDELINES.REFER TO PLANS FOR LOCATIONS.(REFERENCE DETAILS 17/A7-11,18/A7-11)
•ALL FIRST FLOOR DWELLING UNITS ARE TO MEET FHA AND ANSI'B'REQUIREMENTS UNLESS NOTED
OTHERWISE.REFER TO FHA AND ANSI SHEETS FOR MORE INFORMATION.
2
4-2
243'-1 1/2"
7'-6" 40'-6" 1 re 42'-B" 1 (2" 34'-4" 1 /2" 34'-4" 1 /2" 42'-B" 1 /2" 40'-6"
_ ❑ 16•-5• 120 ❑ 17'-S" ❑ ❑ 17-8" ❑ ❑ 16`5• ❑
PATIO I? PATIO PATIO PATIO
IF
21'-4" ❑ ❑ 21•4" UNI -
ABOVE w PATIO PATIO - A DP
BATHROOM Up RBAT.R00M.DTO U BEDROOM BEDROOM BEDROOM TO UNIT
ETEC METERS
� I❑ ABOVE BEDROOM ABOVE BEDROOM UP B2-Igar(a) UPBEDROOM
rn _____ _ !---------
LIVING ROOM IT LIVING ROOM
w ABOVE LIVING ROOM ABOVE LIVING ROOM
LIVING ROOM UP LIVING ROOM Up — —
� CLOSET� � ® BEDROOM BEDROOM ® 4
CLOSET CLOSET CLOSET
B 1-1(a) A2-I gar(a) A2-I gar(a) B2-I gar(a) B 1-1(a)
41
a o BATHROOM BATHROOM
——
-- BATHRO N
I R
ATHRODI
/,� OUBATHROOM
I � �i lip -__.__Ii III _—
LJ �LOSIET
BEDROOM KITCHEN ' BEDROOM
KITCHEN ____ KITCHEN KITCHEN KITCHENBATHROOM CLOSET BATHROOM ---- KITCHEN ---- BATHROOM
O -- CLOSET CLOSET .-
CLOSET
o ----- a -----O
AT HR
i i
,
TIRESTOP TIRESTOP TIRESTOP TIRESTOP "\/
BATHROOM BATHROOM
0 BEDROOM KITCHEN 11 ESTOP TIRESTOP KITCHEN
m BEDROOM
TIRESTOP l'-4" TIRESTOP TIRESTOP TIRESTOP
i;I 11'-4" 12'-0" 4'-B" 13'-0" 16'-8" 11'-10" 11'-10" 16'-8" 13'-0" 4'-8" 12'-0" 1V-4" Iri
I B1-1(a) B2-gar(a) A2-gar(a) A2-gar(a) B2-gar(a)_ B1-1(a) �\ F
N
I
CLOSET' i CLOSET CLOSET CLOSET
GARAGES GARAGE GARAGE UP GARAGE2 GARAGEI GARAGE GARAGE2 GARAGEI GARAGE2 GARAGE m
DIRECT ACCESS DIRECT ACCESS DIRECTACCESS TO UNI DIRECT ACCESS DIRECT ACCESS DIRECT ACCESS DIRECT ACCESS Up DIRECT ACCESS DIRECTACCESS ASSIGNABLE
FSRR LIVING ROOM ABOV UNIT LIVING ROOM
Q 0 ❑� � BEDROOM UP
UP
❑ BEDROOM
NI O UNIT ❑i i❑
TO U
ABOVE ABOVE
BATHROOM UP
TO UNIT _ 0 UNIT BATHROOM
E A
PATIO ❑ ❑
PATIO
❑ v ❑ ❑ ❑ ❑ v F.
7.-6" 40'-6" 1 1/2" 42'-8" 1 1/2" 34 4- TYP 1 1/2":* 34.4- 1 1/2' 42"6. 1 1/2" 40'-6"
243'-1 1 M"
1
4-2
1 BUILDING TYPE 'B' FIRST FLOOR (14,500 SF.)
SCALE:1/8"=1'-O"
COPYRIGHT®HEDK Architects ALL RIGHTS RESERVED
ICON APARTMENT HOMES _ DATE SHEET NUMBER
AT FERGUSON FARM - PHASE B �-��� 01 -21 -20
SITE DEVELOPMENT A3 11
U
(� 01-21-20 A R C H I T E C T S PROJECT
APARTMENTS IN BOZEMAN,MONTANA FOR
ABUILDING'B'
BOZEMANAPARTMENTS GROUP PHASE IIT LLC. 4202B0.. 878 DRIVE ADDISON,TX75001 91 E2 FIRST FLOOR PLAN 214.520.8878 hedk.com