Loading...
HomeMy WebLinkAbout06-08-20 City Commission Packet Materials - C5. PSA w Playco Park Builders Inc for Playground Equipment at Oak Meadows Park Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Addi Jadin, Parks Planner and Development Manager Mitch Overton, Director of Parks and Recreation SUBJECT: Professional Services Agreement with Playco Park Builders for Installation of Playground Equipment at Oak Meadows Park MEETING DATE: June 8, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Professional Services Agreement with Playco Park Builders for Installation of Playground Equipment at Oak Meadows Park BACKGROUND: The City Commission approved Resolution 4830 adopting the amended master plan for Oak Meadows Park on July 17, 2017. The same date, the Commission approved Resolution 4831 to allocate Cash-in-lieu of Parkland funds for up to $102,600.00 for the construction of improvements in Oak Meadows Park. The playground equipment and pavilion have been acquired and the Parks Division is working with the HOA to schedule installation in the summer of 2020. The Scope of Services for the PSA is included as Attachment A and describes the cost associated with the work to be completed. The total amount authorized by the PSA is $16,038.00. UNRESOLVED ISSUES: N/A ALTERNATIVES: As suggested by the commission. FISCAL EFFECTS: The total of the contract is $16,038, with work to be completed during the summer of 2020. Cash-in-lieu of Parkland funding was applied for and awarded via Resolution 4831. Attachments: PSA including Attachment A Report compiled on: May 28, 2020 36 37 38 39 40 41 42 43 44 45 46 47 Playco Park Builders Inc. PO Box 662 Logan, UT 84323 US +1 3039860576 paul@playcoparkbuilders.com Estimate ADDRESS City of Bozeman PO BOX 1230 Bozeman MT 59771 SHIP TO PO Box 662 ESTIMATE #DATE EXPIRATION DATE 4877R3 05/20/2020 08/20/2020 TRACKING NO. 4877R3 DATE SERVICE DESCRIPTION QTY RATE AMOUNT Oak Meadows Park 0.00 Bozeman Montana 0.00 Oodle Swing Installation of Burke Volito Swing 1 1,350.00 1,350.00 1-bay Installation of one bay Swing Set 1 895.00 895.00 Playground Installtion Installation of playground structure 1 6,900.00 6,900.00 Boarders Installation of plastic 4'-4" x 12" x 4" borders. price per 4' border. 58 8.50 493.00 mob Cost to mobilize 1 3,950.00 3,950.00 Travel costs Travel (includes hotel and per diem) costs 1 1,475.00 1,475.00 Permit Fee Cost for obtaining Building Permit and Inspections (does not include cost for the permit itself, or third party inspection fees and will be billed separately, actual cost plus 10%), if needed 1 975.00 975.00 Price dose not include prevailing wage, Davis Bacon Wages, Montana Labor Act or certified payroll if any of them apply it will be an additional cost to the final invoice 0.00 Price assumes all playground equipment is delivered to site, off loaded and staged by others 0.00 48 Price assumes truck access to work area. Price does not include permits or inspections unless otherwise stated. Playco Park Builders inc. will not be responsible for damage to unmarked utilities or irrigation lines. Price does not include repairs to landscape due to completion of scope of work or access. Price does not include prevailing wages or Certified Payroll unless stated. Price is good for 90 days. Price assumes all footing spoils to remain on site unless otherwise stated. Price includes storage of equipment at Playco's yard for up to 30 days, additional storage may be subject to additional charges. Any work not included on this form will not be covered by this price. Any additional charges due to hard digging conditions may be charged. Price assumes all work to be done at one time unless otherwise stated, additional mobilizations will have additional charges. Price assumes the complete scope of work. Additional insurances will be an additional charge. TOTAL $16,038.00 Accepted By Accepted Date 49