HomeMy WebLinkAbout20- Guaranteed Maximum Price Amendment Number 2 - Martel Construction, Inc. - Bogert Pavilion ProjectGUARANTEED MAXIMUM PRICE AMENDMENT (GMP) NO. 2
TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER
Pursuant to Article 4.5 of the Preconstruction Services Conditions Agreement between Owner and
Construction Manager this amendment dated the 29th day of April, 2020, between City of Bozeman
(“Owner”) and Martel Construction, Inc. (“Contractor”) for the Bogert Pavilion Project, hereby
establishes a Guaranteed Maximum Price and Contract Time for the portion of the Project as set forth
below:
GUARANTEED MAXIMUM PRICE FOR BOGERT PAVILION REPAIRS
The Construction Manager’s Guaranteed Maximum Price (GMP) for the Work, including the Cost of the
Work and the Construction Manager’s Fee is as follows:
Base Bid
General Requirements $7,696
Existing Conditions $22,747
Concrete $3,425
Steel $148,762
Wood & Plastics $48,983
Thermal & Moisture Protection $53,243
Finishes $30,100
Fire Suppression $11,132
Electrical $9,753
Site Improvements $2,500
Base Bid Subtotal $338,340
General Requirements $40,643
General Liability Insurance $3,652
Gross Receipts Tax $4,104
Builders Risk $739
Bond $3,365
Construction Fee $19,542
Construction Contingency $30,319
Base Bid Total $440,704
Alternate #1
Thermal & Moisture Protection $174,035
Alternate #1 Subtotal $174,035
DocuSign Envelope ID: 6D0C2A8B-2B1C-4F9A-B315-0D649C9B6A36
General Liability Insurance $1,677
Gross Receipts Tax $1,885
Builders Risk $339
Bond $1,545
Construction Fee $8,974
Construction Contingency $13,923
Alternate #1 Total $202,378
Alternate #2
Electrical $11,446
Alternate #2 Subtotal $11,446
General Liability Insurance $110
Gross Receipts Tax $124
Builders Risk $22
Bond $102
Construction Fee $590
Construction Contingency $916
Alternate #2 Total $13,310
Pre-Construction Services Total $10,352
Early Work Amendment #1 Total $29,970
TOTAL GUARANTEED MAXIMUM PRICE $696,714
CONTRACT TIME
The date of Substantial Completion for the Work outlined above is: September 18th, 2020
OWNER: CONTRACTOR:
City of Bozeman Martel Construction, Inc.
121 N. Rouse Ave. 1203 S. Church Ave.
Bozeman, MT 59715 Bozeman, MT 59715
By:__________________________ By: __________________________
Dennis M. Taylor, Interim City Manager Jason Martel, Executive Vice President
DocuSign Envelope ID: 6D0C2A8B-2B1C-4F9A-B315-0D649C9B6A36