HomeMy WebLinkAboutCity Commission Meeting 5.18.2020 Resolution 5174 Amendment of Street Reconstruction Funding PolicyPage 1 of 5 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Shawn Kohtz, City Engineer Mitch Reister, Public Works Director Anna Rosenberry, Assistant City Manager SUBJECT: Resolution No. 5174 - ESTABLISHING GOALS AND POLICIES FOR THE FUNDING OF STREET RECONSTRUCTION PROJECTS INCLUDING ESTABLISHING A FIXED PERCENTAGE OF FUNDING FOR STREET RECONSTRUCTION AND A MAXIMUM LINEAL FOOTAGE ASSESSMENT TO BE PAID FOR BY THE CREATION OF A SPECIAL IMPROVEMENT DISTRICT BASED ON STREET CLASSIFICATION. MEETING DATE: May 18, 2020 AGENDA ITEM TYPE: Action RECOMMENDATION: Adopt Resolution No. 5174. This Resolution amends existing Resolution 4507 (underline/strikeout indicated in resolution text) STRATEGIC PLAN: Section 4 of the City’s Strategic Plan calls for a Well Planned City stating, “4.3 Strategic Infrastructure Choices: Prioritize long-term investment and maintenance for existing and new infrastructure.” BACKGROUND: Resolution 4507 established policy for the funding of local street reconstruction projects and was adopted in 2014. The Resolution is attached for reference. Resolution 4507 requires a portion of the cost of local street reconstruction projects to be allocated to adjacent property owners through a special improvement district (SID) and the remainder to be allocated to the City Street and Curb Reconstruction Fund per Table 1. The amendment contained in Resolution No. 5174 is to include a not-to-exceed special improvement district assessment, with an annual inflation factor similar to the one used in our impact fee program. Costs above the not- to-exceed assessment will be covered by the Street Reconstruction Fund. 120 Page 2 of 5 Table 1. Local Street Reconstruction Cost Share Average Daily Traffic (vehicles per day) Funding Split (SID/Reconstruction Fund) Less than 800 75%/25% 800-1500 50%/50% 1501-4500 15%/85% More than 4500 100% This amendment is being proposed in response to the large number of Special Improvement Districts that have been protested and not created, leading to the street reconstruction project being abandoned and the streets not improved. If 50 percent of adjacent property owners protest the improvement district, the street reconstruction project is cancelled, and City staff begin work on the next project on the list. Table 2 provides a history of projects; since the program was established, five districts have been successfully created and street reconstructions completed and six districts have failed. Table 2. History of Local Street Reconstruction Projects Since Adoption of Resolution 4507 Special improvement districts that have passed the protest and allowed the street reconstruction project to advance to construction are indicated in green in Table 2. All of the successful projects Project Location Calendar Year SID Passed Project Cost Ave. Cost / Property SID Funding E. Story Street 2015 Yes 610,000.00$ 9,531.25$ 50% N. Wallace Avenue 2016 Yes 2,141,000.00$ 3,751.21$ 15% N. Grand Avenue 2016 No 1,310,230.00$ 15,849.56$ 75% W. Olive Street 2017 No 1,910,210.00$ 4,035.65$ 15% E. Olive Street 2017 Yes 933,000.00$ 3,673.51$ 15% S. Grand Avenue 2018 No 2,330,212.00$ 18,592.12$ 75% S. Tracy Avenue 2018 Yes 1,600,000.00$ 3,157.70$ 15% N. 17th Avenue 2019 No 1,012,000.00$ 13,924.71$ 50% N. Tracy Avenue 2019 Yes 511,000.00$ 9,441.17$ 50% W. Koch Street 2020 No 1,470,000.00$ 16,857.00$ 75% S. 5th Avenue 2020 No 2,329,000.00$ 19,408.33$ 75% W Harrison Street 2021 1,436,474.00$ 75% S. 6th Avenue 2022 2,328,908.00$ 75% S. 3rd Avenue 2023 2,052,724.00$ 75% S. 4th Avenue 2024 1,801,763.00$ 75% E. Davis Street 2025 701,090.00$ 75% *The remainder of the list are previously failed streets 121 Page 3 of 5 that were constructed had a 50% cost share or less to the property owners with assessments ranging from $3,200 to $9,500, financed over 20 years. All projects with a 75% cost split to the property owners have failed to pass an SID protest with costs ranging from $15,900 to $19,400 per average property. Property owners have voiced substantial frustration to City staff with the higher cost split percentages (50% and higher), and all remaining projects on the local street reconstruction project list are estimated to have a 75% cost split to the property owners. The highest SID cost allocated to property owners that has passed the protest is $138 per foot of lot frontage. Although dispite difficulties , the current policy has resulted in five successful projects. City staff have designed and provided construction management services for local street reconstruction projects resulting in savings relative to using consultant design services; however, as Table 2 indicates, our upcoming street reconstruction projects do not have funding splits that we believe will successfully pass SID protests without some revision to our current policies. For example, City staff recently completed preliminary design of two local street reconstruction projects (W. Koch Street and S. 5th Avenue). Upon completion of preliminary design, staff held public meetings with the property owners adjacent to these streets. Staff described the improvements, costs, and policy outlined in Resolution 4507 to the property owners. Both projects were based on a 75% cost split ($16,800-$19,400 financed over 20 years) to the property owners. The property owners were polled to gauge their interest in these projects. Upon taking a vote, both street reconstruction projects had an overwhelming fail vote. Subsequently, both projects were cancelled and placed on the bottom of the local street reconstruction projects list. The estimated cost of the survey work, preliminary engineering, public notification, public meeting, and initial property owner vote to make a decision on an SID is: o $20,000 - $30,000 Topographic Survey o $50,000 preliminary design and mailers Given the time associated with these design elements, two project votes can be presented to property owners in one year. After two unsuccessful SID protests within one fiscal year, there is not enough time to attempt a third vote, complete final design work, and meet the construction timeframe to complete a local street reconstruction project in that fiscal year. Additionally, each time that an SID vote fails, the survey and preliminary design work associated with these projects remains viable for up to two years. After two years, a new survey must be obtained and preliminary design work amended to accommodate new survey information. Lastly, the local streets that remain to be reconstructed, listed in Table 2, are in poor condition and require a relatively large maintenance investment in Streets Division time and materials to keep these streets passable until they can be reconstructed. POLICY RECOMMENDATIONS BY STAFF Suggested Alternative 122 Page 4 of 5 We recommend setting a not-to-exceed assessment of $138 per foot of lot frontage (lineal footage), with that amount increasing each year by the same Construction Cost inflation factor that is used in our Impact Fee program. The remaining cost of a street reconstruction project covered by the City Street and Curb Reconstruction Fund. This represents the highest cost that has successfully passed a local street SID protest to date. The current level of annual funding can be maintained with this policy by skipping a year as necessary between projects to allow the fund to accumulate enough cash to complete the next project. This policy amendment acknowledges the commitment of prior property owners that have approved an SID and places future SID assessments in line with existing SID assessments. UNRESOLVED ISSUES: Leave the policy as-is or amend the policy. ALTERNATIVES: If the policy continues without amendment, we anticipate that all local street SIDs will be protested out for remaining listed projects due to the 75% cost allocation to the adjacent property owners. Other options to consider could include: • A predetermined flat-fee, equal assessment method or a predetermined cost/foot of frontage. This method would not have any relation to the size of property owned. But, this would allow staff to meet with the neighborhood property owners and take an initial SID protest vote without completing a topographic survey, preliminary design work, and cost estimate. As a rough estimate, a local street costs $360/foot to reconstruct. If a flat fee of $9,000/property or $130/foot of frontage were applied, this would be significantly less than the full cost of the project and therefore, encourage property owners to approve the associated SID. The percentage cost split would always be different but the fixed assessment amount would remain the same. This could provide additional clarity to property owners, because they would know their actual assessment with certainty well in advance of the project. • Another option would be to eliminate the local cost split and cover the full project cost from the Street Reconstruction Fund. This would require an increase in the City-Wide Street Maintenance Assessment. Other local streets receive regular maintenance using less costly street treatments such as chip seal or mill-and-overlay methods that are entirely covered by the Street Maintenance Fund. The difference between the Streets listed in Table 2 and other local street maintenance is that the streets in Table 2 have deteriorated to the point that less costly treatments are not viable due to the level of deterioration. FISCAL EFFECTS: If the Resolution is adopted, the change to the policy will alter the cost split between the Street Reconstruction Fund and property owners. Staff estimates that roughly 38% of the cost of future street reconstruction projects would be borne by property owners with the remaining 62% covered by the City Street Reconstruction Fund. 123 Page 5 of 5 Attachments: Resolution No. 5174 Resolution 4507 Street and Curb Reconstruction Fund Capital Improvements Plan 124 COMMISSION RESOLUTION NO. 5174 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, ESTABLISHING GOALS AND POLICIES FOR THE FUNDING OF STREET RECONSTRUCTION PROJECTS INCLUDING ESTABLISHING A FIXED PERCENTAGE OF FUNDING FOR STREET RECONSTRUCTION AND A MAXIMUM LINEAL FOOTAGE ASSESSMENT TO BE PAID FOR BY THE CREATION OF A SPECIAL IMPROVEMENT DISTRICT BASED ON STREET CLASSIFICATION. WHEREAS, the City of Bozeman is committed to addressing the community's expressed needs and desires for services; and WHEREAS, the City of Bozeman is committed to meeting those desires and demands for services in a fiscally responsible manner; and WHEREAS, the City of Bozeman is committed to meeting those desires and demands for services in a manner which recognizes the fiscal and legal interests of all of the system users now and in the future and not a limited subset of users; and WHEREAS, the City of Bozeman has developed and adopted a long range transportation facility plan which examined current and future needs and provides a lawful, logical, balanced, operationally sound, and cost effective basis upon which to maintain and develop the City' s transportation system; and WHEREAS, There is a need to allocate funding for the reconstruction of streets in the City; and WHEREAS, There is a need to establish a maximum per-lineal-foot charge for reconstruction cost that may be assessed to an individual property and paid for through the creation of Special Improvement Districts, and 125 WHEREAS, The City Commission wishes to allocate the costs of street reconstruction equitably among all of the users of the network; NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that Section 1 GOALS The following goals are hereby established for the consideration of the financing of street reconstruction projects in the City of Bozeman: It shall be a goal of the City of Bozeman to invest street reconstruction funds efficiently and equitably by: A. Providing an equitable basis for street reconstruction funding by defining the city's transportation network functional classifications; B. Establishing Street funding categories and allotments for the purpose of determining both the local share and the community share of street reconstruction project costs. Insofar as possible, these categories will be congruent with the city' s transportation network functional classifications; C. Average Daily Traffic volumes used for the street reconstruction program in no way reduces the expected and planned capacities described in the long range transportation plan. D. Establishing a maximum amount assessed (on a per-lineal-footage basis) to an individual property and paid for through the creation of Special Improvement Districts. If a street reconstruction project should be assessed based on an assessment methodology that is not lineal footage, a maximum shall be established by the Commission in the Intention to Create the Special Improvement District. SECTION 2 POLICIES The following policies are hereby established for street reconstruction project financing in the City of Bozeman. 126 1. The following street funding categories and allocations are hereby established for the city's transportation network: Street Classification Average Daily Traffic (vehicles per day) Split (SID or Other Source/Street Reconstruction Fund) Local Up to 800 75% SID or Other Source/25% Street Reconstruction Minor Collector 800-1500 50% SID or Other Source/50% Street Reconstruction Major Collector 1500-4500 15% SID or Other Source/85% Street Reconstruction Arterial Over 4500 100% Street Reconstruction 2. The local share of a street reconstruction project shall be paid for using funds other than the City' s Street Reconstruction Fund, the City's Urban Fund Allocation or any other general obligation fund. The City' s preferred method of generating the local share funds is a Special Improvement District (SID) or other, if applicable, a Payback District. 3. When recent traffic counts for a street eligible for reconstruction. are unavailable, the City Engineering Division will perform counts to establish the Average Daily Traffic. 4, Street Reconstruction projects to be undertaken will be prioritized using combination of the City' s Street Pavement Condition Index (PCI) and traffic volumes, 5. Both the project to be undertaken and the financing allotments to be used will be reviewed and approved by the City Commission at the time of the adoption of the Street Capital Improvement Plan. 6. The City Commission has the discretion to establish the funding allotments to be used in street reconstruction projects in the best interest of the community. 7. There is a maximum amount of $138 per-lineal-foot assessed to an individual property and paid for through the creation of a Special Improvement District. This amount shall be increased by an annual inflation amount based on the value of the Construction Cost Index published in the first December edition of the current year. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 18th day of May, 2020. 127 ___________________________________ CHRIS MEHL Mayor ATTEST: ________________________________________ TANYA ANDREASON Acting City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 128 COMMISSION RESOLUTION NO. 4507 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, ESTABLISHING GOALS AND POLICIES FOR THE FUNDING OF STREET RECONSTRUCTION PROJECTS INCLUDING ESTABLISHING A FIXED PERCENTAGE OF FUNDING FOR STREET RECONSTRUCTION TO BE PAID FOR BY THE CREATION OF A SPECIAL IMPROVEMENT DISTRICT BASED ON STREET CLASSIFICATION. WHEREAS, the City of Bozeman is committed to addressing the community's expressed needs and desires for services; and WHEREAS, the City of Bozeman is committed to meeting those desires and demands for services in a fiscally responsible manner; and WHEREAS, the City of Bozeman is committed to meeting,those desires and demands for services in a manner which recognizes the fiscal and legal interests of all of the system users now and in the future and not a limited subset of users; and WHEREAS, the City of Bozeman has developed and adopted a long range transportation facility plan which examined current and future needs and provides a lawful, logical, balanced, operationally sound, and cost effective basis upon which to maintain and develop the City's transportation system; and WHEREAS, There is a need to allocate funding for the reconstruction of streets in the City; and WHEREAS, The City Commission wishes to allocate the costs of street reconstruction equitably among all of the users of the network; NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana to wit Pagel of 3 129 Resolution 4507, Funding ofStreet Reconstruction Projects SECTION I GOALS The following goals are hereby established for the consideration of the financing of street reconstruction projects in the City of Bozeman: 1.It shall be a goal of the City of Bozeman to invest street reconstruction funds efficiently and equitably by: A. Providing an equitable basis for street reconstruction funding by defining the city's transportation network functional classifications; B. Establishing Street funding categories and allotments for the purpose of determining both the local share and the community share of street reconstruction project costs. Insofar as possible, these categories will be congruent with the city's transportation network functional classifications; C. Average Daily Traffic volumes used for the street reconstruction program in no way reduces the expected and planned capacities described in the long range transportation plan. SECTION 2 POLICIES The following policies are hereby established for street reconstruction project financing in the City of Bozeman. I.The following street funding categories and allocations are hereby established for the city's transportation network: Street huiding Classification Average Daily Trafl]c I'Midhig Split(SID or Other vehicles RecoiiStITICti011 fttild) per day) Local Up to 800 75%/25% Minor collectol. 800 - 1500 50%150% Major Collector 1500 - 4500 15%/ 85% Arterial Over-4500 100% Page 2 of 3 130 Resolution 4507, Funding of Street Reconstruction Projects 2. The local share of a street reconstruction project shall be paid for using funds other than the City's Street Reconstruction Fund, the City's Urban Fund Allocation or any other general obligation fund. The City's preferred method of generating the local share funds is a Special Improvement District (SID) or other, if applicable, a Payback District. 3.When recent traffic counts for a street eligible for reconstruction.are unavailable, the City Engineering Division will perform counts to establish the Average Daily Traffic. 4,Street Reconstruction projects to be undertaken will be prioritized using combination of the City's Street Pavement Condition Index (PCI) and traffic volumes, 5.Both the project to be undertaken and the financing allotments to be used will be reviewed and approved by the City Commission at the time of the adoption of the Street Capital Improvement Plan. 6.The City Commission has the discretion to establish the funding allotments to be used in street reconstruction projects in the best interest of the community. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 3rd day of February, 2014. Ga-e 4,1 JEF7FY6- Kit A USS ti May ATTEST Cit Clerk APPROVED AS TO/PFRM: G TVAN C, ttomey Page 3 of 3 131 STREET & CURB RECONSTRUCTION FUND FINANCIAL SUMMARY Financial SummaryCurrent YearFY20 FY21 FY22 FY23 FY24 FY25UnscheduledProjected Beginning Reserve Balance Dedicated to CIP2,146,605$     1,762,338$        1,723,436$     2,042,724$    2,153,671$   2,348,728$      Plus:  Street Maintenance Assessments Dedicated 709,733$        723,928$           738,406$        753,174$       768,238$      783,603$         Plus:  SID for N Tracy  ‐ SCR16 ‐ 50%506,000$         Plus:  SID for S 5th (Olive to Hayes) ‐75%2,108,490$         Plus:  SID for W Harrison (Tracy to 6th) ‐ 75%1,077,356$       Plus:  SID for S 6th (Babcock to Cleveland) ‐ 75%1,746,681$      Plus:  SID for S 3rd (Olive to Cleveland) ‐75%1,539,543       Plus:  SID for S 4th (College to Babcock) ‐75%1,351,322       Less:  Scheduled CIP Project Costs(1,600,000)$    (2,871,320)$       (1,496,474)$    (2,388,908)$   (2,112,724)$  (1,861,763)$   (10,104,000)$     Projected Year‐End Cash Dedicated to CIP1,762,338$     1,723,436$        2,042,724$     2,153,671$    2,348,728$   2,621,890$    Assumptions Made for Revenue EstimatesCurrent YearFY20FY21FY22FY23 FY24 FY25Total Estimated Annual Street Assessment Revenue709,733$            709,733$                723,928$           738,406$          753,174$         768,238$             Estimated Annual Increase ‐ Attributed to Annexations0.0%2%2%2%2%2%Total Estimated Revenues709,733$            723,928$                738,406$           753,174$          768,238$         783,603$           Current Revenues Dedicated to Street & Curb CIP %100.0%100.0% 100.0% 100.0% 100.0% 100.0%  Plus:  Increase Dedicated to Reconstruction & Curbs0.0%0.0%0.0%0.0% 0.0%0.0%  Total % Dedicated to CIP100.0%100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP709,733$            723,928$                738,406$           753,174$          768,238$         783,603$           ProjectedProjectedCURRENT$(2,871,320)$(1,496,474)$(2,388,908)$(2,112,724)$(1,861,763)$(10,104,000)FY20 FY21 FY22 FY23 FY24 FY25 UNSCHEDULEDSTREET RECONSTRUCTION PROJECTS 208132 STREET & CURB RECONSTRUCTION FUND PROJECT SUMMARY Project # Project NameFY2021 FY2022 FY2023 FY2024 FY2025 UnscheduledSCR01 ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM 60,000     60,000  60,000   60,000    60,000  ‐    SCR13 S 6TH (BABCOCK TO CLEVELAND)‐DESIGN & CONSTRUCTION‐    ‐      2,328,908    ‐   ‐     ‐    SCR14 S 5TH (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION 2,811,320  ‐     ‐  ‐   ‐     SCR15 W HARRISON (TRACY TO 6TH)‐DESIGN AND CONSTRUCTION ‐     1,436,474   ‐  ‐   ‐     ‐    SCR23UNSCHEDULED STREET RECONSTRUCTION PROJECTS  ‐    ‐     ‐   ‐      10,104,000    SCR24S 3RD (OLIVE TO CLEVELAND) ‐ DESIGN & CONSTRUCTION‐    ‐     ‐   2,052,724  ‐     ‐    SCR25S 4TH (COLLEGE TO BABCOCK) ‐ DESIGN & CONSTRUCTION‐    ‐     ‐  1,801,763    ‐    Fiscal Year totals  2,871,320    1,496,474  2,388,908   2,112,724    1,861,763  10,104,000   209133 STREET & CURB RECONSTRUCTION FUND DETAIL BACKGROUND This plan outlines the use of Street Maintenance District dollars that are dedicated to the reconstruction of streets and curbs.  The policy for required matches with Special Improvement Districts (SID’s) is outlined in Commission Resolution No. 4507. Each project is dependent upon the creation of a Special Improvement District to pay for a share of the project costs.  If preliminary information indicates that property owners along the street are likely to have sufficient protests to prevent creation of the SID, we recommend moving to the next project on the list.   CAPITAL PLAN SUMMARY The roads are proposed each year and depending on the preliminary information staff will move forward or move on to the next project on the list. 210134 Project NameYear Description  Amount Total Project #ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  60,000             60,000          DESCRIPTION:‐ WHEN A PEDESTRIAN RAMP IS INSTALLED, MANY TIMES   ‐ THE ADJACENT CURBS NEED TO BE REPLACED IN ORDER   ‐ TO GET DRAINAGE TO NOT STOP AT THE NEW RAMP.      ‐ SMALLER CURB REPAIRS CAN BE NECESSARY RATHER THAN ‐ REPLACING A WHOLE BLOCK. THESE REPAIRS RESULT IN  ‐ IMPROVED STORMWATER CONTROL, AND FACILITATES      ‐ BETTER STREET SWEEPING. ADDITIONALLY, BROKEN CURBS‐ CAN BE HAZARDOUS TO VEHICLE TIRES. THESE          ‐ IMPROVEMENTS CAN BE COMBINED WITH ADA RAMP        ‐ REPLACEMENT WORK AND INLET REPLACEMENT WORK.      ‐ ALTERNATIVES CONSIDERED:‐ CONTINUE CURRENT OPERATIONS‐ ADVANTAGES OF APPROVAL:‐ THIS WILL ALLOW COMPLETION OF SMALLER PROJECTS    ‐ INSTEAD OF WAITING FOR AN ENTIRE BLOCK TO BE      ‐ REPAIRED.                                         ‐ ADD OPERATING COSTS:‐ COST OF MATERIALS‐ ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  2021SCR01  (FY21) 211135 Project NameYear Description  Amount Total Project #ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  60,000             DESCRIPTION:‐ WHEN A PEDESTRIAN RAMP IS INSTALLED, MANY TIMES   ‐ THE ADJACENT CURBS NEED TO BE REPLACED IN ORDER   ‐ TO GET DRAINAGE TO NOT STOP AT THE NEW RAMP.      ‐ SMALLER CURB REPAIRS CAN BE NECESSARY RATHER THAN ‐ REPLACING A WHOLE BLOCK. THESE REPAIRS RESULT IN  ‐ IMPROVED STORMWATER CONTROL, AND FACILITATES      ‐ BETTER STREET SWEEPING. ADDITIONALLY, BROKEN CURBS‐ CAN BE HAZARDOUS TO VEHICLE TIRES. THESE          ‐ IMPROVEMENTS CAN BE COMBINED WITH ADA RAMP        ‐ REPLACEMENT WORK AND INLET REPLACEMENT WORK.      ‐ ALTERNATIVES CONSIDERED:‐ CONTINUE CURRENT OPERATIONS‐ ADVANTAGES OF APPROVAL:‐ THIS WILL ALLOW COMPLETION OF SMALLER PROJECTS    ‐ INSTEAD OF WAITING FOR AN ENTIRE BLOCK TO BE      ‐ REPAIRED.                                         ‐ ADD OPERATING COSTS:‐ COST OF MATERIALS‐ ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM   202260,000          SCR01  (FY22)212136 Project NameYear Description  Amount Total Project #ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  60,000             DESCRIPTION:‐ WHEN A PEDESTRIAN RAMP IS INSTALLED, MANY TIMES   ‐ THE ADJACENT CURBS NEED TO BE REPLACED IN ORDER   ‐ TO GET DRAINAGE TO NOT STOP AT THE NEW RAMP.      ‐ SMALLER CURB REPAIRS CAN BE NECESSARY RATHER THAN ‐ REPLACING A WHOLE BLOCK. THESE REPAIRS RESULT IN  ‐ IMPROVED STORMWATER CONTROL, AND FACILITATES      ‐ BETTER STREET SWEEPING. ADDITIONALLY, BROKEN      ‐ CURBS CAN BE HAZARDOUS TO VEHICLE TIRES. THESE    ‐ IMPROVEMENTS CAN BE COMBINED WITH ADA RAMP        ‐ REPLACEMENT WORK AND INLET REPLACEMENT WORK.      ‐ ALTERNATIVES CONSIDERED:‐ CONTINUE CURRENT OPERATIONS‐ ADVANTAGES OF APPROVAL:‐ THIS WILL ALLOW COMPLETION OF SMALLER PROJECT     ‐ INSTEAD OF WAITING FOR AN ENTIRE BLOCK TO BE      ‐ REPAIRED.                                         ‐ ADD OPERATING COSTS:‐ COST OF MATERIALS‐ ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  202360,000          SCR01  (FY23)213137 Project NameYear Description  Amount Total Project #ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  60,000             DESCRIPTION:‐ WHEN A PEDESTRIAN RAMP IS INSTALLED, MANY TIMES   ‐ THE ADJACENT CURBS NEED TO BE REPLACED IN ORDER TO‐ GET DRAINAGE TO NOT STOP AT THE NEW RAMP.         ‐ SMALLER CURB REPAIRS CAN BE NECESSARY RATHER THAN ‐ REPLACING A WHOLE BLOCK. THESE REPAIRS RESULT IN  ‐ IMPROVED STORMWATER CONTROL, AND FACILITATES      ‐ BETTER STREET SWEEPING. ADDITIONALLY, BROKEN CURBS‐ CAN BE HAZARDOUS TO VEHICLE TIRES. THESE          ‐ IMPROVEMENTS CAN BE COMBINED WITH ADA RAMP        ‐ REPLACEMENT WORK AND INLET REPLACEMENT WORK.      ‐ ALTERNATIVES CONSIDERED:‐ CONTINUE CURRENT OPERATIONS.‐ ADVANTAGES OF APPROVAL:‐ THIS WILL ALLOW COMPLETION OF SMALLER PROJECTS    ‐ INSTEAD OF WAITING FOR AN ENTIRE BLOCK TO BE      ‐ REPAIRED.                                         ‐ ADDITIONAL OPERATING COSTS:‐ COST OF MATERIALS                                 ‐ ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM 202460,000          SCR01 (FY24)214138 Project NameYear Description  Amount Total Project #ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM  60,000             DESCRIPTION:‐ WHEN A PEDESTRIAN RAMP IS INSTALLED, MANY TIMES   ‐ THE ADJACENT CURBS NEED TO BE REPLACED IN ORDER TO‐ GET DRAINAGE TO NOT STOP AT THE NEW RAMP.         ‐ SMALLER CURB REPAIRS CAN BE NECESSARY RATHER THAN ‐ REPLACING A WHOLE BLOCK. THESE REPAIRS RESULT IN  ‐ IMPROVED STORMWATER CONTROL, AND FACILITATES      ‐ BETTER STREET SWEEPING. ADDITIONALLY, BROKEN CURBS‐ CAN BE HAZARDOUS TO VEHICLE TIRES. THESE          ‐ IMPROVEMENTS CAN BE COMBINED WITH ADA RAMP        ‐ REPLACEMENT WORK AND INLET REPLACEMENT WORK.      ‐ ALTERNATIVES CONSIDERED:‐ CONTINUE CURRENT OPERATIONS.‐ ADVANTAGES OF APPROVAL:‐ THIS WILL ALLOW COMPLETION OF SMALLER PROJECTS    ‐ INSTEAD OF WAITING FOR AN ENTIRE BLOCK TO BE      ‐ REPAIRED.                                         ‐ ADDITIONAL OPERATING COSTS:‐ COST OF MATERIALS                                 ‐ ANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM 202560,000          SCR01 (FY25)215139 Project NameYear Description  Amount Total Project #S 6TH (BABCOCK TO CLEVELAND)‐DESIGN & CONSTRUCTION 2,328,908       DESCRIPTION:‐ RECONSTRUCTION OF SOUTH 6TH AVENUE FROM BABCOCK TO‐ CLEVELAND, INCLUDING REPAIRS TO FAILED CURBS &    ‐ GUTTERS. THE STREET IS ALREADY IN A FAILING       ‐ CONDITION AND CONTINUES TO FUNCTION; HOWEVER,     ‐ EVENTUALLY THE STREET WILL BECOME DETERIORATED TO ‐ A POINT WHERE IT IS UNFEASIBLE TO MAINTAIN AND    ‐ KEEP OPEN TO PUBLIC USE. THIS PROJECT WILL PROVIDE‐ A CITY STANDARD STREET SECTION, WITH ADA COMPLIANT‐ PEDESTRIAN RAMPS, PAVEMENT MARKINGS, AND SIGNAGE  ‐ WHICH WILL IMPROVE PEDESTRIAN SAFETY. ALSO, NEW   ‐ ASPHALT AND DRAINAGE IMPROVEMENTS WILL ELIMINATE  ‐ POTHOLES AND MINIMIZE ICE BUILDUP. ADA COMPLIANCE ‐ AND MS4 PERMIT COMPLIANCE WILL BE MET AT          ‐ COMPLETION. THIS PROJECT WILL TRIGGER WATER, SEWER‐ AND STORM DRAIN IMPROVEMENT PROJECTS WITHIN THE   ‐ RECONSTRUCTION AREA. FOR PLANNING PURPOSES,       ‐ PROJECT ESTIMATES SOUTH 6TH TO FUNCTION AS A LOCAL‐ STREET, WHICH WOULD REQUIRE A 75% CONTRIBUTION    ‐ FROM PROPERTY OWNERS VIA A SPECIAL IMPROVEMENT    ‐ DISTRICT ASSESSMENT.‐ S 6TH (BABCOCK TO CLEVELAND)‐DESIGN & CONSTRUCTION  20232,328,908    SCR13 216140 Project NameYear Description  Amount Total Project #S 5TH (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION   2,811,320       DESCRIPTION:‐ RECONSTRUCTION OF SOUTH 5TH AVE FROM OLIVE TO     ‐ HAYES, INCLUDING REPAIRS TO FAILED CURBS AND      ‐ GUTTERS. THE STREET IS ALREADY IN A FAILING       ‐ CONDITION AND CONTINUES TO FUNCTION; HOWEVER,     ‐ EVENTUALLY THE STREET WILL BECOME DETERIORATED TO ‐ A POINT WHERE IT IS UNFEASIBLE TO MAINTAIN AND    ‐ KEEP OPEN TO PUBLIC USE. THIS PROJECT WILL PROVIDE‐ A CITY STANDARD STREET SECTION, WITH ADA COMPLIANT‐ PEDESTRIAN RAMPS, PAVEMENT MARKINGS, AND SIGNAGE  ‐ WHICH WILL IMPROVE PEDESTRIAN SAFETY. ALSO, NEW   ‐ ASPHALT AND DRAINAGE IMPROVEMENTS WILL ELIMINATE  ‐ POTHOLES AND MINIMIZE ICE BUILDUP. ADA COMPLIANCE ‐ AND MS4 PERMIT COMPLIANCE WILL BE MET AT          ‐ COMPLETION. THIS PROJECT WILL TRIGGER WATER, SEWER‐ AND STORM DRAIN IMPROVEMENT PROJECTS WITHIN THE   ‐ RECONSTRUCTION AREA. FOR PLANNING PURPOSES,       ‐ PROJECT ESTIMATES SOUTH 5TH TO FUNCTION AS A MINOR‐ COLLECTOR, WHICH WOULD REQUIRE A 50% CONTRIBUTION ‐ FROM PROPERTY OWNERS VIA A SPECIAL DISTRICT       ‐ ASSESSMENT.‐ S 5TH (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION 20212,811,320    SCR14 217141 Project NameYear Description  Amount Total Project #W HARRISON (TRACY TO 6TH)‐DESIGN AND CONSTRUCTION  1,436,474       DESCRIPTION:                                      ‐                   RECONSTRUCTION OF WEST HARRISON FROM TRACY TO 6TH, ‐                   INCLUDING REPAIRS TO FAILED CURBS AND GUTTERS. THE ‐                   STREET IS ALREADY IN A FAILING CONDITION AND       ‐                   CONTINUES TO FUNCTION; HOWEVER, EVENTUALLY THE     ‐                   STREET WILL BECOME DETERIORATED TO THE POINT WHERE ‐                   IT IS UNFEASIBLE TO MAINTAIN AND KEEP OPEN TO      ‐                   PUBLIC USE. THIS PROJECT WILL PROVIDE A CITY       ‐                   STANDARD STREET SECTION, WITH ADA COMPLIANT        ‐                   PEDESTRIAN RAMPS, PAVEMENT MARKINGS, AND SIGNAGE   ‐                   WHICH WILL IMPROVE PEDESTRIAN SAFETY. ALSO, NEW    ‐                   ASPHALT AND DRAINAGE IMPROVEMENTS WILL ELIMINATE   ‐                   POTHOLES AND MINIMIZE ICE BUILDUP. ADA COMPLIANCE  ‐                   AND MS4 PERMIT COMPLIANCE WILL BE MET AT           ‐                   COMPLETION. THIS PROJECT WILL TRIGGER WATER, SEWER ‐                   AND STORM DRAIN IMPROVEMENT PROJECTS WITHIN THE    ‐                   RECONSTRUCTION AREA. FOR PLANNING PURPOSES,        ‐                   PROJECT ESTIMATES WEST HARRISON TO FUNCTION AS A   ‐                   LOCAL STREET, WHICH WOULD REQUIRE A 75%            ‐                   CONTRIBUTION FROM PROPERTY OWNERS VIA A SPECIAL    ‐                   IMPROVEMENT DISTRICT ASSESSMENT.                   ‐                   UNSCHEDULED STREET RECONSTRUCTION PROJECTS ‐       10,104,000     DESIGN & CONSTRUCTION:                            ‐                   DAVIS (CHURCH TO PLUM) ‐ $702,000                  ‐                   N GRAND (MENDENHALL TO PEACH) ‐ $1,311,000         ‐                   W OLIVE (8TH TO TRACY) ‐ $1,911,000                ‐                   S GRAND (OLIVE TO HAYES) ‐ $2,331,000             ‐                   W LINCOLN (GRAND TO WILLSON) ‐ $247,000           ‐                   S BLACK (COLLEGE TO CUL‐DE‐SAC) ‐ $753,000        ‐                   N 17TH (DURSTON TO END) ‐ $1,114,000              ‐                   W KOCH (8TH TO TRACY) ‐ 1,735,000                 ‐                   UNSCHEDULED STREET RECONSTRUCTION PROJECTS UNSCHEDULED10,104,000  SCR23W HARRISON (TRACY TO 6TH)‐DESIGN AND CONSTRUCTION 20221,436,474    SCR15 218142 Project NameYear Description  Amount Total Project #S 3RD (OLIVE TO CLEVELAND) ‐ DESIGN & CONSTRUCTION 2,052,724       DESCRIPTION:                                      ‐                   RECONSTRUCTION OF S 3RD AVE FROM OLIVE TO          ‐                   CLEVELAND, INCLUDING REPAIRS TO FAILED CURBS AND   ‐                   GUTTERS. THE STREET IS ALREADY IN A FAILING        ‐                   CONDITION AND CONTINUES TO FUNCTION; HOWEVER,      ‐                   EVENTUALLY THE STREET WILL BECOME DETERIORATED TO  ‐                   A POINT WHERE IT IS UNFEASIBLE TO MAINTAIN AND     ‐                   KEEP OPEN TO PUBLIC USE. THIS PROJECT WILL PROVIDE ‐                   A CITY STANDARD STREET SECTION, WITH ADA COMPLIANT ‐                   PEDESTRIAN RAMPS, PAVEMENT MARKINGS, AND SIGNAGE   ‐                   WHICH WILL IMPROVE PEDESTRIAN SAFETY. ALSO, NEW    ‐                   ASPHALT AND DRAINAGE IMPROVEMENTS WILL ELIMINATE   ‐                   POTHOLES AND MINIMIZE ICE BUILDUP. ADA COMPLIANCE  ‐                   AND MS4 PERMIT COMPLIANCE WILL BE MET AT           ‐                   COMPLETION. THIS PROJECT WILL TRIGGER WATER, SEWER ‐                   AND STORM DRAIN IMPROVEMENT PROJECTS WITHIN THE    ‐                   RECONSTRUCTION AREA.                               ‐                   S 3RD (OLIVE TO CLEVELAND) ‐ DESIGN & CONSTRUCTION 20242,052,724    SCR24 219143 Project NameYear Description  Amount Total Project #S 4TH (COLLEGE TO BABCOCK) ‐ DESIGN & CONSTRUCTION1,801,763       DESCRIPTION:‐ RECONSTRUCTION OF S 4TH FROM COLLEGE TO BABCOCK,  ‐ INCLUDING REPAIRS TO FAILED CURBS AND GUTTERS.    ‐ THE STREET IS ALREADY IN A FAILING CONDITION AND  ‐ CONTINUES TO FUNCTION; HOWEVER, EVENTUALLY THE    ‐ STREET WILL BECOME DETERIORATED TO A POINT WHERE  ‐ IT IS UNFEASIBLE TO MAINTAIN AND KEEP OPEN TO     ‐ PUBLIC USE. THIS PROJECT WILL PROVIDE A CITY      ‐ STANDARD STREET SECTION, WITH ADA COMPLIANT       ‐ PEDESTRIAN RAMPS, PAVEMENT MARKINGS, AND SIGNAGE  ‐ WHICH WILL IMPROVE PEDESTRIAN SAFETY. ALSO, NEW   ‐ ASPHALT AND DRAINAGE IMPROVEMENTS WILL ELIMINATE  ‐ POTHOLES AND MINIMIZE ICE BUILDUP. ADA COMPLIANCE ‐ AND MS4 PERMIT COMPLIANCE WILL BE MET AT          ‐ COMPLETION. THIS PROJECT WILL TRIGGER WATER, SEWER‐ AND STORM DRAIN IMPROVEMENT PROJECTS WITHIN THE   ‐ RECONSTRUCTION AREA. FOR PLANNING PURPOSES,       ‐ PROJECT ESTIMATES SOUTH 5TH TO FUNCTION AS A LOCAL‐ STREET WHICH REQUIRES A 75% CONTRIBUTION FROM     ‐ PROPERTY OWNERS VIA A SPECIAL DISTRICT            ‐ ASSESSMENT.‐ S 4TH (COLLEGE TO BABCOCK) ‐ DESIGN & CONSTRUCTION 20251,801,763    SCR25 220144