HomeMy WebLinkAbout15 - Design Report - South University District Ph 1 & Stadium View Apartments Amended for Ph 1B - Sewer Sewer Main Extension Engineer's Report
South University District — Phase 1 , and
Stadium View Apartments
Amended for Phase 1 B
December, 2015
Submitted to:
City of Bozeman Engineering Department
20 East Olive
Bozeman, MT 59715
Montana Department of Environmental Quality
Permitting and Compliance Division
Public Water and Subdivisions Bureau
PO Box 200901
Helena, MT 59620-0901
Prepared by:
Stahly Engineering and Associates
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-9526
���1NEE�f�c
STAH LY
K-Ail NO.
Engineer's Report
Contents
Note: The Engineer's Report format follows DEQ-2 organization. Additional
information required by the City of Bozeman Design Standards is added where
required.
Report Narrative
Chapter 10 — Engineering Reports & Facility Plans
11.1 Engineering Report
11.11 Problem Defined
11.12 Design Conditions
11.13 Impact on Existing Wastewater Facilities
11.14 Project Description
11.15 Design Criteria
11.16 Site Information
11.17 Environmental Impacts
Figures and Tables
Figure 1. Vicinity Map
Figure 2. Sewer Site Plan (included separately)
Table 1. Estimated Water Use Data
Table 2. Capacity of 8" SDR 35 PVC Sewer Main
Sewer Mains 1 12/22/2015
11.1 Engineering Report
The South University District - Phase 1 B is a subsequent minor
subdivision of Lot 2, SUD Subdivision Phase 1. The subsequent division
will provide right of way dedications for South 14th Avenue, State Street
and Campus Boulevard and will result in a 3.66-acre lot (Lot 2A), which
will be the location of Phase 1 B.
Phase 1 B is located within the City of Bozeman west of South 11 th Street
and south of Kagy Boulevard. The subdivision is located west of SUD
Phase 1 Lot 1 (completed Fall 2015) and south of the existing Stadium
Center Subdivision. Phase 1 B is anticipated to be a 208-bed student
housing project.
The property developer's contact information is:
Fountain Residential Partners
2626 Cole Ave, Suite 620
Dallas, TX 75204
Water supply and wastewater treatment will be provided by the City of
Bozeman's municipal systems. The system owner's contact information
is:
City of Bozeman Public Service Department
PO Box 1230
Bozeman, MT 59771-1230
The location of the South University District - Phase 1 B is shown on the
Vicinity Map in Figure 1.
Sewer Mains 2 12/22/2015
w
5
i
t
1
Figure 1. Vicinity Map, Bozeman, Montana
11.11 Problem Defined
City of Bozeman sewer mains currently extend to the eastern boundary of
the property. Connection to the existing sewer infrastructure will take
place at this point. The location of the existing mains and proposed
extensions to the sewer system are shown on Figure 2 at the end of the
report.
The proposed student housing project in Lot 2A will be served by 8" sewer
mains. These mains will connect to the existing 8" sewer mains on Lot 1,
which in turn connect to the existing main on the northern border of Lot 1
at 12i" Avenue (Arianna Way). From this point, an 8" trunk sewer main
flows from south to north through the center of the Stadium Center
Subdivision and continues north eventually reaching the Bozeman
Wastewater Treatment Plant. A sewer capacity analysis of the ability of
the existing sewer to convey the additional sewer flow was conducted in
November, 2014 and showed the existing infrastructure has capacity to
serve SUD Phase 1 B.
11.12 Design Conditions
The sewer flow contributed by the proposed student housing project within
South University District - Phase 1 B was determined in accordance with
Sewer Mains 3 12/22/2015
the City of Bozeman Design Standards. The site for Phase 1 B consists of
a gross area of 6.41 acres, with 3.66 acres in Lot 2A. The peaking factor
used was based on the total population at the connections to the existing
sewer at the east edge of Lot 2A. The sewer flow estimates for the
Stadium View Apartments Phase 1 B are shown in Table 1, below.
Table 1 Stadium View Apartments Phase 1 B Sewer Flow Estimate
Total Site Area acres 3.66
I&I rate d/acre 150
I&I Flow d 549
Student Housing Residents 208
-per capita flow d 89
Student Housing Flow d 18,512
Total Daily Flow d 19,061
Total Daily Flow m 13.2
Peaking Factor 4.14
Peak Flow m 54.8
The proposed 8" SDR 35 PVC sewer mains installed at the minimum
slope of 0.4% have a flow capacity of 312.8 gpm using 75% of the flow
depth of the pipe as required by the City of Bozeman Design Standards
and Specifications Policy. See Table 2 below for the parameters used in
the flow calculation.
Table 2 Capacity of 8" SDR 35 PVC Sewer Main
Status Proposed
Location Phase 1 B
Pipe Material 8"SDR 35 PVC
Pipe Diameter(in) 8
Minimum Pipe Slope (ft/ft) 0.004
Coefficient of Roughness (n) 0.013
Depth in Pipe at 75% Full (in) 6
Depth of Flow(ft) 0.50
Pipe Radius (in) 4
Pipe Radius (ft) 0.33
Wetted Perimeter 1.40
Area of Flow(ft) 0.28
Hydraulic Radius 0.20
Velocity(ft/sec) 2.48
Maximum Pi a Flowrate m 312.8
Avg Flow%of Max Ca acit 4.2%
Peak Flow%of Max Capacity 17.5%
The minimum allowed slope in the minimum pipe size allowed has
sufficient capacity to convey the peak flow from Lot 2A.
Sewer Mains 4 12/22/2015
To allow easier maintenance 6" sewer services are provided for the
proposed buildings.
11.13 Impact on Existing Wastewater Facilities
As previously described, Phase 1 B consists of an additional 208-beds on
lot 2A adjacent to Phase 1.
The proposed Phase 1 B sewer mains connect to existing mains installed
during Phase 1. An existing city sewer main is stubbed to the north
property line of Lot 1 at South 12th Avenue. The capacity of this line to
serve Phase 1 and Phase 1 B was evaluated. The existing service area of
this line was determined and peak flows estimated based on existing land
use. An initial review of pipe capacity showed the limiting section of this
sewer to be located in the alley between 19th and 20th between Olive and
Babcock streets. The flows were monitored for 33 days between August
and September of 2011 and correlated to wet weather peak flows
measured at the treatment plant in early summer.
Sewer flow contributions were determined for the proposed development
using the City's design standards. The existing pipe's capacity was
evaluated with the existing wastewater flows adjusted to wet weather
conditions and the addition of SUD Phase 1 and Phase 1 B contributions.
The existing pipe is at approximately 66% of its 75% flow depth capacity
under wet weather peak flows. SUD Phase 1 and Phase 1 B will
contribute flows equivalent to an additional 21% of the existing pipe's 75%
flow depth capacity, for a total pipe utilized capacity of 87% of the 75%
flow depth. This evaluation shows the existing pipe has capacity to serve
the Stadium View Apartments within its 75% flow depth at peak flow
conditions.
11.14 Project Description
The Phase 1 B Stadium View Apartments project is the second
development phase within the Master Planned SUD Residential Emphasis
Mixed Use (REMU) zoning district.
Six student residential buildings are proposed within the Stadium View
Apartment project. Altogether, the six buildings provide 56 living units and
208 student bedrooms.
11.15 Design Criteria
The South University District— Stadium View Apartments Phase 1 B sewer
main extensions were designed in accordance with Montana Department
Sewer Mains 5 12/22/2015
of Environmental Quality Circular 2, Montana Public Works Standards and
Specifications, City of Bozeman Modifications to Montana Public Works
Standards and Specifications, the Uniform Plumbing Code, and the City of
Bozeman Wastewater Facility Plan.
11.16 Site Information
The site is typical of Bozeman with fine grained soils overlying gravel
deposits. Geotechnical borings have determined the depth to gravel
ranges from 7 to 10 feet. Estimated depth to groundwater obtained from
the geotechnical borings is 6-13 feet. If mains are installed during high
groundwater times dewatering may be required.
11.17 Environmental Impacts
Continued use and new extensions of City of Bozeman municipal sewer
mains has the least environmental impact. No new environmental impacts
will be caused by these sewer main extensions.
Sewer Mains 6 12/22/2015
STAH LY
- STADIUM CENTER SUBDIVISION
I
d
f I �AT
EXISTING SEWER -
_ STAHLY
PHASE: 1 BOUNDARY ENGINEERING
STATE STREET & ASSOCIATES
PROFESSIONAL
ENGINEERS b
www.seaeng.cotom
.Ii-� 404 W. BROADWAY
UILDING 9 !- - I �11 LEWISTOWN, MT 59457
+ / r Phona(406)S35-8594
O s uNlrs/za BDRMS. BLDG 7 BUILDINGS t. BUILDING 3 �� IJ I`1
R.
12 UNITS
12 UNITS/48 BDRMS, ,y' ,(I 33 UNITS/105 BDRMS. � 35EL CENTENNIAL 1
Ph—(406)41 2-859 01
N � _ __.JI� -_, � I` _.__. _....... ._.- --�,.i !, � Fox(406)442-6557
f' ,' ,`♦ 1 `., _. _ - -. -- ,-1 w 851 BRIDGER DR. STE. 1
6 ry - ff pr U BOZEMAN. MT 59715
O SEWER SIZE TYP XIST NG SEWER n
JCS ( ) p I i Phone:4D6 522-9528
N z m Fox:(406)522-952s
N
_
1
� - ' �� _). I�._ ISSUE/REVISION
No. DATE BY
1 1s ISSUE DESCRIPTION
SUED
m 73SPACES I� PAC S Ll
1 ISSUESDESCROPTION
SP�CES I �l
~ teInn _ BUILDING SERVICE lii CONNECT TO --'' No. DATE BY
z z (TYP) EXISTING SEWER { —
I I, 2
mm N _ HA j— � DESCRIPTION
- --
LOT 2A l' LOT 1 F , �` I! I!
-- 3.66 act. N 9.82 ac. .,i N3. DATE BY
v
- - r
u
i DESCRIPTION
1 -
c __ t .•....T,. No. DATE BY
i s
CONNECT TO ' 1 4
ILU DESCRIPTION
EXISTING SEWER
:.•`. c. (_
'.-71 ! ICI �'�,"t.
Q J G 89 SPACES' ^1U / - T No
LLI 0 t 7
I J I I( l I I p DATE
CES
PHASE 1 N �' _ ! �— 5
P
BY
= I - DESCRIPTION
STORMWATER PARK m . -� ;, �_
DETENTION 1+ o II
s II
EXISTING SEWER
y � '
co
a E �
N BLDG 8
BUILDING 6 �I 1- BUILDING 4
LDING 1 BUIL=1O' - 1z uNITs/ !I 1 � I 12 UNITS/48 aDRMS.6UNIT 4B BDRMS.
33 UNITS/105 BDRMS. 1 ! 1
1 J
-
, - 1.. .. 3 -...-._ -.....— —_- ....... - _. __—
SEWER SITE
--jam-- ___
I
v _ I
CAMPUS BLVD CAMPUS BLVD, PLAN
UCKY ROAD) I fi
- -_ ST — --
LOT S (FUTURE PHASE I PHASE 1eAND
` ) I ;I EW AT
SOUSTATH UNIVERSITYNIVIE SIITY
a DISTRICT
7
a I I
N II I. I BOZEMAN,MONTANA
tt)
! JDS
DESIGNED:
0 25 50 100 I� I, I DRAN: PD/JDS
i
I_I I CHECKED:
CDP
DATE 7/27/2015
SCALE IN FEET I I SHEET
fi II FIGURE 2